Capacity Building and Developing Countries in GEO (summary of workshop discussions) Hilcea Ferreira INPE-Brazil Andiswa Mlisa GEO Secretariat ( Acknowledgement.

Slides:



Advertisements
Similar presentations
Maryse Robert, Director Department of Economic and Social Development Executive Secretariat for Integral Development San Pedro Sula, Honduras, September.
Advertisements

Chapter 8: Capacity Building Presented by Co Chair Mr. John Briceño CCAD Central American Countries 11/29/2003.
Capacity Building Mandate We, the participants…recognize the need to support: …A coordinated effort to involve and assist developing countries in improving.
Alan Edwards European Commission 5 th GEO Project Workshop London, UK 8-9 February 2011 * The views expressed in these slides may not in any circumstances.
© GEO Secretariat The Group on Earth Observations – Status and Post 2015 Osamu Ochiai GEO Secretariat 41 st CGMS Tsukuba, Japan 8-12 July 2013.
Session 9. New activities André Obregón, Rapporteur GEO Work Plan Symposium Geneva, 5-7 May 2015.
READINESS TO IMPLEMENTATION Lessons and Experiences from Zambia Presented by: Deuteronomy Kasaro National REDD+ Coordinator 7th November,
2016 Transitional GEO Work Programme Discussion & CONSOLIDATION Session 10, 2015 GEO Work Plan Symposium Geneva, 7 May 2015 Alan Edwards (IPWG) Giovanni.
STRENGTHENING the AFRICA ENVIRONMENT INFORMATION NETWORK An AMCEN initiative A framework to support development planning processes and increase access.
AGENDA ITEM 4: FOLLOW-UP ON THE DECISIONS OF THE WORLD METEOROLOGICAL CONGRESS ON THE INTERGOVERNMENTAL BOARD ON CLIMATE SERVICES AGENDA ITEM 4.1.2: INITIAL.
Critical Role of ICT in Parliament Fulfill legislative, oversight, and representative responsibilities Achieve the goals of transparency, openness, accessibility,
Aldona Kowalczyk-Rębiś Agnieszka Kowalska
GEO Work Plan Symposium 2012 ID-05 Resource Mobilization for Capacity Building (individual, institutional & infrastructure)
GEO Strategic Plan : Implementing GEOSS AN UPDATE GEO WORK PLAN SYMPOSIUM 05 MAY 2015 GENEVA, SWITZERLAND.
Engagement actions Andiswa Mlisa Rapporteur, Session 7 GEO Work Plan Symposium, 5 – 7 May 2015, Geneva, Switzerland.
Global Action Plan and its implementation in other regions Meeting for Discussion of the draft Plan for the Implementation of the Global Strategy to Improve.
GEOCAB portal 18 September 2014 IDIB meeting, Enschede Gregory Giuliani University of Geneva UNEP/GRID-Geneva Jean-Christophe Desconnets IRD.
Task ID-05 IDIB report ID-05 Catalyzing Resources for GEOSS Implementation C1 - Resource Mobilization for Capacity Building C2 - Resource Mobilization.
6. Strategic Plan : Implementing GEOSS Validating the way forward: Review of feedback from Plenary.
Michalis Adamantiadis Transport Policy Adviser, SSATP SSATP Capacity Development Strategy Annual Meeting, December 2012.
UNDP-GEF Adaptation 0 0 Impact of National Communications on Process of Integrating Climate Change into National Development Policies UNFCCC Workshop on.
6th GEO Capacity Building Committee Meeting Hanover, Germany 13 to 14 February 2008 CB-07-01a Marta ANGOLOTI INM Spain.
© GEO Secretariat 5.2 Monitoring and Evaluation John Adamec Co-Chair, M&E Working Group GEO-XI Plenary November 2014 Geneva, Switzerland.
Development and Transfer of Technologies UNFCCC Expert Workshop On Technology Information Technology Transfer Network and Matchmaking Systems: a LA & C.
Data Democracy Pakorn Apaphant May 11, 2009 WGISS 27 Toulouse, France.
7 th GEO Capacity Building Committee Meeting Tashkent, Uzbekistan 3-4 June 2008 CB-07-01a Task report Marta ANGOLOTI AEMET Spain.
Presentation to REI Update meeting Rajasthan, April 2006 Astrid Dufborg Executive Director.
THE GEO GLOBAL CAPACITY BUILDING SYMPOSIUM Seville (Spain) September 10 & 11, 2007.
Sub-Regional Workshop for GEF Focal Points in Eastern and Southern Africa Nairobi, Kenya, May 2009 Leveraging national communications to integrate.
8 TH -11 TH NOVEMBER, 2010 UN Complex, Nairobi, Kenya MEETING OUTCOMES David Smith, Manager PEI Africa.
GEO Work Plan Symposium 2012 ID-03: Science and Technology in GEOSS ID-03-C1: Engaging the Science and Technology (S&T) Community in GEOSS Implementation.
April_2010 Partnering initiatives at country level Proposed partnering process to build a national stop tuberculosis (TB) partnership.
The Use of the Targets by the Institutions & Development Implementation Board in Monitoring the Work Plan Implementation 2nd GEOSS Science and Technology.
Synthesis of Strategic Issues (Climate, Disasters, Water) and a draft European strategic framework.
Co-Chair Comments – Session 2 Gary Foley, Rick Lawford With inputs from Presenters and Douglas Cripe GEO Work Planning Session Geneva April 28-30, 2014.
The ILO’s approach to Decent Work for Young People Giovanna Rossignotti Coordinator Youth Employment Programme Course (A300850) - Trade union training.
1 IMPLEMENTATION STRATEGY for the 2008 SNA OECD National Accounts Working Party Paris, France 4 to 6 November 2009 Herman Smith UNSD.
DEVELOPMENT COOPERATION FRAMEWORK Presentation by Ministry of Finance 10 December 2013.
Consultant Advance Research Team. Outline UNDERSTANDING M&E DATA NEEDS PEOPLE, PARTNERSHIP AND PLANNING 1.Organizational structures with HIV M&E functions.
The implementation programme for the 2008 SNA and supporting statistics UNECE special session on National Accounts for economies in transition Geneva,
Capacity Building & the European Community Research Framework Programme: (FP7) Alan Edwards European Commission.
CLUSTERING PROJECT Oto Hudec Faculty of Economics Technical University of Košice.
FAO Turkey Partnership Programme (FTPP) FAO Final Evaluation of the FTPP Summary for FTPP Programming Meeting, 14 December
Committee on Earth Observation Satellites CEO Team 29 th CEOS Plenary Kyoto International Conference Center Kyoto, Japan 5 – 6 November 2015 CEOS and GEO.
GEO Implementation Boards Considerations and Lessons Learned (Document 8) Max Craglia (EC) Co-chair of the Infrastructure Implementation Board (IIB) On.
Leveraging national communications to integrate climate change issues into development policy Sub-Regional Workshop for GEF Focal Points in West and Central.
Managing the National Communications Process UNFCCC Workshop on Exchange of Experiences and Good Practices among NAI Countries in Preparing NCs September.
GEO Work Programme 2016 WGISS#40 HARWELL (UKSA) 28 SEP - 02 OCT 2015 MIRKO ALBANI, ESA.
GEO Implementation Mechanisms Giovanni Rum, GEO Secretariat GEO Work Programme Symposium Geneva, 2-4 May 2016.
Science & Technology for National Progress in African Region: Highlights of Regional Strategy and Action Professor Gabriel B. Ogunmola, FAS President,
WGCapD, CEOS and the UN Sustainable Development Goals (SDGs) Committee on Earth Observation Satellites Deputy CEOS Executive Officer / CSA Marie-Josée.
GEO 2016 Work Programme Giovanni Rum, GEO Secretariat GEO Work Programme Symposium Geneva, 2-4 May 2016.
COST Action and European GBIF Nodes Anne-Sophie Archambeau.
Report from GEO Post-2015 WG and GEO Ministerial WG D. Brent Smith, NOAA CEOS Representative CEOS SIT-28 Meeting Hampton, Virginia, USA 12 March 2013.
Capacity Building in: GEO Strategic Plan 2016 – 2025 and Work Programme 2016 Andiswa Mlisa GEO Secretariat Workshop on Capacity Building and Developing.
GEO Strategic Plan : Implementing GEOSS Douglas Cripe GEO Work Programme Symposium 2-4 May 2016, Geneva.
Foundational Task prioritization: Outcomes of PB meeting
GEO Capacity Building Capacity Building in GEO WP 2017 – 2019 Capacity Building Coordination TT Capacity Building Forum GEO WPS May 2017.
Summary of the Outcomes of the 1st AfriGEOSS Steering Committee Meeting Humbulani Mudau DST, South Africa 1st AfriGEOSS Symposium 27 – 29 April 2016.
Giovanni Rum, GEO Secretariat GEO Work Programme Symposium
2016 Symposium Outcomes, Steering Committee & Caucus Recommendations AfriGEOSS Implementation Humbulani Mudau SC Co-Chair 2nd AfriGEOSS Symposium 13.
Programme Board 6th Meeting May 2017 Craig Larlee
Capacity building coordination Mark Noort HCP International Andiswa Mlisa GEO secretariat GEO WP Symposium Geneva, Switzerland May 4th, 2016.
ID-02 – Developing Institutional and Individual Capacity Andiswa Mlisa GEO Secretariat TC: Gregory Giuliani (Switzerland, UNIGE) PoC: Hilcea Ferreira.
Capacity Building Enhance the coordination of efforts to strengthen individual, institutional and infrastructure capacities, particularly in developing.
GEO Capacity Building Coordination Capacity Building in GEO WP 2017 – 2019 Capacity Building Coordination TT GEO Programme Board Meeting 23 – 24 May.
Oceans and Society: Blue Planet
The Role of Bilateral Donors in supporting capacity-building in the area of ICT Open Consultations on Financing Mechanisms for Meeting the Challenges.
High level seminar on the implementation of the
RCA Workshop on RCARO Future Strategies July 2007
Presentation transcript:

Capacity Building and Developing Countries in GEO (summary of workshop discussions) Hilcea Ferreira INPE-Brazil Andiswa Mlisa GEO Secretariat ( Acknowledgement to Workshop Participants) GEO Work Plan Symposium, 5 – 7 May 2015, Geneva, Switzerland

Outline Objectives Participants Food for Thought Infrastructure Development Individual & Institutional Capacity Development Capacity Building in Societal Benefit Areas National and Regional Coordination Resource Mobilization Capacity Building in … –GEO Strategic Plan –Work Programme 2016

Workshop Objectives 1.Outline capacity building plans and activities in GEO for the next decade (2016 – 2025); and 2.Provide inputs to the Implementation Plan Working Group (IPWG) on how GEO can better engage and involve developing countries. Included: Sharing of current capacity building activities Step toward identifying new contributors to capacity building activities

Participants 38 Participants Government National GEOs Regional Training Centers Research Institutions Private Sector UN Agencies Programmes Resource providers

Food for thought Capacity Building or Capacity Development or can we agree in GEO which ever term we use is inclusive of the other? “Lessons Learned” process into a “Lessons Identified” Portal – capture positive and negative lessons learned; Sustainability: –We tend to lose knowledge already gained; –Need to look beyond the pilot projects (+/- 3 year time frames) – capacity built is not maintained and cooperation may be lost; –Funding tends to be finished (or not include) before impact assessment of activities has been done; –Engage next generation (youth and young professionals); –To build sustainable capacity, building trust is a key factor; GEO to consider the 3 “O’s”: Outreach, Outputs, Outcomes;

Food for thought (cont.) Where to focus capacity building and development in the chain from global to individual? Leverage complementary capabilities that go along with technology transfer; Communication GEO to communicate not only with the official delegation – needs time and work to do the connections; Communicating our efforts and value of EO critical – using the right mechanism (such as journalists) to reach policy makers. Ownership Relationship between funders, implementers and beneficiaries need to be informed by a partnership with a goal for ownership. Co-design, co-create and co-usage = we must learn how decision makers make decision and use the tools we provide

Infrastructure Development Systems such as GEONETCast are crucial for capacity building and developing countries; Partnership with local partners to ensure local maintenance of installed infrastructure; We need to integrate the infrastructure for users to get the information and for them to document their requirements – build an infrastructure that builds capacity; Continue with making open source software available; Maintenance and marketing of the GEOCAB – capacity building resources – Portal; GCI to provide a mechanism that enables leveraging of national investments in development information systems; Appreciating the open access policies  is there access to this data, especially with the bandwidth and electricity problems for developing countries = GEO advocates for bandwidth access in Africa;

Individual & Institutional Capacity Development Undertaken at various levels (training workshops, fellowship, undergraduate and post graduate qualifications; professional development courses) by various institutions and organizations through various mechanism (home based, in-service, face-to-face, e-learning etc.); Collaboration between developing and developed countries institutions Built institutional capacity through value proposition that survives political and democratic processes; Universities and research institutions have a key role to play, both for sensitizing governments and engaging the youth  organize annual EO youth conference.

Individual & Institutional Capacity Development (cont.) Move toward consolidated (long-term) approaches for CB (such as encourage post graduate qualifications); Through National and Regional GEOs facilitate collaboration and information dissemination to individual and research groups; EO Capacity Building as a business opportunity - promote small business enterprises; Use and coordination of in-situ data not explicitly addressed;

Capacity Building in Societal Benefit Areas A lot of capacity building is undertaken under SBAs such as in Disasters, GFOI, GEOGLAM, Water etc. Encourage each SBA to have a clear capacity building component CB Task to provide a coordination and support function

National and Regional Coordination National GEO Mechanisms –Number of GEO Members have national GEO mechanisms and establishment of regional mechanisms in process (AfriGEOSS); –Enables identification of national priorities and a strong regional mechanism; –Define capacity development at national level (technology transfer or building capacity for technology to be used for applications) and how it is institutionalized; Need to be strengthened, to further open the conversation – we mostly talk to ourselves; Provides access to the grassroots users, empowering them with capability to use data;  Secretariat provide support and nurture national efforts;

Resource Mobilization Considering the number of occurring activities, lack of funding may not be the major issue, but coordination; Reinforcement by grant and sponsor providers for projects and programs to be contributions to regional coordination mechanisms such as AfriGEOSS; Move towards comprehensive programs approach rather than project approach; Welcomes the proposal for Foundational Task Capacity Building Coordination be resourced through the Trust Fund with Members and PO contributions; –Workshop participants (Members and POs) indicated willingness to contribute to capacity building through their existing programs;

GEO Strategic Plan : Stakeholder Engagement Focus of CB to be broaden, not exclusive on developing countries, rather sharply focused; CB should be present in all implementation mechanisms, especially in initiatives and flagships, with a clear CB component; CB Foundational Task to coordinate and work with all to design and implement the best ways to conduct capacity building; CB has to be feasible for developing countries considering their own languages and cultural features;

GEO Strategic Plan : CB Core Functions Very weak, passive, short-term and reducing the value of work done to date & vision of the existing CB strategy; The core functions must represent the I3 (Individual, Institutional and Infrastructure) concept; How GEO will support the sustainability (and ownership) of the capacity after it is developed; Too much focus on the more technical & scientific CB aspect GEO CB should focus on: –Scientific and non-scientific objectives in order to enable informed decision making to address societal challenges. –Broader sources of knowledge and interactions among a wide range of stakeholders (universities, firms, farmers, government organizations, etc.) through which individuals and organizations learn, put new ways of working to use, and open up new technological pathways) –Involves support for many skills and activities GEO to support development of regional and national Earth Observation plans; build capacity and share best practices to develop the regional and national EO plans;

GEO Strategic Plan : CB Targets Targets would be stronger if they were measurable e.g. "Increase developing country participation in GEO initiatives by 50% by 2020." Proposed target: Strengthen partnerships between GEO and other organizations leading related capacity building initiatives in data science and other areas related to Earth Observations;

GEO Work Programme 2016: FT 15 CB Coordination Current proposal is a good start; Formulation of the Coordination Team (WG) to include representatives from SBAs Reporting mechanism not to be unique to the GEO process but rather useful for contributors elsewhere (e.g. contributors may send Secretariat same report they have sent to funders) Additional activities: –Undertake a SWOT analysis of contributing Members and POs –Partner with RDA and CODATA to establish an ongoing series of generic and specialized data science short courses with a focus on Earth Observations Proposed engagement mechanisms –Host annual EO CB conference –Hold annual CB workshop per SBA per year – organized by the SBA or CoPs –Propose: Infrastructure that creates capacity building side event, during GEO-XII Plenary.

THANK YOU