© 3GPP 2009 Mobile World Congress, Barcelona, 19 th February 2009 SLIDE 0 3GPP RAN4#75 Meeting Arrangement 25 - 29 May, 2015 Fukuoka, Japan Tuomo Säynäjäkangas.

Slides:



Advertisements
Similar presentations
Doc.: IEEE /1196r1 Submission Data Rate and Spectrum Requirements for IEEE aj (45 GHz) Date: Authors: Haiming Wang (SEU)Slide.
Advertisements

© 3GPP 2009 Mobile World Congress, Barcelona, 19 th February 2009© 3GPP GPP The Training Course / Module 1 1 All you always wanted to know about.
Way forward for LTE DL 4Rx AP SI on RF
Resource Allocation and Reuse in LTE. Mobile Communication 2 Markus Laner Seminar, SS Contents Introduction History of Resource Reuse Proposals.
© 3GPP 2009 Mobile World Congress, Barcelona, 19 th February 2009 SLIDE 0 3GPP RAN4#73 UE RF AH Meeting Arrangement Jan, 2015 Oulu, Finland Tuomo.
All you always wanted to know about 3GPP … but were too afraid to ask.
Submission doc.: IEEE /0019r0 March 2015 Steve Shellhammer, QualcommSlide 1 March 2015 Opening Report Date: Authors: Notice: This document.
Doc.: IEEE /0272r0 Submission February 2011 Ron Porat, Broadcom Outdoor Path Loss Models for ah Date: Authors: Slide 1.
3GPP TSG RAN WG 4 Meeting #1 Howard Benn Convenor Tdoc TSG R4#1(99)018.
Doc.: IEEE r1 Submission May Vertical Application TAG May 2015 Meeting Tim Godfrey, EPRISlide 1.
Doc.: IEEE r0 SubmissionSlide 1 Smart Grid SC– March 2012 Date: 15 March 2012 Discussion topics during March Waikoloa Session NameCompanyAddressPhone .
Doc.: IEEE /1377r1 Agenda October 2014 Peter Ecclesine, Cisco Systems IEEE Coexistence Lessons Learned DRAFT Teleconference Plan and Agenda.
© 3GPP 2009 Mobile World Congress, Barcelona, 19 th February 2009 SLIDE 0 3GPP RAN4#76 Meeting Arrangement Aug, 2015 Beijing, China Tuomo Säynäjäkangas.
Doc.: IEEE 802.RR-01/017-r1 Submission November 2001 Vic Hayes, Agere SystemsSlide 1 Opening report Radio Regulations to Radio Working Groups November.
WF on BS MMSE-IRC receiver
All Rights Reserved, Copyright©2008, FUJITSU LIMITED. and FUJITSU LABORATORIES LIMITED. REV Technology Considerations for LTE-Advanced 3GPP TSG.
Doc.: IEEE /0251r0 Submission February 2011 Ron Porat, Broadcom Outdoor Channel Models for ah Date: Authors: Slide 1.
IEEE Session # 3 Closing Plenary Mark Klerer, Jerry Upton Vice-Chairs 24 July 2004 IEEE /13r1.
Questions about LAA deployment scenarios DocumentIEEE Submitted Source Roger B. Marks BaiCells capable.
© 3GPP 2009 Mobile World Congress, Barcelona, 19 th February 2009 SLIDE 0 3GPP RAN4#77 Meeting Arrangement Nov, 2015 Anaheim, CA, US Tuomo Säynäjäkangas.
© 3GPP 2009 Mobile World Congress, Barcelona, 19 th February 2009 © 3GPP 2015 RP-15xxxx What Tuomo and his team achieved 1 3GPP TSG RAN Meeting #70 Sitges,
3GPP2 LTE Workshop SEOUL, Korea, 27 th– 28 th June GPP LTE Status Status Source Source 3GPP TSG RAN Chairman 3GPP TSG RAN Chairman ETSI TC MSG Chairman.
WG-2 - ARC TP #18 Status Report Group Name: oneM2M TP #18 Source: WG2 Chair (Nicolas Damour – Meeting Date: Agenda.
Doc.: IEEE /129r0 Submission May 2000 Vic Hayes, Lucent TechnologiesSlide 1 Report from the Regulatory ad-hoc meeting doc 00/124 Vic Hayes.
Submission doc.: IEEE /0156r0 January 2016 Joseph LEVY (InterDigital)Slide 1 IMT-2020 Discussion Review and Straw Polls Date: Authors:
Clarification of the scope of the study on latency reduction techniques for LTE 3GPP TSG RAN Meeting #71RP-16xxxx Göteborg, Sweden, March , 2016.
© 3GPP 2009 Mobile World Congress, Barcelona, 19 th February 2009 SLIDE 0 3GPP RAN4#79 Meeting Arrangement May, 2016 Nanjing, China Xutao Zhou.
Meeting arrangement Two parallel sessions from Tuesday to Thursday
Offline discussion on remaining details on RRM measurements
1210 MHz of harmonised spectrum (ECC framework)
Way Forward on UE measurement definition and capability
WF on UL Transmission for Difficult Band Combinations in LTE-NR DC
Draft WF on single Tx switched UL
Single Tx switched UL DRAFT 3GPP RAN #77 September , 2017
WF on single switched TX UL
Initial workplan on NR spectrum
WF on single switched TX UL
September 2015 Opening Report
Single Tx switched UL Qualcomm, Intel DRAFT RP GPP RAN #77
MCC TF160 Status Report (Pre-RAN5#75)
3GPP RAN WG5 Chair Phil Brown NTT DoCoMo Inc. R
Vision and Technologies for 5G
R : SRS Enhancements for LTE-A
WF on remaining open items for allowing 1Tx transmission in LTE-NR DC
3GPP RAN WG1 Chairman Matthew Baker
RAN5#57 RF Group Timetable – v1
3GPP RAN WG5 Chair Phil Brown NTT DoCoMo Inc. R Draft v2
3GPP TSG RAN Meeting #67 Shanghai, China, 9 – 12 March, 2015
Nakamura, Takaharu / Fujitsu Issam Toufik/ MCC technical support
Nakamura, Takaharu / Fujitsu
WF on beam reporting CATT, Intel R1-17xxxxx
WF on UE mandatory channel bandwidth for NR bands
WF on scenarios and evaluation assumptions for flexible duplex
WF for 4Rx CA 256QAM(1/2 layer) and 3/4 layers tests in Rel-14
WF on LTE-NR DC with UL coexistence
Long Term Evolution (LTE)
3GPP RAN4#79AH Meeting Arrangement
EXECUTIVE SUMMARY CA combinations are divided into intra-band (contiguous and non-contiguous) and inter-band. Aggregated carriers can be adjacent or non-adjacent.
Scoping Out CA CA(Carrier Aggregation) is a technique used to combine multiple Long ‐ Term Evolution (LTE) component carriers (CCs) across the available.
Antennas Topologies Directly connecting two duplexers together can affect each other’s filter characteristic, thereby losing the isolation that is needed.
LTE-Advanced New UE Categories[4] LTE-Advanced New UE Categories[4]
Mobile Synchronization Trends 4G to 4.5G to 5G
Erik Guttman, Chairman of 3GPP TSG SA Samsung Electronics
“Predictive Mobile Networks”
5G Micro Cell Deployment in Coexistence with Fixed Service
doc.: IEEE yy/xxxxr0 Date:
3GPP RAN1 and RAN4 status on NR-Unlicensed and LAA
WF on LTE-NR Coexistence
3GPP RAN1 and RAN4 status on NR-Unlicensed and LAA
Presentation transcript:

© 3GPP 2009 Mobile World Congress, Barcelona, 19 th February 2009 SLIDE 0 3GPP RAN4#75 Meeting Arrangement May, 2015 Fukuoka, Japan Tuomo Säynäjäkangas RAN4 Chairman

SLIDE 1 Meeting arrangement Common session Mon morning and Fri afternoon (Argos F) RF and frequency bands Mon - Fri (Argos F) RRM and demodulation Mon – Fri (Navis A) Slide 1

SLIDE 2 Tdoc request guideline 3GU tool will be used for both Tdoc number request and submission Note the separate deadlines for Tdoc request and submission! Deadline for Tdoc number request is 10:59 pm UTC on Thu 14 May 2015 In case of problems secretary will allocate CR numbers and provide Tdoc list by 10:59 pm UTC on Fri 15 May 2015 Deadline for Tdoc submission is 10:59 pm UTC on Mon 18 May 2015 NOTE: The deadlines are hard deadlines Tdoc requests received after deadline will be considered as late Documents missing the submission limit will be considered as late Slide 2

SLIDE 3 Document handling guideline Documents missing Tdoc submission deadline 10:59 pm UTC on Mon, 18 May will be marked as late and won’t be treated Please pay attention to presentation time => brief summaries Chairmen will distribute meeting minutes daily Revisions / new tdoc numbers allocated only by the judgment of the chairmen During meeting the deadline for tdoc request is Thu, 28 May, end of the meeting session During meeting the deadline for tdoc submission is Fri, 29 May, 2:00 pm Note: Inbox will be closed at 2:00 pm Please pay attention when you use the reflector to circulate draft documents. If the attachment name matches the pattern ‘R4-14xxxx.zip’, it will be automatically uploaded to the 3gpp ftp server as an official document Only official Tdocs (with proper number) from the inbox/documents folder are formally discussed in the meeting Slide 3

SLIDE 4 Monday, 25 May, 2015 Slide 4 Venue Time A rgos FNavis A 9:00-10:301. Opening of the meeting 2. Approval of the agenda (1) 3. Letters / reports from other groups / meetings (8) Max TA for DuCo (2) 6.7 Dual connectivity for LTE (2) 7.27 LTE 2UL inter-band CA FDD-TDD (3) 10. Liaison and output to other groups (4) 11:00-13: E-UTRA UE RF (core / EMC) (8) E-UTRA UE-UE co-existence (5) E-UTRA UE CA requirements (10) E-UTRA UE Other corrections (5) 6.5 LTE D2D Proximity services (3) LTE D2D Proximity services / RRM (12) LTE D2D Proximity services / Demod&CSI (12) 14:00-16:004. BS spec improvements (4) UTRA BS RF (core/conformance/EMC) (10) E-UTRA BS RF (core/conformance/EMC) (24) MSR BS RF (core/conformance/EMC) (9) BS RF E-UTRA (7) cont Low cost MTC UE for LTE / RRM (10) Low cost MTC UE for LTE / demod (8) LTE TDD eIMTA / Demod (8) 16:30-19:005.1 UE RF (core / EMC) (11) UE-UE co-ex (3) UE CA requirements (19) Other requirements (10) 5.7 Operating bands (2) IncMon for UTRA&LTE General (6) IncMon for UTRA / RRM (9) IncMon for LTE / RRM (13) 19:00-21:00 (ad-hoc) AAS (Chair: Richard Kybett) D2D RRM (Chair: Valentin Gheorghiu)

SLIDE 5 Tuesday, 26 May, 2015 Slide 5 Venue Time A rgos FNavis A 8:30-10: LTE UE TRP &TRS General (7) LTE UE TRP &TRS Hand phantom (2) LTE UE TRP &TRS LEE (1) 7.3 LTE MIMO OTA intro (24) UE UL 64QAM general (3) UE UL 64QAM RF (13) SCE demod (10) SCE CQI (8) SCE RRM (2) 11:00-13:009.1 FS LTE 1980_2170 Korea (10) 8.1 / 2GHz LTE band for Region1 (8) 8.2 AWS Ext band for LTE (13) 6.6 NAICS for LTE (6) NAICS UE demodulation (16) NAICS UE CSI (7) 14:00-16: LAA to unlicensed spectrum (7) Co-existence with other deployments (8) UE and BS operation in 5GHz band (2) cont. 6.7 Dual connectivity for LTE (2) Dual connectivity for LTE / UE demod (7) Dual connectivity for LTE / RRM (18) 16:30-18: LTE Intra Band C CA in Band 8 (7) 7.13 LTE Intra Band C CA in Band 42, 4DL (1) 7.14 LTE Intra Band NC CA in Band 41, 4DL (1) 7.15 LTE Intra Band NC CA in Band 42, 3DL (7) 7.16 Inter Band Carrier Aggregation: Big CRs (8) 7.18 Inter Band Carrier Aggregation: Class A2 (2) 7.22 LTE 2UL inter-band CA General (12) 7.23 LTE 2UL inter-band CA Class A1 (2) 7.26 LTE 2UL inter-band CA Class A4 (2) 7.27 LTE 2UL inter-band CA FDD-TDD (1) cont Dual connectivity Enh for LTE / RRM (21) 18:30-20:30 (ad-hoc) LTE MIMO OTA (Chair: Anatoliy Ioffe) NAICS (Chair: Craig Burnet)

SLIDE 6 Wednesday, 27 May, 2015 Slide 6 Venue Time A rgos FNavis A 8:30-10:30 (Steven Chen chair RF) 7.2 Active Antenna Array System (6) General OTA (11) EIRP accuracy and beam declaration (9) OTA sesnitivity requirements (13) 7.5 CRS IM for LTE / UE dedmod&CSI (15) 7.6 MMSE-IRC for LTE BS (24) 11:00-13:00 (Steven Chen chair RF) Conducted TX requirements (31) Conducted RX requirements (2) Specification organisation and reqs (3) Testing requirements (25) 7.6 cont FE LTE MTC UE RRM (17) 14:00-16: LTE 3DL/2UL general (4) LTE 3DL/2UL UE RF (11) HSPA 2UL UE RF (6) LTE 3-Band CA General / Big CRs (9) cont LTE DL 4RX / General (6) LTE DL 4RX / RRM (11) 16:30-18: Intra-band 2DL combinations (2) Inter-band 2DL combinations (4) Inter-band 3DL combinations (12) LTE DL 4RX / Demod (19) LTE DL 4RX / CSI (4) 7.10 Multiflow enchancements / Demod (4) HSPA 2UL CA RRM (2) 18:30-20:30 (ad-hoc) LAA SI (Chair: Christian Bergljung) UL 64QAM (Chair: Steven Chen) 4RX RRM/demod (Chair: Chris Callender) High speed scenario(Chair: Xizeng Dai)

SLIDE 7 Thursday, 28 May, 2015 Slide 7 Venue Time A rgos FNavis A 8:30-10: LTE 4-Band CA general / Big CR (7) LTE 4-Band CA 4DL combinations (1) LTE TDD-FDD CA (2) LTE TDD-FDD CA 2DL intra (1) LTE TDD-FDD CA 2DL inter (19) LTE CAE beyond 5 carriers / RRM (6) LTE Intra Band C CA in Band 42, 4DL RRM (1) LTE Intra Band NC CA in Band 41, 4DL RRM (1) LTE 3DL/2UL inter-band CA RRM (1) LTE 3-Band CA RRM (2) LTE 4-Band CA UE demod (1) LTE 4-Band CA RRM (4) 11:00-13: LTE TDD-FDD CA 3DL combinations (15) LTE TDD-FDD CA 4DL combinations (1) FE LTE MTC UE max power (6) UTRA Essential Correction - RRM (4) E-UTRA Essential Correction - RRM (7) E-UTRA UE demod (3) 9.2 High speed scenario (38) 14:00-16: FE LTE MTC UE re-tuning (11) FE LTE MTC UE RF (3) LTE 4DL RX UE RF (8) LTE CAEnh beyond 5 carriers / UE RF (4) 9.2 cont. 9.4 Measurement gap enhancement (13) 16:30-18: Indoor positioning enh for UTRA and LTE (3) 7.3 LTE MIMO OTA agreements () 10. Liaison and output to other groups () 11. Revision of the work plan (7/42) RF, 2nd Round 5.3 Rel-12 corrections and TEI (RRM, 45) 18:30-20:30 (ad-hoc) UE CA RF (Chair: Hiromasa Umeda) MMSE-IRC for LTE BS (Chair: Xizeng Dai)

SLIDE 8 Friday, 29 May, 2015 Slide 8 Venue Time A rgos FNavis A 8:30- 10:30 RF, 2nd Round 5.4 UE demod (22) 11:00- 13:00 RF, 2nd Round RRM / demod, 2nd round 14:00- 15:30 RF, 3rd RoundRRM / demod, 3rd round 15:30- 17: Liaison and output to other groups (4) 11. Revision of the work plan (42) 12. Future meetings (0) 13. Any other business (0) 14. Close of the meeting