Project Nexus Workgroup 9 th September 2014. Background During detailed design a number of areas have been identified that require clarification with.

Slides:



Advertisements
Similar presentations
Presenters:- Steve Nunnington xoserve & Sallyann Blackett E.on Sallyann Blackett E.on Rolling AQ – A Straw Man.
Advertisements

PN UNC Workgroup (AQ topic)
12/10/20141 Project Nexus Workgroup Settlement Issues 15 th May 2012.
PN UNC Workgroup (Settlement topic) Allocations Overview 4 th December 2012.
PN UNC Workgroup (AQ topic) Meeting 3, 18 th July 2011.
Proposal to Change the UNC AQ ‘Backstop Date’ to accommodate the 2010 Seasonal Normal Review DESC – 2nd October 2009 NOTE: Instances where TBC is stated.
1 Project Nexus Market Differentiation Topic Workgroup 14 th & 15 th July 2009.
Project Nexus Workgroup Unique Sites 4 th November 2014.
CSEP Transportation Charges 11 th August Background Action NEX0604 from 18 th June PN UNC requested Xoserve to provide a presentation on how Supply.
UNC Urgent Modification Proposal 0275 Supplemental Analysis and Timeline.
Mod 0445 – Amendment to the Arrangements for Daily Metered Supply Point Capacity Ofgem Direction to Provide Further Evidence National Grid Distribution.
PN UNC AMR Topic Workgroup Meeting 19 – Meter Reading.
AQ Overview.  Annual Quantity (AQ) is a value held for each meter point that reflects the expectation as to the volume of gas that a meter point will.
PN UNC Workgroup Supply Point Register 25 th October 2011.
Project Nexus Workgroup AQ Backstop Date Options 7 th October 2014.
UNC Mod 392/ IGT Mod 040 Proposal to amend Annex A of the CSEP NExA table, by replacing the current version of the AQ table August 2011.
UNC G7.3.7 Invoicing Read Estimation Proposal Requirement for Read Estimation & Proposed Methodology Dean Johnson Distribution Workstream – 25 th August.
Project Nexus Workgroup Read Validation following Transfer of Ownership 13 th October
Nexus Workgroup CSEP Transition Topic June
IGT Single Service Provision Requirements Update – 27 th March 2013.
Meter Read Validation 11 th August Background The meter read validation principles were developed under ‘The Settlement’ BRD and formed part of.
PN UNC Workgroup iGT Services 7 th February 2012.
Mod 270 Potential Options Rob Hill 15/02/2009. Six potential options following discussion at last months Development Workgroup OptionNameDescription 1Elective.
Distribution Network Interruption - Initialisation 28 September 2010.
1 v1 iGT CSEP Billing Solution ScottishPower Proposals April 08.
PN UNC Workgroup Settlement topic 4 th October 2011.
Project Nexus Workgroup Extension of Modification 0434 to permit retrospective updates pre-dating Project Nexus Go Live Date 9 th September 2014.
PN UNC Workgroup Read Validation 4 th October 2011.
1 MOD Proposal 0224 Facilitating the use of AMR in the Daily Metered Elective Regime UK Link Implementation Summary & Overview of Solution Options 9 th.
1 Review Group 264 Rules & Options Analysis for BSSOQ Methodology Changes Post MOD th September 2009.
1 Mod Review Group 126 Apr 2007 slides 126 Review Group – Restriction of Invoice Billing Period  These slides describe the business rules for the treatment.
PN UNC 4 th September 2012 Reconciliation Issues (Action: NEX06/02)
Version PNUNC AQ Principles Workgroup Mod 0209 – Rolling AQ Presenter: Steve Nunnington 23 rd March 2010.
PN UNC Workgroup Invoicing 24 th October Objectives of the Workgroups To determine detailed business requirements Consider/review comments made.
1 UNC Review Group 175 – Encouraging Participation in the Elective Daily Metered Regime 26 th June 2008.
UNC Modification Proposal 0380 Periodic Annual Quantity Calculation Calculation of Daily Supply Point Capacity Alan Raper – DNCMF 26 th September 2011.
CONFIDENTIAL - Mod Initial Business Rules © 24 November 2009 EDF Energy plc. All rights Reserved. 1.
MOD Proposal 0224 Facilitating the use of AMR in the Daily Metered Elective Regime 28 May 2009 Code User Pays Services.
PN UNC Workgroup Invoicing 10 th January Objectives of the Workgroups To determine business principles for future Invoicing processes –Consider/review.
UNC Modification Proposal 0202 National Grid Distribution
Project Nexus Workgroup (Settlement)
PN UNC Workgroup Invoicing 4th October 2011.
Nexus Meter Read Performance April 2018
Must Read Process Guide For Shippers
Project Nexus Workgroup
Project Nexus Workgroup
Industry Shipperless & Unregistered Working Group
CSS Consequential Change CoS Shell Record Submission for Discussion at 630R 27th April 2018.
Project Nexus Workgroup
Transporter Initiated SPA Confirmations on behalf of User Potential Impact Discussion with UK Link Committee.
PN UNC AMR Topic Workgroup
PN UNC Workgroup (Settlement topic)
SPA Processes for DM Sites
Deferral of Retrospective Updates Functionality
PN UNC AMR Topic Workgroup
Nexus Workgroup Winter Consumption and the influence on Winter Annual Ratio (WAR) Bands 8th January 2014.
Project Nexus Workgroup
GT Response to Action AMR014 Project Nexus AMR Workgroup 20th July | Energy Networks Association.
AQ BTU Form – Process & Timeline 29th September 2009
DN Interruption Phase II
Project Nexus Workgroup
Invoicing Proposals 20th May 2013
Nexus Workgroup Read Validation Scenarios
Actions Updates Action 0282/006 – Exclude from AQ process
Meter Read Rejections ..
Meter Reads.
Project Nexus Workgroup
COR3007: UNC MOD 450B – Monthly revision of erroneous SSP AQs outside the User AQ Review Period Implementation UK Link Committee – May 2014.
PN UNC Workgroup (AQ topic)
Annual Quantity (AQ) 45.
Presentation transcript:

Project Nexus Workgroup 9 th September 2014

Background During detailed design a number of areas have been identified that require clarification with either UNC or current processes due to the impacts new requirements have on the processes The areas identified are –Supply Point Category definitions in UNC –Primes and Subs –Supply Points that have been Confirmed in error (Mod 517) –Address updates –AQ Correction –Read replacement –Fixed AQ & SOQ

Supply Point Category Supply Point Category is used for Gas Nomination & Allocation processes in Gemini UNC Section A4.4 states: –DM Supply Point whose AQ is greater than 58,600,000 kwh will be classified as DMC – Gas Nominations at Supply Point level –DM Supply Point whose AQ is not greater than 58,600,000 kwh will be classified as DMA – Gas Nominations aggregated for DM Supply Points at Shipper & LDZ level –DM Supply Point whose AQ is greater than 1,465,000,000 kWh will be classified as VLDMC – Gas Nominations at Supply Point level –NDM Supply Points will be classified as NDMA – aggregate of NDM Supply Meter Points for a Shipper & LDZ Energy Balancing Scheduling charges differ for VLDMC, DMC & DMA.

Supply Point Category cont. Class 1 & 2 will be either DMA, DMC or VLDMC depending on AQ Class 3 & 4 will be NDMA Currently the Supply Point Category (SPC) does not change as a result of the annual AQ review –Based on UNC it should Following implementation of rolling AQ the SPC could potentially change monthly –This will affect the way Shippers submit their gas nominations & view gas nominations & allocations

Supply Point Category Proposals Proposal Supply Meter Point with AQ greater than 1,465,000,000 kWh is VLDMC (no change) All Class 1 Supply Meter Points have a SPC of DMC All Class 2 Supply Meter Points have a SPC of DMA All Class 3 & 4 are classed as NDMA (no change) Where the Supply Meter Point changes Class, the SPC will be changed and the Shipper advised If agreed this will require a change to UNC

Prime and Sub sites A Shipper is able to nominate any Prime or Sub Supply Meter Point that is not DM Mandatory to Class 2, 3 or 4 Shippers will have the obligation to submit reads based on the election of Class (daily reads for Class 2, daily reads in batches for Class 3 & periodically for Class 4). Xoserve, on behalf of the GT, will only request a read for Reconciliation purposes (in order to net off the Prime or Sub meter) and perform reconciliation on the Sub. The request will be triggered based on the lowest denominator meter read frequency of any of the meter points within the P&S configuration in Class 4

Prime & Sub Reads Matrix for Reconciliation Reconciliation only required where daily reads are not received - where the Prime or Sub is a Class 4 Supply Meter Point only Class 1 Prime Class 2 Prime Class 3 Prime Class 4 Prime Class 1 Sub XXXY Class 2 Sub XXXY Class 3 Sub XXXY Class 4 Sub YYYY

Prime and Sub sites cont. Shipper will be responsible for carrying out Check Reads for Supply Meter Points in Class 2, 3 & 4 & notifying Xoserve of the info & re-synch where applicable (if AMR is fitted). –This obligation will not default to the GT The Shipper will be responsible for submitting the transfer read, where not submitted an estimate will be loaded Must Reads are applicable to P&S

Confirmed in Error (Mod 517) Current process; –Shipper submits a query via CMS (ECO) along with ‘Warrant’ –Where valid and accepted the Shipper is notified and requested to submit an Isolation & Withdrawal –A dummy meter is recorded by Xoserve to enable the Shipper to isolate & withdraw (current system constraint) –Any financial adjustments are processed once the I&W is recorded Proposal; –Shipper submits a Withdrawal (no requirement to attach asset record) –The financial adjustment is processed once the Withdrawal is confirmed and effective

Address Updates If an address update is submitted that amends the LDZ and or Exit Zone this will be effective 2 days from receipt without the need for the shipper to re-confirm Where there is a change in the LDZ and potentially a change in the rates applied for transportation charges an updated Offer must be submitted (UNC section G2.4) So, where there is an address update which changes the LDZ or Exit Zone an updated Supply Point Offer will be issued to the Shipper

AQ Correction The AQ Correction process was designed around the existing process for a Shipper to update an AQ (BTU) Recognised that a process will still be required for exceptional circumstances to change the AQ –New business activity (G1.6.21c) –Theft of Gas (G1.6.21a) –Read fails the Outer Tolerance (‘Market Breaker’) (G1.6.22) –Material change in consumer plant (G1.6.21b) Currently for a new business activity the Shipper must submit the request 23 business days from Registration Proposal that a limit for a new business activity request to continue –If agreed needs to go into UNC

Read Replacement Proposal agreed to allow updates to Supply Point and meter information for an effective date pre Go Live Proposal to also allow replacement of meter reads submitted pre Go Live –Negates the need and complexities around submission of consumption adjustments during the cutover period Same rules would apply as defined by Mod 0434 –Reads are validated against the tolerances –Only the Shipper who submitted the read can replace it –Can only replace an existing read, no in-fill reads, unless submitted with an asset update –Read must be higher than previous actual read and lower than subsequent actual read

Fixed AQ & SOQ For Class 3 and 4 Supply Meter Points there will be two AQ’s & SOQs; –Rolling AQ for allocation purposes –Fixed AQ & SOQ for transportation charges The fixed AQ & SOQ will be the value set on 1 st December each year and will go live for transportation charges in the following April On implementation date the AQ & SOQ used for transportation charges will be the value set on 1 st October 2015 On 1 st December 2015 the AQ & SOQ will be set and effective for 1 st April 2015 transportation charges