Milano 25-11-2008, Riunione CNI Scopo … To facilitate and promote the progress of engineering and the international exchange of information and knowledge.

Slides:



Advertisements
Similar presentations
AP STUDY SESSION 2.
Advertisements

1
01 Prologo 02 Bran 103 Catelyn 1 05 Eddard 1 04 Daenerys 1 06 Jon 1 07 Catelyn 2 10 Tyrion 1 08 Arya 1 16 Sansa 1 09 Bran 2 11 Jon 2 12 Daenerys 2 13 Eddard.
STUDY COMMITTEE C3, System Environmental Performance Meeting CNI, Latina 24 Novembre 2010 Study Committee C3 Antonio Negri.
Feichter_DPG-SYKL03_Bild-01. Feichter_DPG-SYKL03_Bild-02.
Copyright © 2003 Pearson Education, Inc. Slide 1 Computer Systems Organization & Architecture Chapters 8-12 John D. Carpinelli.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 4 Computing Platforms.
Processes and Operating Systems
Copyright © 2011, Elsevier Inc. All rights reserved. Chapter 6 Author: Julia Richards and R. Scott Hawley.
Author: Julia Richards and R. Scott Hawley
1 Copyright © 2013 Elsevier Inc. All rights reserved. Appendix 01.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 38.
Properties Use, share, or modify this drill on mathematic properties. There is too much material for a single class, so you’ll have to select for your.
Chapter 1 Image Slides Copyright © The McGraw-Hill Companies, Inc. Permission required for reproduction or display.
CIGRE Study Committee B3 “Substations”
Business Transaction Management Software for Application Coordination 1 Business Processes and Coordination. Introduction to the Business.
Summary of Second Draft of the NERC Standard PRC Disturbance Monitoring and Reporting JSIS Meeting August 10, 2010 Salt Lake City, UT.
What causes the commodity price boom? AGRI Green Team Seminar on the Health Check May 15, 2008 AGRI-G1 Agricultural Policy Analysis and Perspectives DG.
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
1 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt BlendsDigraphsShort.
Addition Facts
Year 6 mental test 5 second questions
1 Click here to End Presentation Software: Installation and Updates Internet Download CD release NACIS Updates.
Testing of IEC Based Protection Systems
Break Time Remaining 10:00.
PP Test Review Sections 6-1 to 6-6
Bellwork Do the following problem on a ½ sheet of paper and turn in.
Copyright © The OWASP Foundation Permission is granted to copy, distribute and/or modify this document under the terms of the OWASP License. The OWASP.
CS 6143 COMPUTER ARCHITECTURE II SPRING 2014 ACM Principles and Practice of Parallel Programming, PPoPP, 2006 Panel Presentations Parallel Processing is.
Operating Systems Operating Systems - Winter 2010 Chapter 3 – Input/Output Vrije Universiteit Amsterdam.
15. Oktober Oktober Oktober 2012.
Copyright © 2012, Elsevier Inc. All rights Reserved. 1 Chapter 7 Modeling Structure with Blocks.
Basel-ICU-Journal Challenge18/20/ Basel-ICU-Journal Challenge8/20/2014.
1..
CONTROL VISION Set-up. Step 1 Step 2 Step 3 Step 5 Step 4.
Adding Up In Chunks.
SLP – Endless Possibilities What can SLP do for your school? Everything you need to know about SLP – past, present and future.
MaK_Full ahead loaded 1 Alarm Page Directory (F11)
1 Termination and shape-shifting heaps Byron Cook Microsoft Research, Cambridge Joint work with Josh Berdine, Dino Distefano, and.
SIMOCODE-DP Software.
By CA. Pankaj Deshpande B.Com, FCA, D.I.S.A. (ICA) 1.
1 The mission of Study Committee A3 is to facilitate and promote the progress of engineering and the international exchange of information and knowledge.
25 seconds left…...
: 3 00.
5 minutes.
1 hi at no doifpi me be go we of at be do go hi if me no of pi we Inorder Traversal Inorder traversal. n Visit the left subtree. n Visit the node. n Visit.
Week 1.
Analyzing Genes and Genomes
Speak Up for Safety Dr. Susan Strauss Harassment & Bullying Consultant November 9, 2012.
We will resume in: 25 Minutes.
1 Titre de la diapositive SDMO Industries – Training Département MICS KERYS 09- MICS KERYS – WEBSITE.
Essential Cell Biology
Clock will move after 1 minute
PSSA Preparation.
Essential Cell Biology
Physics for Scientists & Engineers, 3rd Edition
Energy Generation in Mitochondria and Chlorplasts
Select a time to count down from the clock above
Murach’s OS/390 and z/OS JCLChapter 16, Slide 1 © 2002, Mike Murach & Associates, Inc.
Announcements Be reading Chapters 9 and 10 HW 8 is due now.
Study Committee Representatives Annual Report December, 2012
SC B5 - Protection and Automation Report to the Canadian National Committee of CIGRÉ 2010 Simon R. Chano Protection Specialist Hydro Québec TransÉnergie.
Jeju, 13 – 16 May 2013Standards for Shared ICT HIS – Smart Grid Karen Bartleson, President, IEEE Standards Association Document No: GSC17-PLEN-72 Source:
Amantegui Javier (SP) CIGRE Study Committee B5 1 CIGRE STUDY COMMITTEE B5: MISSION AND CHALLENGES Javier Amantegui (Spain) Chairman of CIGRE-SC-B5 “Protection.
Protection Specialist
SC B5 - Protection and Automation Report to the Canadian National Committee of Cigré 2007 Simon R. Chano Protection Specialist Hydro Québec TransÉnergie.
SC B5 - Protection and Automation Report to the Canadian National Committee of CIGRÉ 2009 Simon R. Chano Protection Specialist Hydro Québec TransÉnergie.
Protection Specialist
Presentation transcript:

Milano , Riunione CNI Scopo … To facilitate and promote the progress of engineering and the international exchange of information and knowledge concerning principles, design, applications, coordination, performance and asset management of System Protection, Substation Control and Automation, Remote Control Systems and Equipment, Metering Systems and Equipment. SC B5 – Protection and Automation Membership 24 membri regolari 13 membri osservatori Membro italiano: G. Vianello Presidente: G. J. Amantegui (SP) Segretario: Iony Patriota (BR) SC website:

Milano , Riunione CNI SC B5 – Risultati principali della Conferenza Impact of IEC process bus on protection and substation automation systems (39 contributi) - discussi i problemi: accesso al sistema per le prove, concetto di prova, interoperabilità ancora un obiettivo - implementazione ancora a livello di sviluppo, non di realizzazione Life Cycle Management of Protection and Control Systems (48 contributi) - Tendenze: ruolo sempre più spinto del software e quindi virtualizzazione e distribuzione di IED; standardizzazione hardware - Necessità : Strumenti per la gestione di modelli, versioni e configurazioni; per la personalizzazione da parte degli utenti (specificazione e prove); per laccesso remoto (security)

Milano , Riunione CNI TypeNumberTitleName of Conv.Cr.Disb. AGB5.51Substation Automation & Remote Control J. Ordacgi (BR) 2007 /8 AGB5.52Protection & Monitoring of Main Plant & Circuits S. Chano (CA)2007 /8 AGB5.53Monitoring, metering, recording & Overall System Protection R. Adams (UK)2007 /8 SC B5 – Advisory Groups attivi

Milano , Riunione CNI TypeNumberTitleName of Conv.Cr.Disb. WGB5.04Modern Techniques for Protecting and Monitoring Generating Plants G. Benmouyal (CA) WGB5.05 Modern Techniques for the Protecting, Monitoring and Control of Power Transformers M. S. Sachdev (CA) WGB5.06Maintenance Strategies for Digital Substation Automation Systems V. Leitloff (F) WGB5.07Modern Techniques for Protecting and Monitoring of Transmission Lines S. Chano (CA) WGB5.08 Refurbishment Strategies based on (Total) Cost of Ownership, Operational Risk and Technical Constrains P. Leushuis (NL) SC B5 - Working Groups attivi

Milano , Riunione CNI TypeNumberTitleName of Conv.Cr.Disb. WGB5.10Protection, monitoring and control of series compensated networks J. Zakonjsek (SE) WGB5.12Engineering Guidelines for IEC61850 Based Substation Automation Systems J.Castellanos (ES) WGB5.14Wide Area Protection and Control Technologies V. Terzija (UK) WGB5.15Distance Protection Functions for Modern Applications D.Tziouvaras (US) WGB5.16Modern Techniques for Protecting Busbars in HV Networks Z. Gajić (SE) WGB5.19Protection Relay CoordinationH. Kameda (JP) SC B5 - Working Groups attivi

Milano , Riunione CNI TypeNumberTitleName of Conv.Cr.Disb. WGB5.20New Trends for Automated Fault and Disturbance Analysis M. Kezunovic (US) WGB5.21New Local Protection & Control Approaches To Minimise The Impact Of System Disturbances A. H. Abu Bakar (MY) WGB5.31Lifetime management of relay settings P.Crossley (UK) WGB5.32Functional Testing of IEC Based Systems I. Patriota (ES) WGB5.34The Impact of Renewable Energy Sources and Distributed Generation on Substation Protection and Automation J. A. González (ES) SC B5 - Working Groups attivi

Milano , Riunione CNI TypeNumberTitleName of Conv.Cr.Disb. WGB5.36Application for Protection Scheme Based on IEC61850 D.Tholomier (FR) WGB5.37Protection, Monitoring and Control of Shunt Reactors P. Naisani (CA) WGB5.38The Impact of Implementing Security Requirements using IEC D. Holstein (US) WGB5.94High Impedance FaultsI. Ojanguren(ES) SC B5 - Working Groups attivi

Milano , Riunione CNI SC B5 - Working Groups attivi

Milano , Riunione CNI SC B5 - Nuove attività e futuri W.Groups Sono stati decisi i seguenti nuovi W.G. : Impact of HVDC on Protection & Control (JWG (SC B5/B4) Proposta una partecipazione italiana (corrispondente) Protection of hybrid line/cable circuits in transmission networks JWG (B5/D2) Application Guide on digital inter-S/S comm.s for protection (JWG (SC B5/B4) Proposta una partecipazione italiana (membro regolare) Protection requirements on transient response of voltage and current digital acquisition chain Proposta una partecipazione italiana (corrispondente) Standardised protection schemes Occorre individuare i nominativi dei due membri corrispondenti.

Milano , Riunione CNI SC B5 - Prossimi meetings Jeju Island, Korea, colloquium 2009, Oct P.S.: Protection & Control of FACT devices and impact on Protection Systems Wide Area Monitoring, Control & Protection Technologies PS1 - Strategies for the Lifetime Maintenance of SAS Systems Synopses: entro Feb 2009 Full papers: entro Giu 2009 Tutorial Topic: Experience in the protection of multi-circuit & multi- terminal lines and power transformers

Milano , Riunione CNI Notizie aggiuntive del regular meeting JWC B5/D2 – E stata proposta una common session (Parigi 2010) sul tema Practical implementation of IEC in electric power systems Advantages for implementation outside the substation Impact on Substation Automation (security, WiFi, teleprotection requirements) Architecture and Information Technology aspects between Substation Automation and Remote Communication Communication needs for System Protection Schemes an Wide Area Measurements

Milano , Riunione CNI SC B5 -Soggetti preferenziali per la Sessione 2010 APPROVATI Protection Control & Monitoring Beyond allocation of P&C funcs– architecture of SAS - new concepts -new requirements –recording Impact of renewable energy sources and new generation on protection and automation of substations (WG34) – controlled islanding – impact on WAP & SIPS - connection protection -IEC on generator protection – restoration policies – distribution protection