PROCEDURE FOR:: REAL TIME CONGESTION MANAGEMENT. ASSESSMENT OF TTC TTC/ATC assessment is carried out after construction & solution of a base case power.

Slides:



Advertisements
Similar presentations
Sharing of ISTS Charges & Losses Regulation
Advertisements

ENQUIRY BY SRLDC TO VERIFY THE DETAILS OF DC & AG BY NTPC AND NLC STATIONS PETITION NO:- 67/2003 (suo motto) & PETITION NO:- 90/2005 (TNEB) CERC HEARING.
FREQUENCY SPECTRUM FROM AUGUST 06 TO OCT 06 (UPTO 20 TH OCT 06) < 49.0 HZ< 49.5 HZ< 50.0 HZ HZ>50.2HZ>50.5 HZ Aug
OPEN ACCESS IN INTER-STATE TRANSMISSION. DEFINITION OF “ OPEN ACCESS ” IN THE ELECTRICITY ACT, 2003 “The non-discriminatory provision for the use of transmission.
ERPC, Kolkata.  Definition and Concepts  Standards and regulation for TTC calculation  Calculation of TTC  Challenges in calculation of TTC  Way.
Maharashtra State Load Despatch Centre Role of SLDC in RRF Implementation & Issues By MSLDC.
Congestion When transmission demand >capability When Voltage levels in a corridor beyond operable limits When Real time line flow exceeds the TTC Most.
Development Of A Common Platform For Electricity Trading CERC Public Hearing Presentation By POWERGRID 19-December-2006.
9/22/00 1 Jerry W. Smith. 9/22/00 2 Jerry W. Smith.
RRF Mechanism ENERGY ACCOUNTING Western Regional Power Committee
Settlement system of Bilateral transactions under Open Access
Determine Facility Ratings, SOLs and Transfer Capabilities Paul Johnson Chair of the Determine Facility Ratings Standard Drafting Team An Overview of the.
POWER GRID CORPORATION OF INDIA LTD SOUTHERN REGIONAL LOAD DESPATCH CENTRE in 3rd SRPC MEETING 19 th February 2007 Bangalore GRID EVENTS AND ISSUES.
Module on Computation of PoC Transmission Charges
IEGC PROVOSIONS FOR RENEWABLE GENERATION SCHEDULING & UI SETTLEMENT 1.
INDIAN POWER SECTOR. Presentation Contents: Power Sector Structure in India Transmission Planning Criteria RLDC ’ s Management System Restoration Procedures.
Billing, Collection and Disbursement Procedures
REVISION OF SCHEDULES/REQUISITIONS A)OUTAGE OF GENERATING UNIT B) REVISED DECLARATION OF AVAILABILITY BY CGS C) OUTAGE OF A TRANSMISSION ELEMENT D)UNFORESEEN.
Indian Electricity Grid Code – 2010
1 TTC/ATC Computations and Ancillary Services in the Indian context.
Effect of generation loss and Frequency Response Characteristics (FRC) on tie-line flow to Southern Region under various scenarios and Target setting for.
OSC Meeting April 27, Transmission Cost Allocation Overview.
With amendments w.e.f  (1) In these regulations, unless the context otherwise requires,-  (a) ‘Act’ means the Electricity Act, 2003 (36.
Section 7.5 –4 – ii of Indian Electricity Grid code (IEGC): “The summation of station-wise ex-power plant drawal schedules for all ISGS after deducting.
ISO Outlook Summer 2005 and Beyond Senate Energy, Utilities and Communications Committee February 22, 2005 Jim Detmers Vice President of Grid Operations.
SIMPLE TRANSMISSION OUTAGE. Nodal Protocol Definition 2.26 Simple Transmission Outage A Planned Outage or Maintenance Outage of any Transmission Element.
AFC METHODOLOGY EMS USER GROUP SEP 12, 2004 AFC – New Developments EMS USER GROUP Sep
14 TH Commercial sub-committee meeting UI &REC Audit Talcher II scheduling SEM DATATransmission pricing AMR Others.
14 TH Commercial sub-committee meeting UI &REC Audit Talcher II scheduling SEM DATATransmission pricing AMR Others.
Commercial Points for 93 rd OCC meeting. Change in Bank a/c New Account for Deviation Settlement opened in Axis Bank Name of the A/C : Power System Operation.
Open Access for Renewables New initiatives. Scheduling and OA of RE Open Access through LTA/ MTOA/ STOA route envisaged Applicable to Wind and Solar without.
Sharing of Inter-State Transmission Losses 11/29/
Queries raised by Director (Tariff) on ARR and Tariff Application of OPTCL for FY on
SCHEDULING METHODOLOGY The station-wise (Ex-bus) capability would be submitted by the ISGSs in the specified format. ISGSs would declare the capability.
ABT / IEGC CLAUSES While making or revising their declaration of capability, the generator shall ensure that their declared capability during peak hours.
1 Technical and Commercial Aspects K.RAMAKRISHNA DGM, SRLDC DGM, SRLDC.
Regulatory Framework in Indian Power Sector Module C5 V K Agrawal ED, NLDC POSOCO.
Congestion regulations. Definitions and Interpretation “Available Transfer Capability (ATC)” means the transfer capability of the inter- control area.
OPEN ACCESS IN INTER STATE TRANSMISSION. Gazette Notification of Open Access in inter state transmission systemGazette Notification of Open Access in.
1 INTRA – STATE AVAILABILITY BASED TARIFF (ABT) A Presentation on INTRA – STATE AVAILABILITY BASED TARIFF (ABT)
Renewable Regulatory Fund (RRF):- Implementation Mechanism
CONFIRMATION OF MINUTES (AMENDED PARA) Director (Transmission ), KPTCL stated that on account of DC current entering the neutrals of various transformers.
Current Operational Challenges Computing the West – North Limits Potential IROLs Local Voltage & Thermal issue (OOME) High Voltage Outages.
Western Area Power Administration Transmission Customer Meeting October 17, 2007.
PRESENT CONDITIONS. FREQUENCY DURATION CURVE , , &
Issues related to UI pool. Payment to pool account by KPTCL and Pondy Till June 2010 payment to UI pool by KPTCL and Pondy was through cheque/DD. Pondy.
Extract from Annexure-1 on ‘Complementary Commercial Mechanisms of Indian Electricity Grid Code ’12(a) Weekly bills shall be issued to the constituents.
OPSTF – Issue 7 Long-term unavailability of autotransformers.
Open Access In Interstate Transmission system Principal Regulation 2008( 25 th Jan’2008) Amendment Regulation 2009(20 th May’2009) Order-Removal of difficulties,(28.
NORTHERN REGIONAL LOAD DISPATCH CENTER 1.Revision Of Ceiling Of UI Rates and slope. 2.Revision Of Schedule after a Transmission Constraint is over. 4.RLDC’s.
SOUTHERN REGIONAL GRID ▀ Centre Generating Stations in the Region are Ramagundam Super Thermal Power Stn. : 2,600 MW (200x x4) Neyveli Lignite Corporation.
Settlement system for Collective Transactions (Power Exchange)
Issue of Declared Capacity (DC), and Actual Generation (AG) by Generating Stations Hon’ble Commission has issued Interim order dated 19/ directing.
Demarcation of responsibilities (as per IEGC) 1. REGIONAL GRID SHALL BE OPERATED AS LOOSE POWER POOLS WITH STATES HAVING FULL OPERATIONAL AUTONOMY. 2.SYSTEM.
Southern Regional Power Committee Central Electricity Authority.
Current Nodal OS Design 1.The NMMS database will have an OWNER and an OPERATOR designation for each piece of equipment in the model. The OWNER and OPERATOR.
Sharing of Inter-State Transmission Charges and Losses Abbhimanyu Gartia, Dy General Manager, WRLDC, MUMBAI.
SEMINAR PRESENATATION ON WIDEAREA BLACKOUT (AN ELECTRICAL DISASTER) BY:Madhusmita Mohanty Electrical Engineering 7TH Semester Regd No
Reliability Standards Committee 2009 Scope and Plan Judith James Manager, Reliability Standards.
OPEN ACCESS IN INTER STATE TRANSMISSION 29 TH MARCH TH MARCH 2004.
Open Access.
Open Access.
Scheduling of Collective Transactions Through Power Exchange
Congestion regulations
Project WECC-0100 Update Load Modeling Task Force
DEC System Voltage Planning - June 2018
GRID STATUS – PRE - ABT Very wide Frequency fluctuations
Project WECC-0100 Update Load Modeling Task Force
Presentation transcript:

PROCEDURE FOR:: REAL TIME CONGESTION MANAGEMENT

ASSESSMENT OF TTC TTC/ATC assessment is carried out after construction & solution of a base case power system model for a representative scenario EHV system modelled upto 220KV level(except NER modelled upto 132KV) Normally all units > 50MW with switching at 132KV level & above would be modelled Loads would be lumped at 220 / 132KV Actual data or data as per CEA transmission planning criterion

ASSESSMENT OF TTC Separate base case for export & import & TTC calculations for both peak/off-peak Network topology :: data from CTU / STU Unit availability:: LGBR Actual Generation:: As per past trends/anticipation Actual Demand:: As per data furnished/LGBR/past trends MVAR Demand:: CEA manual on transmission criterion planning or data furnished

Normal operating limts for Line:: CEA manual on transmission criterion planning Emergency operating limit of line:: 110% of Normal ICT loading:: 90% of MCR In case of non availability of data/additional data requirement - reasonable assumptions to be made TTC between two areas calculated by increasing generation in exporting area and load in importing area till constraints are hit for a credible contingency ASSESSMENT OF TTC

Credible contingency:: -Outage of a single transmission element -Outage of the largest unit in a generating station & transmission element All base case loadings are within normal operating limits After credible contingency all line loadings are within emergency operating limits and voltage as per IEGC defined range ASSESSMENT OF TTC

TTC would be limited by : -violation of voltages -violation of line operating limits in base case -violation of emergency limits in contingency ASSESSMENT OF TTC

TRM kept to ensure that the system is reliable under a reasonable range of uncertainities Computation of TRM:: - 2% of anticipated peak demand(MW) -power number in MW for the IEGC frequency range (with load damping of 4 % with/without FGMO) - size of the largest generating unit - size of largest anticipated infeed ATC = TTC – TRM ATC is the transfer capability commercially available for scheduling ASSESSMENT OF TRM/ATC

SLDCs shall assess the TTC/ATC for intra-regional corridors & exchange of power with ISTS RLDCs shall determine TTC/ATC at regional level after receipt of above & other data for TTC computation from SLDCs. RLDCs would determine TTC/ATC for inter-regional corridors & intra-regional corridors & between two or group control areas TTC/ATC assessment shall be three months in advance upto the fourth month All these data shall be forwarded to NLDC for computation/verification of intra-regional/inter-regional TTC/ATC PROCEDURE FOR ATC/TTC/RM DECLARATION

ISGS-I ISGS-II STATE-ASTATE-B ISTS NETWORK

All TTC/ATC declarations to be put on RLDC/NLDC website & also communicated as per Format-I Revision of TTC/ATC may be done by NLDC based on: - inputs received from SLDCs/RLDCs - change in network topology - change in anticipated Load/generation - based on own observation PROCEDURE FOR ATC/TTC/RM DECLARATION

SLDCs/RLDCs/NLDC would display the actual real time power flow Vis-a-Vis the TTC declared as per Format-II & voltages upstream/downstream Reasons for Consideration of congestion:: - Grid voltage downstream/upstream beyond operating range -real time power flow exceeds the ATC for one time block for the congested corridor -loading of transmission lines beyond operating limit PROCEDURE FOR REAL TIME CONGESTION DECLARATION

In case actual flow in inter/intra regional corridor exceeds ATC continuously for two time blocks NLDC would issue a warning notice SLDCs on noticing congestion can inform RLDC who in turn will inform NLDC If power flow is as per schedule but congestion is due to a forced outage :: OA transaction shall be revised first followed by TTC revision If power flow is as per schedule and there is congestion in terms of voltages/line loadings without any forced outages, TTC shall be revised In case of continued persistance of congestion and no action from defaulting constituents notice of application of congestion charges would be issued PROCEDURE FOR REAL TIME CONGESTION DECLARATION

Applicable simultaenously on all entities upstream / downstream Payable by entities causing congestion and receivable by entities relieving congestion Congestion charges may be applied pan india being applicable for entities in one region causing intra-regional congestion in a separate region Shall be applicable only after two time blocks of issue of the notice Once applied will remain in force for 8 time blocks(2 hours) Congestion charges would not be applied for more than four times in a day to prevent continued flip-flops APPLICABILITY OF CONGESTION CHARGE

Congestion charges levied for the fourth time would remain in force for the rest of the day. If the congestion charges continues into next day the same shall be considered as 1 st time for the day. Shall be lifted only after the 2 hour period and when power flow falls below ATC and remains below ATC level for at least one time block At frequency below 50 Hz, congestion charge would be levied for overdrawal in the importing control area and at frequencies above 50Hz, congestion charge would be levied for under-drawal in the exporting control area. APPLICABILITY OF CONGESTION CHARGE

NERER NR SR WR U/D-A O/D-B U/D-C O/D-D U/D-X O/D-Y SF > 50.00Hz A,C CAUSING CONGESTION SF < 50.00Hz Y CAUSING CONGESTION CONGESTED LINKS ER-NR & WR-ER

Congestion charge present rate:: 545 p/Kwh At the end of the operating day RLDC/NLDC would indicate all time blocks where congestion charges applicable Computation using SEM data and Frequency Congestion charge account to be settled on weekly basis and maintained/operated by RLDCs Statement of congestion charge disbursal to be issued by RPCs on weekly basis Constituents required to pay into congestion charge account within 10 days of issue of accounts Delay beyond 12 days will attract 0.04% S.I per day RLDC to release disburse towards payments within 3 days of receipt. CONGESTION CHARGE-ACCOUNTING & SETTLEMENT

Undisbursed amount if any would be utilized as per instruction of CERC RLDC to furnish data regarding undisbursed amount to the commission on a six monthly basis CONGESTION CHARGE-ACCOUNTING & SETTLEMENT