JAMES THOMSON C. ENG JACKED STRUCTURES SA WWW.JACKEDSTRUCTURES.COM JACKED STRUCTURES SA A New Approach to Constructing Underground Stations.

Slides:



Advertisements
Similar presentations
ODOT Structure Project Manager Training
Advertisements

Cofferdam.
Chapter-2 Parts of Steel Bridge.
BRIDGE CONSTRUCTION INSPECTOR Practice Questions Next.
Indianapolis Airport Interchange Bridges Presented to: TRB Bridge Aesthetics Subcommittee January 11, 2005.
>ENTER< [PLS PUT ON SAFETY HELMETS BEFORE ENTERING THIS SITE.]
St Croix River Crossing S.P Contractor Information Meeting 15 May 2013 River Spans.
A3 - dual carriageway link between London and Portsmouth 6.5km new road, 1.77km in bored tunnel £371 million Construction started January 2007 Project.
MDOT ACTT Workshop Structures I-94 From I-96 to East of Connor Participants Steve Stroh, URS Corp Vijay Chandra, Parson Brinckerhoff Raj Ailaney, FHWA.
TEQIP-II Institutions
Bridge over BNSF Railroad 7 km East of Windham - East Bridge Replacement Project Using Accelerated Bridge Construction.
California High-Speed Train Project Los Angeles Union Station Alternatives Analysis January 7, 2010 Board Presentation.
ENG-1010 Lecture 16 Bridge Design.
Welcomes to presentation on Segmental Construction by Crib & Crane and Crib & Goliath Gantry at National Seminar on Design & Construction of Bridges Welcomes.
GROUNDWATER CONTROL.
Chapter 34 Bridge Construction.
Reconstruction of the Eads Bridge Highway Deck
Partial Underground Analysis– TRTP Project Project Segment 8A Corridor October 29, 2011.
Innovating in a compact environment
Basic Civil Engineering-Foundation
FOOTINGS.
SOIL, GEOTECHNICAL ENGINEERING AND FOUNDATION ENGINEERING
TOPIC 2: TYPES OF FOUNDATION
Foundation Engineering CE 483
Homebush Bay Rail Link l 700 lineal metres of precast concrete arch l 9 different profiles.8 x 2.5 to 19 x 8 l 900 units. l Reinforced soil with precast.
Mata kuliah: S0892 – Ground Improvement Method Tahun: 2010 Case Study Session
TWIN SAILS OPEN LIFT BRIDGE. Introduction Types of Bridges Open Lift Bridge Architecture of TWIN SAILS OPEN LIFT BRIDGE Details of TWIN SAILS Specialities.
Bridge Engineering (5) Substructure – Abutments and Piers
BOX JACKING. EXPLANATION It is the process in which a pre-cast R.C.C box or a rigid box is pushed into the soil with the help of hydraulic jacks It is.
Underground Stations Typical Station Site Plan. Underground Stations Ground Conditions: Key Issues.
CAISSON FOUNDATION.
St. Croix River Crossing S.P Contractor Informational Meeting May 15, 2013 Contact: Paul Kivisto, P.E. St. Croix Crossing Bridge Construction.
PROJECT REPORT DESIGN CONCEPTS OF BOW STRING GIRDER (40 M SPAN) OF ROAD OVERBRIDGE AND DESIGN OF SUB STRUCTURE FOR THE SAME.
SOIL MECHANICS-1 DEEP FOUNDATIONS PRESENTATION TOPIC MEMBERS O8-CE-29
Progress Photos March Construction Progress Park Station Portal Shaft Excavation 16 March 2007 View towards South 16 March 2007 General views of.
City of Winnipeg SOUTHWESTERN RAPID TRANSIT CORRIDOR Bidder Meeting October 16 th, 2009.
Foundation Loads Dead Load Live Load Wind Load
Engineers and bridges. Just the facts The four main factors are used in describing a bridge. By combining these terms one may give a general description.
BUILDING CONSTRUCTION
. Client: City of Pittsburgh, Brighton Heights Community Objectives : Develop a pedestrian/bicycle bridge reconnecting Brighton Heights to Riverview park.
Typical Bridge Components
CAISSON FOUNDATION.
SOIL MECHANICS AND FOUNDATION ENGINEERING-III (CE 434)
Upper Middle Road Grade Separation Construction Project Status Update February 2009.
DIAPHRAGM WALLS.
S.T.B.S. College of Diploma Engineering
BRIDGES CAD 449. Design It is the essence of engineering! “… the process of devising a system, component or process to meet desired needs. It is a decision-making.
8 th Grade Applied Technology Mr. Giannone. In this unit we will study structures and the forces that affect them.
The Challenge of Urban Rail Infrastructure The Design of William Street Underground Station Barry Moore 23 rd November 2005 AusRAIL PLUS 2005.
..... Deep Foundations Institute Project Nominee San Francisco-Oakland Bay Bridge New East Span.
Offsite manufactured Bridges
Sardar Patel Institute Of Technology
High Bridge Re-Deck Project
INTRODUCTION TO TRENCHLESS TECHNOLOGY
BOX JACKING.
Interaction between Riprap Layout and Contraction Scour from Vertical-Wall Bridge Abutments Supported by Shallow Foundations presented by Huang, C., Xie,
INTEGRAL BRIDGES Guided by: Dipu.V.S Lecturer Civil Engg Dept
By T.G.N.C.VAMSI KRISHNA. 171FB M.tech – Civil.
Arch205 Materials and building construction 1 foundation
Safety Tip FQ18086 RHODE ISLAND AVENUE METRO STATION TRACK DECK AND PRE-CAST PANEL REHABILITATION Please use full fall Protection gear when using 6’ or.
Arch205 building construction foundation
Offsite Applications for Rail Overbuild Part 1
RAILWAYS, BRIDGES & TUNNELS
American Concrete Pipe Association Short Course School 2014
THE UPGRADE OF 33.7 KM OF NATIONAL ROUTE N2, BETWEEN MTUNZINI TOLL PLAZA (SECTION 28, KM 42.7) AND EMPANGENI T-JUNCTION (SECTION 29, KM 13.0) CONTRACT.
An Introduction to Subway Construction Technology
Engineering Technology Program
LIFT,ESCALATOR AND MOVING WALKS
Large Air Systems – Sales Training
BUILDING CONSTRUCTION Foundation
Presentation transcript:

JAMES THOMSON C. ENG JACKED STRUCTURES SA JACKED STRUCTURES SA A New Approach to Constructing Underground Stations

Jacked Installations for Large Structures JACKED STRUCTURES SA Some Early Projects Modular installation of foundations, abutments and piers Box Jacking

Modular Concept JACKED STRUCTURES SA

Wandsworth JACKED STRUCTURES SA

The Box Jacking Concept JACKED STRUCTURES SA

Brent Cross JACKED STRUCTURES SA

THE JACKED ARCH THE JACKED DECK JACKED STRUCTURES SA New Concepts

The Jacked Arch Concept JACKED STRUCTURES SA

The Jacked Deck Concept JACKED STRUCTURES SA

A 20M WIDE 126M LONG ROAD UNDERPASS BELOW RAIL TRACKS CLIENT: EAST KENT CC CONTRACTOR: VOLKER FITZPATRICK HOCHTIEF JV JACKED STRUCTURES SA Cliffsend Underpass

JACKED STRUCTURES SA Tender Scheme aa Volker Fitzpatrick Hochtief JV

Cliffsend Underpass JACKED STRUCTURES SA Final Scheme Volker Fitzpatrick Hochtief JV

Cliffsend Road Underpass –Aerial View JACKED STRUCTURES SA

Cliffsend Road Underpass Jacked Deck Face Excvation JACKED STRUCTURES SA

Cliffsend Road Underpass Deck Jacking Installation JACKED STRUCTURES SA

INSTALLATION BY JACKED ARCH AND JACKED DECK METHODS JACKED STRUCTURES SA Underground Metro Stations

JACKED STRUCTURES SA Metro Stations- Arch Configurations Top Box with PilesModular foundations and Walls

Metro Stations Arch Configurations JACKED STRUCTURES SA Foundation BoxFoundation Tunnel

Four Platform Arrangement JACKED STRUCTURES SA

Alternative Four Platform Arrangement JACKED STRUCTURES SA

Jacked Deck Concepts JACKED STRUCTURES SA

An underground station – piled abutments from a high level box and a jacked arch JACKED STRUCTURES SA

TYPICALLY: 22M -24 M SPAN AROUND 200M LONG DEPTH VARYING FROM 6M-10M JACKED STRUCTURES SA Application of Jacked Deck to Launch Boxes

By breaking down the process into elements reduces the exposed soil face Minimises jacking forces and reaction arrangements. Continuous support of the excavation with a full structural lining Surface settlement is minimal Use of precast units allows higher quality construction JACKED STRUCTURES SA Advantages of the Jacked Arch and Deck Approach

A wide range of geometry and configurations Installation to very close line and level tolerances Methods are applicable to both shallow and deep structures Provides greater clear spans over much longer drive lengths. Small launch platform area JACKED STRUCTURES SA Advantages of the Jacked Arch and Deck Approach

JACKED STRUCTURES SA