1 Fault Assistance Centre David Talbot & Chris Armstrong 24-25 September 2014.

Slides:



Advertisements
Similar presentations
Seminar on Circuit Breaker
Advertisements

Load Management System with Intermittent Power on the Grid Ruth Kemsley CEng MIMechE MIEE Econnect Ventures Ltd.
1 Webinar 31 July Webinar Cara Blockley Low Carbon Projects Manager.
1. Four LLs were published in February Transmission Relaying – Undesired Blocking 2.Lack of Separation for Critical Control Power Supply Leads.
1 Smart Grid Vision Electric Grid Modernization Steering Committee Grid Facing Technology Subcommittee January 14, 2013.
DISPUTES & INVESTIGATIONS ECONOMICS FINANCIAL ADVISORY MANAGEMENT CONSULTING Early Lessons Learned from DOE-EPRI Framework Experience Melissa Chan MA DPU.
 UK Power Networks. All rights reserved Distribution Network Visibility Low Carbon Networks Fund Tier 1 project UK Power Networks & PPA Energy Omer.
Managing Director, HVPD Ltd
Smart Urban Low Voltage Network Low Carbon Network Fund Tier 1 Project UK Power Networks & TE Connectivity.
1 Optimising grids Understanding capacity needs to make networks more efficient Mike Kay Networks Strategy and Technical Support Director 23 September.
Voltage Management of Low voltage (LV) Busbars Plenary session B – Low voltage operation Dan Randles Quality of Supply and Technical Manager/LCNF Tier.
1 CLASS webinar 26 March CLASS webinar 26 March 2015 Simon Brooke Electricity North West.
Grid Connections: Now and the Future Patrick Smart Head of Commercial and Regulatory 10 th November 2010.
1 Pacific Gas & Electric Company MTS: Evolution of the Electric Distribution System Manho Yeung, Senior Director, System Planning and Reliability PG&E.
1 Innovation Responding to the needs of customers Dan Randles Network Performance & Innovation Manager 3 October 2014.
An Introduction and Overview
Super Conducting Fault Current Limiters
© ABB Group June 10, 2015 | Slide 1 1MRS A self healing power system for the accurate fault location and zone concept T&D Smart Grids Europe 2012.
By Lauren Felton. The electric grid delivers electricity from points of generation to consumers, and the electricity delivery network functions via two.
1 Project Overview Steve Cox Head of Engineering.
1 Kevin Hoban Smart Street Project Manager. 2 Agenda Questions & answers Technical updateIntroduction and overview Trial design.
Chapter 7 SYSTEM PROTECTION
Scottsdale, AZ September 26, 2012 Western Underground Fall Conference Scottsdale, AZ September 26, 2012 Existing Primary Cable Fault Locating and Testing.
Why do wires get hot when a current passes through them?
1 Customer contact centre briefing 23 July 2015 Tracey Kennelly.
Getting ready for Advanced Metering Infrastructure Paper by : Rajesh Nimare Presented by : Prashant Sharma.
Area of Study 2: Electricity
1 Power Quality Mary Santori, P.E. Senior Engineer September 12, 2013.
Smart Grid Technologies Damon Dougherty – Industry Manager.
Section 3 TRANSMISSION & DISTRIBUTION US Bulk Power Transmission System Transmission & Distribution (T&D) Components New T& D Technologies This product.
Electrical Installation 2
ea technology Effective Condition Assessment of MV Switchgear
CONTENTS 1. Introduction 2. Smart Metering System 3. How does the system work? 4. Advantage of AMR system Electric company benefits.
Prepared By :.  Introduction  Techniques Used  Case Study  Advantages  Application  Conclusion OUTLINE.
Medium Voltage products Energy reliability & revenue improvement Speaker: Jean-Yves Pocthier - Schneider Electric France Technical solution for improvement.
1 Transitioning innovation projects to BaU Dr Geraldine Bryson Innovation Implementation Engineer.
Many BIDOYNG units installed ~ 250 Reclose operations after faults > 80% customer supplies restored successfully.
SWEDE 2014 Remote Monitoring of Faults – Frank Daniel (Oncor)
Frankfurt (Germany), 6-9 June 2011 Louise Jakobsen, Danish Energy Association – Denmark – Session 3 – Paper 0811 Louise Jakobsen, Danish Energy Association.
The 13 Amp PLUG Fuse Insulating Casing Live Wire Neutral Cable grip Flexible Copper conductors Earth.
On-line Condition Monitoring of Distribution Network Assets – Making the Network Smarter Neil Davies Neil Davies – UK – Session 1: Network Components –
Frankfurt (Germany), 6-9 June 2011 Round Table 2a Voltage Quality Monitoring, Dip Classification and Responsibility Sharing Kevin Niall, ESB Networks on.
Utility Engineers, PC.  Generation  Transmission  Distribution.
1 A Case Study of Extensive Automation in London Cliff Walton & Bob Jackson.
SERVICE ENTRANCE EQUIPMENT
Name Of The College & Dept
Electricity Notes 5 Electric Power – the rate at which _______________________ the rate at which _____________________ is converted into another form of.
Submitted To:- Submitted By:- Mr.
Connecting Low Carbon Generation Clive Goodman Primary System Design Engineer.
ECE 498HZ: Power Distribution System Analysis
Survey of Smart Grid concepts and demonstrations Smart substation Ari Nikander.
MCB Connor, Sunny, Kia. What does it do? A circuit breaker is an automatically operated electrical switch designed to protect an electrical circuit from.
Loop-Sectionalizing Automation Scheme Colin Hawthorne 4/26/2016.
Distribution Automation The utilization of IEDs (Intelligent Electronic Devices) and advanced communications to unlock the benefits of operational efficiency.
SYNERGY INSTITUTE OF ENGINEERING AND TECHNOLOGY
1 Electricity North West’s Demand Response demonstration Simon Brooke Low Carbon Projects Manager.
CURRENT ® Smart Grid Overview July SMART GRID = ENHANCED FUNCTIONALITY Smart Grid delivers more than advanced metering infrastructures: -safe.
Power Quality at Solar Distributed Generation Facilities
SUB-STATIONS.
Circuit Protection Unit 9.
the CERN Electrical network protection system
SMART GRID BASED FAULT IDENTIFICATION SYSTEM
THREE-PHASE GROUND-FAULT BASICS
Chapter 7 System Protection
Electrical Installation Practice 2
ELECTRICAL POWER-II Electrical engineering sixth semester
EET 323 – Electrical System Design Lecture 9: Grounding
Reduce Customer Down Times to a Maximum
P2 - Physics Mains Electricity.
Biosco: MV/LV prefabricated substations IEC Presentation of the standard Safety is a choice.
Presentation transcript:

1 Fault Assistance Centre David Talbot & Chris Armstrong September 2014

2 Agenda Solution and case studies Questions and answers Fault overviewIntroduction

3 Connecting the North West 5 million 25 terawatt 2.4 million £8 billion of network assets

4 Introduction Together with latest techniques and equipment the FAC will prevent many faults from becoming permanent Early location and repair of faults before they become permanent, avoids loss of customer supply The FAC enables early intervention to reduce the impact of cable faults on the LV underground network

5 Fault progression Irregular voltage dips Transitory Irregular fuse operations Intermittent Repetitive fuse operations Persistent Open circuit or welded short circuit Permanent Impact on customers Examples of different faults/animation of different graphs coming in and out

6 Probability of further fault activity Probability MinutesHoursDaysWeeks Insulation cooling Moisture absorption

7 Frequency of faults Number of Events Time elapsed between faults

8 Faults showing distance from substation Fault B Fault D Fault C Fault A

9 What does it cost our business? Impact of transient faults on CIs and CMLs Greater than 3 events 35% of CIs and 31% of CMLs Greater than 5 events 19% of CIs and 16% of CMLs £1.4 million lost revenue £700,000 saving If 3 rd and 4 th trip can be reclosed within 3 minutes Improved customer satisfaction Incentive revenue

10 LV transient faults over a year

11 LV fault management - REZAP Multiple-shot auto-recloser Single phase impedance based fault location Controlled, reset and monitored remotely via Gateway Can be installed on LV boards - indoor substations

12 LV fault management – Modular REZAP Single phase impedance based fault location Multiple-shot auto-recloser Controlled, reset and monitored remotely via Gateway Can be installed in LV cabinets – outdoor substations

13 LV fault management – Bidoyng (smart) 3 phase impedance based fault location Single-shot auto-recloser Monitored via Gateway Can be installed in most pillars and cabinets – outdoor substations

14 WEEZAP Improves supply reliability and restoration through fault management and detection World leading LV vacuum circuit breaker Safe LV interconnection, live monitoring and control Advanced measurement and protection capability

15 Travelling wave using two units Fault disturbance recorder with communications Single TDR for permanent faults TP22/23 fault location equipment Multiple TDRs for transient faults

16 TP22/23 fault location equipment

17 Exploiting the potential of LV devices Solution: Kelvatek’s Fault Assistance Centre (FAC) that will actively monitor the equipment installed on ENW’s LV network – trial under IFI Only key ‘champions’ can perform this analysis Devices are widely used to reduce CI and CML figures Further benefits can be obtained from the data they provide Analysis of data is a specialised subject area/training issue

18 Business case Actively monitors equipment installed on LV network Faster fault location and repair Identification of 2 nd and 3 rd faults on the network Observation of fault ‘pecking’ Identifies circuits with overloading problems Identifies areas with poor health Helps us understand how best to use the LV kit Fault Assistance Centre business benefits

19 FAC process flow Transient identified Electricity NW fit REZAP/Bidoyng/ TP22/23 Details sent to Kelvatec FAC Fault location from Kelvatek to Electricity NW Confirm location Repair fault

20 Fault found - Radcliffe Details sent to Kelvatek FAC Fault location returned of 146 metres Next rupture confirmed with sniffer (two metres out) Fault repaired in four days of fitting REZAP

21 Fault found – Radcliffe

22 Fault found - Radcliffe

23 Fault found - Radcliffe

24 Melting Bidoyngs

25 Melting Bidoyngs – winter 2013/14 Red phase fuse blowing in outdoor cabinet Bidoyngs fitted on all three phases Received 2000 primary fuse ruptured / fuse replaced messages Visited site, found Bidoyng had ‘melted’ Conclusion Load related transient – 550 Amps

26 New Street – first fault

27 New Street – first fault

28 New Street – second fault

29 New Street – second fault

30 Multiple faults Second fault developed several months later Overlaid first fault Will this fault ever develop into a transient ? ? How does a DNO deal with these faults ! Targeted asset management Second fault never taken fuses

31 Summary Expensive and time consuming to repair permanent faults Impact on customer satisfaction Impact Faster fault location and repair Identifies circuits with overloading problems Improves customer service Saves money Benefit FAC exploits potential of existing LV fault devices Actively monitors the equipment installed Data supplied to determine fault location Solution LV transient faults difficult to find Faults progress to permanent state needing lengthy repair time Challenge

32 & QUESTIONS ANSWERS

33 Want to know more? Thank you for your time and attention linkedin.com/company/electricity-north-west facebook.com/ElectricityNorthWest youtube.com/ElectricityNorthWest e