doc.: IEEE /1546r0 Submission November 2014 Clint Chaplin, Samsung ElectronicsSlide Liaison Report Date: Authors:
doc.: IEEE /1546r0 Submission November 2014 Clint Chaplin, Samsung ElectronicsSlide 2 Abstract Liaison report on as presented to
doc.: IEEE /1546r0 Submission November 2014 Clint Chaplin, Samsung Electronics Slide d 100 Gb/s Worked on –Applications Requirements Document (ARD) (Document d) –Channel Modeling Document (CMD) (Document d) –Technical Requirements Document (TRD) (Document d) Clint Chaplin, Samsung ElectronicsSlide 3
doc.: IEEE /1546r0 Submission November 2014 Clint Chaplin, Samsung Electronics Slide n Chinese Medical Band Letter Ballot (LB-96) Results: –Yes 94, No 5, Abstain 8 LB-96 Passed with 44 comments No new “No” voters, all comments editorial Addressed all of the comments Going out for last recirculation WG ballot after meeting Setting up sponsor ballot pool Clint Chaplin, Samsung ElectronicsSlide 4
doc.: IEEE /1546r0 Submission November 2014 Clint Chaplin, Samsung ElectronicsSlide q Ultra Low Power First Initial WG Ballot LB95 on draft 1.0 closed October 10, Results 68/12/ % Passed! Received 300 comments; 200 resolved. Set up BRC to finish addressing comments and send updated draft out for recirculation Hope to get recirculation done by next meeting Clint Chaplin, Samsung ElectronicsSlide 5
doc.: IEEE /1546r0 Submission November 2014 Clint Chaplin, Samsung ElectronicsSlide r Distance Measurement Techniques Completed Technical Guidelines document Revised timeline for call for proposals –Call for for preliminary proposals now January 2015 Clint Chaplin, Samsung ElectronicsSlide 6
doc.: IEEE /1546r0 Submission November 2014 Clint Chaplin, Samsung ElectronicsSlide s Spectrum Resources Usage Issued a call for proposals for the Technical Guidance Document Clint Chaplin, Samsung ElectronicsSlide 7
doc.: IEEE /1546r0 Submission November 2014 Clint Chaplin, Samsung ElectronicsSlide Peer Aware Communications PHY draft completed Progress made on MAC components Presentations for harmonization and drafting –662r1,679r0: Frequency Channel Selection (Huan-Bang Li) –678r2: Fully distributed synchronization (Byungjae Kwak) –654r0, 663r0: Text for UWB PHY (Billy Verso, Igo Dotlic, etc.) –646r1: Frame structure (Byungjae Kwak) –635r1: PHY merged proposed Text (Marco Hernandez,Kapseok Chang,) –636r0: Motions on TBD items (Shannon Park) –677r0: PAC Security Consideration (Robert Moskowitz) –678r0: Adaptive Random Access for PAC (Byungjae Kwak) –689r0: Motion Document (Marco Hernandez) Letter Ballot: May 2015 Clint Chaplin, Samsung ElectronicsSlide 8
doc.: IEEE /1546r0 Submission November 2014 Clint Chaplin, Samsung ElectronicsSlide Key Management Protocol Draft ready for WG letter ballot; ballot issued soon Clint Chaplin, Samsung ElectronicsSlide 9
doc.: IEEE /1546r0 Submission November 2014 Clint Chaplin, Samsung ElectronicsSlide Layer 2/Mesh Under Routing (L2R) Recapped Sept Interim and Current Status Presented TG10 Status Summary at Joint 802.1/ Merging of Proposals Continued Baseline Proposal Adopted Reviewed TG10 Timeline and Next Steps Hoping for letter ballot after January 2015 meeting Clint Chaplin, Samsung ElectronicsSlide 10
doc.: IEEE /1546r0 Submission November 2014 Clint Chaplin, Samsung ElectronicsSlide a Optical Camera Communication SG PAR and CSD up for approval by EC this week Addressed comments on PAR and CSD Updated PAR and CSD based on resolution of comments Submitted revised PAR and CSD to EC for approval Clint Chaplin, Samsung ElectronicsSlide 11
doc.: IEEE /1546r0 Submission November 2014 Clint Chaplin, Samsung ElectronicsSlide 12 6TiSCH IG Reviewed 6TiSCH aspects of IEEE revision ( ): TSCH, TSCH default timing values, Enh-Ack, CCA, and CSMA-CA Clint Chaplin, Samsung ElectronicsSlide 12
doc.: IEEE /1546r0 Submission November 2014 Clint Chaplin, Samsung ElectronicsSlide 13 Dependable IG Review and Revision on Call for Interest 1.Reviewing Call for Interest at 1 st stage by Ryuji Kohno doc Reviewing Time Line and Project Plan by Jussi Haapola doc Reviewing Application and Dependability Matrix of TG8 by Ryuji Kohno 4.Revision of Call for Interest at 1st stage by Robert Heile and Ben Rolfe doc Revision of Time Line and Project Plan by Jussi Haapola doc Discussion on PAR and CSD Necessary Process and Possible Timeline to SG and higher steps 1.Call for Interest(CFI): RELEASE DATE: November 4, 2014, CLOSE DATE: March 13, 2015 (802 Plenary Session in Berlin, Germany) 2.Inviting potential persons in any related fields to present their interest with prospective applications at the IEEE 802 meeting in Atlanta, GA (January ) or at Berlin, Germany (March 8-13, 2015). 3.Time Line; SG application in May or July 2015 with PAR and CSD. Clint Chaplin, Samsung ElectronicsSlide 13
doc.: IEEE /1546r0 Submission November 2014 Clint Chaplin, Samsung ElectronicsSlide 14 THz IG Response to ITU-R liaison –Discussion on the response to the Liaison statement from ITU-R (Doc ) requesting comments on the ITU-R preliminary draft new report on "Technology trends of active services in the band above 275 GHz" (Doc ). –An answer has been finalized (Doc ). Clint Chaplin, Samsung ElectronicsSlide 14
doc.: IEEE /1546r0 Submission November 2014 Clint Chaplin, Samsung ElectronicsSlide 15 WNG SC measurement project by R Marks Should take over this project? Resolve by March 2015 Proposal for railroad communication by J Kim –In , ETRI proposed to standardize a high speed (1 Gb/s) rail communications –Mobile Wireless Backhaul for Fast Moving Cells ( wng0) by Junhyeong Kim How do you propose to resolve the problem of narrow beam width, high gain antennae with a moving train? Shadowing is not a critical problem, only need a fixed beam to the train which will be translated to individual callers placement of base station every several hundred meters? shouldn’t need so many have you looked into a mechanism of using distributed medium like a lossy coax? Yes, similar to propagation in tunnels, some issues and some advantages –Straw poll for interest resulted in 14 individuals (60 present), with 7 wishing to participate in an Interest Group on High Speed Rail Communication, i.e. IG HSRC. Junhyeong Kim volunteered to lead this IG HSRC. Proposal to Create a New Task Group (15.3e) by A Estrada Description of the need for a very high data rate, very low range MAC standard as described in Working towards a study group Clint Chaplin, Samsung ElectronicsSlide 15
doc.: IEEE /1546r0 Submission November 2014 Clint Chaplin, Samsung ElectronicsSlide 16 Maintenance SC First Recirculation WG Ballot LB97 on draft 2.0 closed November 4, Results 69/13/ % Received 223 comments; 39 left to be resolved. Set up BRC to finish addressing comments and send updated draft out for recirculation Clint Chaplin, Samsung ElectronicsSlide 16
doc.: IEEE /1546r0 Submission November 2014 Clint Chaplin, Samsung ElectronicsSlide 17 References This document All Documents – Current draft is in the members-only area – Members_Only_Area – members log in using username and password