Title slide PIPELINE QRA SEMINAR. PIPELINE RISK ASSESSMENT INTRODUCTION TO HAZID 2.

Slides:



Advertisements
Similar presentations
Medical devices: Application of risk management to medical devices
Advertisements

[Organisation’s Title] Environmental Management System
OSHA’s Voluntary Protection Program (VPP) Job Hazard Analysis Mishap reporting 1 This class is only intended to familiarize you with the programs in place.
International Energy Agency Hydrogen Implementing Agreement Proposed Task on Hydrogen Safety.
TMS-RA04-A-01-02Page 1 of 20 The Risk Assessment Process.
Donegani Anticorrosione S.r.l
Pipeline Qra Seminar Title slide Title slide.
Overview of Key Rule Features
Risk assessment of science experiments in Primary Schools Phillip Crisp and Eva Crisp.
Projmgmt-1/33 DePaul University Project Management I - Risk Management Instructor: David A. Lash.
Title slide PIPELINE QRA SEMINAR. PIPELINE RISK ASSESSMENT INTRODUCTION TO RISK IDENTIFICATION 2.
Title slide PIPELINE QRA SEMINAR. PIPELINE RISK ASSESSMENT INTRODUCTION TO GENERAL RISK MANAGEMENT 2.
Managing Risk to Reduce Construction Claims (And Improve Project Success) Presented by Laurie Dennis, PE, CVS-Life, FSAVE.
Annex I: Methods & Tools prepared by some members of the ICH Q9 EWG for example only; not an official policy/guidance July 2006, slide 1 ICH Q9 QUALITY.
Runway Safety Teams (RSTs) Description and Processes Session 5 Presentation 1.
Definition Hazard - Anything, any source or any situation with the potential to cause bodily injury or ill-health Risk – the likelihood that a hazard.
Presentation on Integrating Management Systems
RST processes Session 6 Presentation 3. A framework for RST processes Establishing an RST Membership Terms of reference Work programme (schedule, agenda,
Risk Assessment – An Essential Standard
Pipeline Qra Seminar Title slide Title slide.
What is Business Analysis Planning & Monitoring?
Qantas Brand Refresh Kristy Dixon – Masters of Applied Project Management University of Adelaide 2013 Results of Risk Analysis Plan Hypothetical Project.
Ship Recycling Facility Management System IMO Guideline A.962
Process Safety Management
Occupational Health and Safety
Basics of OHSAS Occupational Health & Safety Management System
IAEA International Atomic Energy Agency Reviewing Management System and the Interface with Nuclear Security (IRRS Modules 4 and 12) BASIC IRRS TRAINING.
October Training 8 HR Ref. Content Overhead Utilities Risk Assessments Task Safety Environmental Analysis Health and Safety Plan Components of a HASP Questions?
Risk Assessment and Management. Objective To enable an organisation mission accomplishment, by better securing the IT systems that store, process, or.
BSBPMG405A Apply Human Resource Management Approaches Apply Human Resource Management Approaches Unit Guide C ertificate IV in Project Management
Organization and Implementation of a National Regulatory Program for the Control of Radiation Sources Inspection Part II.
Hazards Identification and Risk Assessment
Developing and Understanding Our Future Workforce MODULE 3 RISK MANAGEMENT TST Consulting and Training.
Two of the most important pieces of the health and safety legislation affecting educational establishments across the UK are the Health and Safety at.
SMS Planning.  Safety management addresses all of the operational activities of the entire organization.  The four (4) components of an SMS are: 1)
Responsible Care® Health & Safety Task Force – 06 H&S.
Unit 3: Identifying and Safeguarding Vital Records Unit Introduction and Overview Unit objective:  Describe the elements of an effective vital records.
A Framework for Your Pipeline Integrity Program. 2 A Few Thoughts Before Beginning l This rule is new to the pipeline industry although many of the concepts.
Project Risk Management Planning Stage
Technology Needs Assessments under GEF Enabling Activities “Top Ups” UNFCCC/UNDP Expert Meeting on Methodologies for Technology Needs Assessments
PROTECTIVE ACTIONS AND REENTRY. Protective Actions Promptly and effectively implemented or recommended for implementation to minimize the consequences.
Discuss the analytical skills, including systems thinking, needed for a systems analyst to be successful Describe the technical skills required of a systems.
Community Wildfire Protection Planning: HFRA and Beyond.
MINE SAFETY MANAGEMENT PLAN. DIRECTORATE GENERAL OF MINES SAFETY DGMS n It is recommended that mines be required to put in place Mine Safety Management.
BSBPMG407A Apply Risk Management Techniques Apply Risk Management Techniques Unit Guide C ertificate IV in Project Management Qualification Code.
BSBPMG508A Manage Project Risk Manage Project Risk Unit Guide Diploma of Project Management Qualification Code BSB51507 Unit Code BSBPMG508A.
Company LOGO. Company LOGO PE, PMP, PgMP, PME, MCT, PRINCE2 Practitioner.
OHS RISK ASSESSMENT PROCEDURE Title: OHS Risk Assessment Procedure Document Unique Identifier: (Revision 2) Effective date: July 2014.
Risk Assessment Meeting Introduction Slides --- Your Hospital’s Name --- Hospital at Night Patient Safety Risk Assessment:
Business Continuity Planning 101
Risk Assessment: A Practical Guide to Assessing Operational Risk
HSE Procedure for Risk Assessment Document Number: KOC.SA.018
Pipeline Safety Management Systems
Application Outsourcing: Achieving Success & Avoiding Risk
Ranjan kumar Assistant Manager CCL,Ranchi
Monitoring and Evaluation Systems for NARS organizations in Papua New Guinea Day 4. Session 12. Risk Management.
Ensuring a safe workplace
HAZOP Study for Kiln Start-up Process of a Cement Production Plant
HSE Case: Risk Based Approach.
OHS Staff Introduction Training
RST processes Session 5 Presentation 2.
Conduction of a simulation considering cascading effects
Project HAZID & Risk Assessment Workshop Process.
Elements of an Effective Safety and Health Program
Elements of an Effective Safety and Health Program
CR-GR-HSE-302 Management of change
Management of Change GROUP HSE RULE (CR-GR-HSE-302)
Contingency Planning for Accidental Surface Water Pollution​ GROUP HSE RULE (CR-GR-HSE-705) EXECUTIVE SUMMARY This rule sets specific requirements to be.
Presentation transcript:

Title slide PIPELINE QRA SEMINAR

PIPELINE RISK ASSESSMENT INTRODUCTION TO HAZID 2

Description “HAZID is a structured, team based approach to identify hazards, their potential consequences, and requirements for risk reduction” INTRODUCTION TO HAZID Content slide 3

What is the purpose of HAZID? -For the defined system, identify relevant hazards and their causes and potential consequences -Document any existing safeguards (i.e. preventing the hazard and/or consequences from the hazard) -Assess the risk (i.e. assess the probability/frequency and consequences) associated with the identified hazards -Make recommendations and assign actions to eliminate, prevent, control or mitigate the identified hazards INTRODUCTION TO HAZID Content slide 4

Difference between risk and hazard? Risk could be described as the exposure to a hazard Hazard – any event/object that could cause harm Hazard – a crocodile / Risk – exposed to a crocodile More academic importance 5 INTRODUCTION TO HAZID

Team-based workshop -HAZID chairman -HAZID scribe -Participants Different responsibilities within the HAZID team Composition and size of the team depending on the situation (e.g. complexity) Preferable smaller group (i.e. less than 10) 6 INTRODUCTION TO HAZID

Participants appropriate knowledge and experience (i.e. experts for the different parts of the system) Participants appropriate knowledge and experience (e.g. operational personnel) -Maintenance -Safety -Process Stakeholders (e.g. contractor, consultant, client and authorities) 7 INTRODUCTION TO HAZID

Structured – use of guidewords (established before the workshop) Specific guidewords for the situation and system (combination of guidelines, company specific and experience) Purpose of assisting in the identification or hazards 8 INTRODUCTION TO HAZID

EXAMPLE OF HAZID Content slide 9

EXAMPLE OF HAZID Content slide 10

EXAMPLE OF HAZID Content slide 11

EXAMPLE OF HAZID 12

Difficulties in determine what is actually the hazard, the cause and the consequence -The hazard (i.e. leak of hydrocarbon from a pipeline system) -The cause of an event (i.e. corrosion which causes a leakage from the pipeline) -The resulting consequence of an event (i.e. fire after ignition of the leakage from the pipeline) -The hazard (i.e. corrosion which causes a leakage from the pipeline) -The cause of an event (i.e. damaged corrosion protection on the pipeline) -The resulting consequence of an event (i.e. leak of hydrocarbon from a pipeline system) Confusion (i.e. incorrect use – academic importance) Consistency – use the same approach throughout the HAZID! 13 INTRODUCTION TO HAZID

EXAMPLE OF HAZID Content slide 14

EXAMPLE OF HAZID Content slide 15

EXAMPLE OF HAZID Content slide 16

EXAMPLE OF HAZID Content slide 17

What is the purpose of HAZID? -For the defined system, identify relevant hazards and their causes and potential consequences -Document any existing safeguards (i.e. preventing the hazard and/or consequences from the hazard) -Assess the risk (i.e. assess the probability/frequency and consequences) associated with the identified hazards -Make recommendations and assign actions to eliminate, prevent, control or mitigate the identified hazards INTRODUCTION TO HAZID Content slide 18

Sometimes a HAZID only include the risk identification (i.e. where hazards and their causes and consequences are identified) Most of them time a HAZID also include a qualitative risk assessment (i.e. where the probability/frequency and consequences for the identified hazards are assessed) Assessment carried out with the support from a risk matrix 19 INTRODUCTION TO HAZID Content slide

EXAMPLE OF HAZID Content slide 20

EXAMPLE OF HAZID Content slide 21

EXAMPLE OF HAZID Content slide 22

A number of actions to eliminate, prevent, control or mitigate the hazards are assigned at the workshop -Additional information -Inspections -Detailed studies -Detailed calculations -Changes in the design Based on the close-out of these actions (and possible implementation) an updated risk assessment (residual risk) Carried out weeks or months after the workshop 23 INTRODUCTION TO HAZID

EXAMPLE OF HAZID Content slide 24

25 EXAMPLE OF HAZID

The hazards are recorded in the HAZID sheet The actions are recorded in action sheets The workshop is presented in the HAZID report -Presentation of the HAZID sheet (i.e. the information established at the workshop) -Presentation of the action sheets -Information on the workshop (e.g. participants, guidewords and methodology) Updated based on the close-out of actions and updated risk assessment (residual risk) 26 INTRODUCTION TO HAZID

Advantages of HAZID Flexibility (e.g. concept – high-level hazards / detailed design – detailed hazards) Flexibility (e.g. could be used to analyse one concept or compare two different concepts) Thorough (i.e. systematic approach) Well documented (e.g. easy to keep track on information) INTRODUCTION TO HAZID 27

Disadvantages of HAZID Information (i.e. strongly depending on the information available) HAZID team (i.e. depending on the expertise and experience within the team) Close-out of actions (i.e. depending on the commitment from management) Effectiveness (i.e. only effective if the hazards identified are resolved and appropriate actions implemented) INTRODUCTION TO HAZID 28

Round-around the table (i.e. speak up your strongest concerns regarding possible hazards) before going into the guidewords Gathering experts for the different parts of the system often leads to discussion of things which might not actually be a hazard (more cross-disciplinary problems) – keep focus on the hazards! Spend some time defining the actual system (e.g. boundaries and project phase) INTRODUCTION TO HAZID Content slide 29

QUESTIONS? End slide 30