Challenges of Jack-up Barges in Port Environment Russell Bird Group Hydrographic and Dredging Manager Direct Report to Group Harbour Master.

Slides:



Advertisements
Similar presentations
TEN-T support for Port projects under 2012 Annual Call INFO DAY 2012: Ports (AP) Jose Anselmo, DG MOVE Morten Jensen, TEN-T Executive Agency Brussels,
Advertisements

The Marine Response Centre SPEAKER NAME SPEAKER APPOINTMENT National Contingency Plan – Environment Group Training.
Container Ship Construction
Dredging.
Shipboard Procedure Manual
Company Profile.
The Seismic Dilatometer test (SDMT) in geotechnical inshore and offshore investigation Fino a qualche decennio fa le indagini geotecniche venivano eseguite.
DREDGING YOUR DOCKS 2013 Supported by: USACE Galveston District U. S. Coast Guard Sabine Neches Navigation District.
Don’t Forget to Invest in the Vessels: Two Linked Vessel-Focused Projects on the Columbia River.
 5 ship docks designed for Aframax tankships 80K - 120K DWT  Mooring piles with quick-release capabilities  Mooring system analysis being conducted.
Galveston County Pilots Tariff Application May 3, 2010.
Port Heavy Weather Plan for Northeast and Eastern Central Florida.
LCDR Quincy Davis Commanding Officer Marine Safety Unit Baton Rouge.
TSIGELI PORT Located west coast Gulf of Pagassitikos Lat: 39  10’- 39  11’N & Long: 22  49’-22  51’E.
Briefing to Kenai Peninsula Borough February 19, 2013.
ISTEC Meeting London October 2011 Introduction to a new
DREDGING YOUR DOCKS 2012 Organized By CRA Hydrographic Surveyors Orion Marine Group.
CANADIAN COAST GUARD AUXILIARY - PACIFIC PASSAGE PLANNING CANADIAN COAST GUARD AUXILIARY - PACIFIC February 2012.
MEETING THE CHALLENGES FOR GLOBAL SHIPPING
Tomislav Skračić, MA Undergraduate English Course for MARITIME MANAGERS 6th Semester Essential reading: ● T. Skračić, Waypoint – English Textbook for Maritime.
The 7th ITOSF FORUM, Singapore
Marine Safety Branch Transport Canada Presented at Gander, NL - March 08, 2004.
COMPANY PROFILE Established in March 2009, Straits Navigations provides a one-stop solution for the maritime industry. Under the arm of the globally renowned.
Adapted from Skračić,T., „Waypoint”
DIVISION OF PORTS AND HARBORS PORTSMOUTH, NEW HAMPSHIRE Captain Geno J. Marconi, Port Director.
THE VULNERABILITY OF GULF OF MEXICO SHIPYARDS TO COASTAL FLOODING AS A RESULT OF STORM SURGE By Capt. Christopher Bowman.
DSM 2315 Shipping and Transport Logistics Management
Maritime Security from the Viewpoint of Maritime Labor George A. Quick Vice President International Organization of Masters, Mates and Pilots.
W w w. b a l t i c m a s t e r. o r g WORK PACKAGE 2- FINAL RESULTS WP2 Seminar / Baltic Master II Partner Search The 19th of Dec., 2007 Prepared by Jakub.
Module 4 Legal Tools for Port Reform.
Assets Ship in Service Training Material A-M CHAUVEL 2009.
Risk Management Strategy For Large Scale Petroleum Operations In Orkney and Scotland Captain Graeme R Smith.
TITLE of the Slide UNITAS ISM Code Module IV Training Material.
Master / Pilot exchange
“Safety in the North”, Alta August 2010 Svalbard’s Maritime Zones The (lack of) jurisdiction of Norway over foreign maritime activities in the waters.
Exciting study and well paid careers. A diverse range of career pathways: Seafaring Maritime Engineering Marine Science Maritime Business.
The GLAs’ e-Navigation Programme Dr Sally Basker & Dr Nick Ward Presented at CGSIC, 22 nd September 2009.
Drew Brandy Defining Connectivity at Sea INMARSAT > June 2015 © Copyright Inmarsat Global Limited 2015.
Dredging Engineering: Building & Maintaining Underwater Highways
LATIN AMERICAN PANEL OCTOBER 16, 2009 MARINE ISSUES JOSEPH ANGELO DEPUTY MANAGING DIRECTOR.
THISVI PORT Located Gulf of Corinth Lat: N & Long E.
Visiting le Havre Port on October 16th eSI Class The Port Conference.
Sea Change? The role of transformational infrastructure – a case study and observations 27June 2014 Dave Trimingham.
Authority: Who Does What?. Los Angeles – Long Beach Area Contingency Plan Marine Firefighting and Salvage Plan.
DaGoB Shipment of Dangerous Goods – Shipowner’s Perspective Elisa Mikkolainen Chartering Crystal Pool Oy.
UNION OF CRUISE SHIP OWNERS & ASSOCIATED MEMBERS I Cruise Update at Posidonia 2012 Presented by Mr. THEODORE C. KONTES President Union of Cruise Ship Owners.
Towage Procurement Process – Industry Briefing 05 May 2014.
YOUR RELIABLE PARTNER BINTANG SUBSEA.
 FPSO — floating production, storage, and offloading systems; offloading of the crude oil to a shuttle tanker;  These are typically converted or newly.
Anchorage #9 Ship Booming Demonstration Overview PISCES II - Projections.
Marine Dock Facilities. Marine Dock Facilities Project Experience  Design and inspection of construction of New Oil Docks – Port of CC  Rehabilitation.
Bridge Procedures Guide
Chapter 6.  Moveable rigs include drilling barges, drill ships, jack-up rigs, and semisubmersible rigs.  Offshore rigs use a device called a top drive,
Contact Point Harbor Master:Japan Coast Guard: Port Manager:Other: Port and Ship Information Ship name:Gross Tonnage: No. of Crew:No. of Passenger: Basic.
Super Ultra Large Container Vessel Operations in the Port of NY/NJ
The Briggs Group.
Commercial Vessel Master Test 1a
MULTI-PURPOSE DOCK GARY PAXTON INDUSTRIAL PARK | SITKA, ALASKA
Environmental concerns
Associated British Ports Marine Presentation
Prepared for - tusharhsonawane.wordpress.com
PORT OF EVERETT MARINE TERMINALS MASTER PLAN UPDATE
Gatchalian, Rein Edrian Hernandez, Diana Erika Ramos, Aira Coline
Hydrographic awareness and the benefits of hydrography
Safe Transfer of Personnel
Breaches.
INTRODUCTION TO PORT DESIGN
Brian McVey Environmental Engineering Manager HII-Ingalls Shipbuilding
Presentation transcript:

Challenges of Jack-up Barges in Port Environment Russell Bird Group Hydrographic and Dredging Manager Direct Report to Group Harbour Master

Overview  Port of Liverpool  Physical restrictions of Jack–up barges in enclosed dock system- manoeuvring, towage and berthing  Operational considerations of Jack-ups within enclosed dock system and wider port limits  The ‘grey-area’ of offshore work practises within the coastal cell  Liverpool 2 development and future Jack-Up operations  Any Questions?

Port of Liverpool- outer limits

Examples of recent vessels

Physical Restrictions  Often unusual vessels to be piloted into port environment  Significant challenges to Pilotage and Safety  Harbour Towage on smaller jack-up vessels- consider ‘composite units’  Generally heavy towage arrangements- reliance on wires, possibly ‘port ops’ configuration- low weight high strength systems  Sometimes conflict between DP vessels and manual manoeuvring through docks systems and into locks  When arriving ‘dead-tow’, benefits of having dedicated barge master to liaise with mooring party and pilot.  Small deck crews with limited experience of berthing operations i.e heaving lines at low water

Operational Considerations  Short notice approach not always conducive to efficient operations when in port  Ports do not always have up to date sediment information for berths and therefore conflict when vessels request permission to ‘Jack-Down’  PP £10m indemnity required  OR enough notice for assessment of berth for sediment type and depth  Often receive request for cranage to be driven from shore to barge  Emergency Anchorage requirements  Larger barges struggle to find adequate areas for anchoring within port and anchoring arrangements i.e jacking-down rather than traditional anchor methods

Anchorage issues

Indemnity Form- Example  Indemnify port against:  Time loss  Revenue loss  Recovery

Offshore working in an inshore environment  Many owner/operators are used to operating vessels in the offshore environment  International regulation  Freedom to move  Operations now undertaken in coastal area and port limits  Pilotage  Insurance  HM Requirements and safety assessment  Often outside navigable and operational areas- clash with port bye-laws and operations teams  MARPOL or Waste discharge consent?

Liverpool 2 and future operations  Liverpool 2- £350m project for river terminal to accommodate 2 x post- panamax container ships  Numerous jack-ups of varying sizes used in construction project already, crew transfers and piling  Harsh physical environment and unique operating procedures developed  Future operations of jack-up barges in Irish sea and Port of Liverpool  Set to increase with development- L2, cruise liner facility, Irish Sea Array  Operators/agents growing more confident with use of barges within restrictions of port environment

Any Questions? Thankyou