Won’t count Won’t count Another quiz, in two weeks Another quiz, in two weeks The Quiz.

Slides:



Advertisements
Similar presentations
International Building Code
Advertisements

Facilities Management and Design Chapter 4 Safety and Security systems.
Fire-Resistive Construction (2nd part)
Summary of NFPA 101 Interior Finish Requirements
Building CODES Arch 3011 Design Studio 1 Prof. Sargent Architecture Southern Polytechnic State University.
HEAD-OF-WALLS. Presenter-Brice Miller 23 years as Building Official, Inspector and Plans Examiner 23 years as Building Official, Inspector and Plans Examiner.
Frontline Fire Officer Training: Firestopping and Path of Travel Why it should matter to you Developed by the International Firestop Council
Building Construction A fire resistive rating (FRR) is given in minutes or hours and relates to how long it takes to burn through a given material. Expressions.
Division 08-Openings ARCH 330 Fall Master Format OPENINGS Operation and Maintenance of Openings Schedules for Openings
January 16, 2014 Brad Keyes, CHSP Changes to the 2014 Acute Care & Critical Access Hospital Manuals on Life Safety Compliance.
2007-CBC - UL Damper Requirements
FCIA EFC Maintenance Maintenance of Effective Compartmentation - Scott Rankin, Pyro- Stop, LLC FCIA 2004 Past President - Bill McHugh, FCIA Executive Director.
Through Penetration Firestops.
NFPA Chapter 6 Chapter 6 is used to classify the occupancy and the hazard contents Proper classification is used to guide the implementation of.
Chapter 23 Interior Walls & Partitions. Interior Partitions Performance Criteria  Strength  Fire Resistance  Durability  Acoustical Isolation Materials.
ARCHITECHURAL ELEMENTS.
Smoke Control Fire-Rated Stairwells Fireproofing of Structural Components Egress Lighting Fire-Resistive Construction Elements Fire and Smoke Dampers Emergency.
Fire.
2012 International Fire Code Adopted as the minimum fire safety standard by the State of Wyoming City of Sheridan must adopt the minimum standard to retain.
FIRE DESIGN OF BUILDINGS VULNERABLE GROUPS. COMPONENTS OF FIRE building materials unattended stoves Loose electrical connections overloaded electrical.
Chapter 4: Air Leakage Control: Materials and Techniques
FALAR Part 3 – Post Construction  Compilation of  Maintenance records of fire protection/life safety equipment  Test records of fire protection/life.
Fire and Smoke Resistant Assemblies – Passive Systems.
Stafford County Public Schools Safety Program
PERFORMANCE & CODE ANALYSIS TIMBer Inc. ·Brooke Fedder · Marie Rottschaeffer· Izzie Molinuevo· Tena Pettit·
Architectural CAD I – IM230 Vocabulary. GROUP 3 Vocabulary.
Partitions Compartmentation One area of a building is separated from another by the use of fire rated materials System that creates self contained areas.
2009 The Physical Environment
Building Codes. Codes  Building Code –Regional  BOCA, SBCCI, CABO, UBC, CITY OF DALLAS, –National  IBC  Fire Code –NFC, UFC, NFPA, Life Safety 101.
Fire-Related Properties of Materials Chapter 7. Mehta, Scarborough, and Armpriest : Building Construction: Principles, Materials, and Systems © 2008 Pearson.
Code Analysis. Identify the relevant codes  Local building code  Local accessibility code (or ADA)  Local fire code (or the NFPA)  Mechanical, electrical.
Leakage Ratings Through Walls, Dampers, Doors, Firestops and Joints Richard N. Walke Underwriters Laboratories Inc.
Fire Safety By Alicia Civile and Alexandra Fernandez.
Lift Typical Building Floor Plan. Complete with fire walls. Click on and we will add Some of the different Passive and Active systems that you could come.
Firestopping – Filling the Gaps Makes a Difference Poole Fire Protection Brian Griffin & Jack Poole, PE 2007 DOE Contractor Fire Protection Workshop Argonne.
ID 308 Construction + Materials IV: Construction Documents Prof. Brody Endicott College Systems Coordination.
Picking up from last week…. Fire stair layout Fire stair layout Due October 18 th Due October 18 th Assignment #1.
Fire No institution is immune from fire. Flood damage can be dried out and restored, stolen property has a chance of being recovered; damage from fire.
Chapter 5 ID 234 Building Codes Fire Resistant Materials and Assemblies.
ID 234 Building Codes Life Safety Diagram:Review.
Design Development Code analysis Partition types.
ID 234 Building Codes Fall 2012 Means of Egress Chapter 4.
Fire-Resistant Materials & Assemblies Part 2 Chapter 5.
Chapter 9 ID 234 Building Codes Fall 2012 Finish and Furniture Selection.
Means of Egress Part 3 Chapter 4.
Finish & Furniture Selection ID 234 Chapter 9 What is Regulated by Codes: Walls & Ceilings – Class A, B, C (flame spread/smoke) Floors – Class I & II.
ARCHITECHURAL SIMPLICITY.
Codes and costing construction + materials II. Building Code (780 CMR) Building Code (780 CMR) Accessibility Code (521 CMR) Accessibility Code (521 CMR)
Chapter 6 ID 234 Building Codes Fire Suppression.
ID 234 Building Codes Fall 2011 Means of Egress Chapter 3, part II.
Chapter 4 ID 234 Building Codes Fall 2011 Means of Egress.
Work Area Method Level 3 Alterations – Chapter 9 prescribes requirements. 50% of Building Area Rule.
Plumbing Radiant Heating & Cooling Turf Conditioning Permafrost Ice and Snow Melt Ecoflex ® SupportSustainabilityEngineered PolymerCommercial SystemsIntroductions.
Chapter 6 ID 234 Building Codes Fire Suppression.
Exercise #2 (part 2) Based on what you read in Chapter 4, determine if the corridors and exit doors meet the requirements for egress width, according to.
1 Fire Protection and Fire Stopping. 2 Module 7 - Firestopping and Comprehensive Fire Prevention Systems Identify the elements of a comprehensive fire.
Safety Rule #1 Open flames are not allowed without first obtaining a permit. The exception to this rule is during a period of closely supervised instructions,
Fire Loss Control - Basic Elements
What’s with Time Square West? No. of Floors 43 Retail 1st and 2nd floor Parking 5 floors(2 basement, 3rd to 5th floor) No. of units 738 No. of parking.
Barrier Management Symposium
Safety and Prevention of Typical Fire Plan
How Completed Interiors Are Achieved: Designing & Building
Construction Documents
ID 234 Building Codes Fall 2008 Fire Suppression Chapter 5.
INTD 405 Modern Practices in Interior Design DOOR & WINDOW SCHEDULES
Fire Door Inspections Qualified Training
Building Construction
INTD 405 Modern Practices in Interior Design DOOR & WINDOW SCHEDULES
Building standards Mr. Da Silva.
© OnCourse Learning.
Presentation transcript:

Won’t count Won’t count Another quiz, in two weeks Another quiz, in two weeks The Quiz

Fill out General Data for your studio project Fill out General Data for your studio project Fill out accessibility data Fill out accessibility data Graded Graded For next week

Chapter 5 ID 234 Building Codes Fall 2008 Fire Resistant Materials and Assemblies

Fire / Smoke Protection Systems Passive systems: prevent fires Passive systems: prevent fires Fire and smoke barriers Fire and smoke barriers Finishes and furniture Finishes and furniture Active systems: once a fire has started Active systems: once a fire has started Detection Detection Extinguishing / Suppression Extinguishing / Suppression Emergency lighting Emergency lighting Exiting systems: architectural elements Exiting systems: architectural elements Means of egress Means of egress

Compartmentation  “Compartmentalization”  Passive fire protection means  The separation of areas in a building to control fire and smoke  Use Wall, Floor, and Ceiling Assemblies  “Fire resistance” (of assemblies) vs. “fire protection” (of penetrations in those assemblies)  “Fire barriers” (for compartmentation) vs. “fire and smoke partitions” (not specific to egress; residential, tenant spaces)

All use standard materials All use standard materials Sometimes in standard configurations Sometimes in standard configurations Fire Barriers and Fire Partitions

Use Fire Barriers for Sep. of Occupancy

Fire Barriers

Fire Barriers and Fire Partitions

Fire Barriers

Fire and smoke partitions

Incidental Uses

Fire Separation walls

Fire Barriers

Exit Access Corridors Rated at ½ hour to 1 hour

Passive fire protection Passive fire protection Also create compartments Also create compartments Differentiate between horizontal and vertical Differentiate between horizontal and vertical Smoke Barriers

Characteristics of Smoke

Fire Rated Materials and Assemblies Underwriters Laboratories (UL) Underwriters Laboratories (UL) Fire resistance Directory Volume 1 & 2 Fire resistance Directory Volume 1 & 2 Gypsum Association (GA) Gypsum Association (GA) Fire Resistance Design Manual Fire Resistance Design Manual Factory Mutual (FM) Factory Mutual (FM) Specification Tested Products Guide Specification Tested Products Guide

Standard Assemblies Standard Assemblies

Provisos

For doors and windows For doors and windows For mechanical, structural, HVAC penetrations For mechanical, structural, HVAC penetrations Openings

Opening Protection Rated Door Assemblies Rated Door Assemblies Door and Frame Door and Frame Door Hardware Door Hardware Fire Window Assemblies Fire Window Assemblies Rated Glazing and Frames Rated Glazing and Frames Specially Tempered Glass Specially Tempered Glass Wire Glass Wire Glass Glass Block Glass Block Clear Ceramics Clear Ceramics Insulated and Multilayered Glass Insulated and Multilayered Glass Transparent Wall Units Transparent Wall Units Frames Frames

Opening Protection

Opening Protectives

Fire Resistant Materials and Assemblies

Through-Penetration Protection Firestops Firestops Fireblocks and Draftstops Fireblocks and Draftstops Damper Systems Damper Systems Fire Dampers Fire Dampers Smoke Dampers Smoke Dampers Ceiling Dampers Ceiling Dampers

Fire Resistant Materials and Assemblies

Door tests

Test-ers

Key Terms

Checklist

Products Door types (for schedules, specs) Door types (for schedules, specs) Door types Door types Steel door standards Steel door standards Steel door standards Steel door standards Specialty applications Specialty applications Specialty applications Specialty applications Regular doors Regular doors Regular doors Regular doors Big doors Big doors Big doors Big doors Transparent ceramics Transparent ceramics Transparent ceramics Transparent ceramics Panic hardware Panic hardware Panic hardware Panic hardware