ColumbiaGrid Planning Update to PCC Marv Landauer October 7, 2014.

Slides:



Advertisements
Similar presentations
ColumbiaGrid Reliability Workshop October 1, 2007 Developmental and Staffing Reliability Functional Agreement (DSRFA) Details This program is the cornerstone.
Advertisements

NERC TPL Standard Issues TSS Meeting #146 Seattle, WA August 15-17, 2007 Chifong Thomas.
1 ColumbiaGrid Update June 27, Activities Planning OASIS Redispatch 2.
1 WECC PCC Meeting March 7, Members Avista Bonneville Power Administration Chelan County PUD Cowlitz County PUD Grant County PUD Puget Sound Energy.
ColumbiaGrid Update WECC PPC June 11, Biennial Plan Update Approved by the ColumbiaGrid Board of Directors on February 17, 2010.
March 26, 2014 Transmission Coordination and Planning Committee 2014 Q1 Stakeholder Meeting.
Western Interconnection Subregions for PSA Layne Brown Manager, Reliability Assessments.
CREPC Meeting November 5-6, 2007 Snapshot of Major Transmission Proposals and Status of Transmission Planning Presenters: Paul Arnold and Jeff Miller.
Public Service Company of New Mexico
Preliminary Impacts of Wind Power Integration in the Hydro-Qubec System.
NORTHWEST POWER POOL Reliability Update
NTTG Economic Study and Biennial Study Update NTTG Economic Study and Biennial Study Update NTTG Study Cycle.
Preliminary Review of July 24 th Extreme Temperature Event & Implications for Pilot Capacity Standard Mary Johannis & Wally Gibson PNW Resource Adequacy.
Ad Hoc West-wide Resource Assessment Team (WRAT) : Assessment of Western System Adequacy in the Short-term Jeff King Northwest Power Planning Council Presentation.
1 May 8, 2006 Briefing to Northwest Congressional Delegation Staff.
SPP’s 2013 Energy Consumption and Capacity 2 12% annual capacity margin requirement CapacityConsumption Total Capacity 66 GW Total Peak Demand 49 GW.
MARCH 31, 2014 Maine 2014 Outage Coordination CONTAINS CRITICAL ENERGY INFRASTRUCTURE INFORMATION – DO NOT RELEASE.
WECC PCC Meeting Salt Lake City, UT March 26, 2014.
WECC PCC Meeting Salt Lake City, UT July 16, 2014.
NWPP MC Initiative WECC Update March 25th, 2015 Kathy Anderson
NOVEMBER 11, 2014 PUBLIC VERSION Maine 2014 Outage Coordination CONTAINS CRITICAL ENERGY INFRASTRUCTURE INFORMATION – DO NOT RELEASE.
Preliminary Analysis of the SEE Future Infrastructure Development Plan and REM Benefits.
Review of BPA Voltage Control Conference
NW Transmission System Bottlenecks and Impacts of 2005 Summer Operation BPA Transmission Business Line Mike Viles January 2006.
Energy Gateway Gateway West Project Gateway South Project
Study Results Drought Scenario Study This slide deck contains results from the 2011 TEPPC Study Program. This study shows the impact in the interconection.
Increasing Access to the Grid NIPPC September 8, 2005 Brian Silverstein VP, Operations and Planning Bonneville Power Administration.
NORTHWEST POWER POOL Reliability Update – Summer 2010 April 2010 Jerry D. Rust.
2006 Reliability Study Scope Name Date. DRAFT 2 Purpose of Study Assess the PEC and Duke transmission systems’ reliability Develop a single reliability.
Long Term Study Task Force Update Transmission Study Practices and Methodologies April 5th,2011 LTS.
1 Wind Integration Study Team (WIST) Report to the Northwest Wind Integration Forum Steering Committee January 6, 2010 Jeff Miller - ColumbiaGrid Rich.
Base Case Draft – For Comment Rocky Mountain States Sub-Regional Transmission Study December 9, 2003.
Announced Coal Unit Retirements: Effect on Regional Resource Adequacy Council Meeting January 16, 2013 Portland, Oregon Boardman Centralia 1.
1 The Northwest Wind Integration Action Plan Status Update December 14, 2010.
Study Goal:  Perform a “bottom-up” assessment of the sustained peaking capacity of the Pacific Northwest Hydro System over the highest 18 hours in a 3.
ISO Outlook Summer 2005 and Beyond Senate Energy, Utilities and Communications Committee February 22, 2005 Jim Detmers Vice President of Grid Operations.
Sixth Northwest Conservation & Electric Power Plan Draft Wholesale Power Price Forecasts Maury Galbraith Northwest Power and Conservation Council Generating.
Montana Energy Summit April 22, 2008 Ancillary Service – Regulating Reserves.
Plan Today. Power Tomorrow. The Utility Perspective PNUCC June 11, 2009.
Study Results High EE/DG/DR Study This slide deck contains results from the 2011 TEPPC Study Program. This study shows the results of an increase of EE/DG/DR.
Resource Adequacy Steering Committee Meeting October 4, 2011.
January 29, 2010Resource Adequacy Steering Committee 1 Sustained Peaking Capacity Analysis Initiated by the Adequacy Forum Input Information from Utilities.
October 29, Organizational role of Short-Term Planning and Hydro Duty Scheduling Relationship to other groups in BPA Planning and analysis job.
Northwest Power and Conservation Council A Look At The Council’s Conservation Planning Methodology and Assumptions A Look At The Council’s Conservation.
1 Wind Integration Study Team (WIST) Report to the Northwest Wind Integration Forum Technical Work Group October 29, 2009 Jeff Miller - ColumbiaGrid Rich.
January 14, 2016 PacifiCorp-CAISO-NVE EIM Initiative Overview.
ColumbiaGrid Updates PCC Meeting October 15,
NW Loss of Load Probability James Gall Power Supply Analyst
PacifiCorp and CAISO Expanding Regional Energy Partnerships
A new Nomogram Development POM- based tool - Application results in the Idaho Power System. Orlando Ciniglio, IPC Marianna Vaiman, V&R Energy WECC TSS.
2006 Reliability Study James Manning Bryan Guy May 12, 2006.
Dynamic Transfer Limits Study WIST Update 12/17/09 Brian Tuck, BPA.
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N 1 5/09/2011 West of Cascades – North (WOCN) Path BPA Studies Path Definition (for studies) 
©2003 PJM 1 Presentation to: Maryland Public Service Commission May 16, 2003.
Northwest Coal Retirement Reduction Study Development of Base Case Assumptions and Scenarios PNUCC Meeting October 15,
Local Area Planning Update – TRANSAC Base Case Status Base case study models representing the base scenarios will be completed as follows for.
Economic Planning Study Presentation Northwest Coal Retirement Reduction Study Results Kevin Harris February 3, 2015.
Slide 1 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N BPA Network Open Season 2013 Cluster Study ColumbiaGrid Planning Meeting May 2, 2013.
PC04 High Hydro Study Results
Topics Corporate Overview – Transmission Expansion Planning - Members
EPS Updates ColumbiaGrid Planning Meeting October 13, 2016
Outline Background Study Assumptions Study Results To Do
Update on Utility Integrated Resource Plans
PacifiCorp-CAISO-NVE EIM Initiative Overview
Regional Transmission Landscape
Study Results California In-State Net-Short California Out-State Net-Short California Out-State Net-Short w SWIP N This slide deck contains results from.
Study Results Drought Scenario Study
Planning Meeting November 4, 2010 Marv Landauer.
ColumbiaGrid Planning Update to PCC Marv Landauer October 7, 2014
Presentation transcript:

ColumbiaGrid Planning Update to PCC Marv Landauer October 7, 2014

Variable Transfer Limit Studies for COI Regional Planning Processes Order Biennial Plan Economic Planning Studies ColumbiaGrid Planning 2

Avista Corporation Bonneville Power Administration Chelan County PUD Cowlitz County PUD Douglas County PUD Enbridge Grant County PUD Puget Sound Energy Seattle City Light Snohomish County PUD Tacoma Power 3 Members and Planning Participants

4 Variable Transfer Limit Study for COI Updates to VTL numbers for EIM implementation Utilizing collaborative methodology developed last spring 

1. Customer Service Impacts  Acceptable voltage ranges for transmission busses 2. System Equipment Impacts  No manual operation of equipment especially RAS within the scheduling period 3. Reliability Impacts  Contingency analysis of critical points from #1 and #2 VTL Methodology 5

6 VTL Study for COI Power Engineers is performing the study State Estimator cases used as starting points Analyzing 2-week periods for 3 seasons  Spring (for Fall and Spring operations)  Winter  Summer

7 VTL Study for COI (cont) Approximately 300+ cases per season For COI study, simulate transfer between CA/PNW  CA generation: Midway and Bay Area  PNW generation: Gorge wind and Mid Columbia hydro Ongoing study, anticipated completion – Oct 2014

8 WECC Regional Planning 1. Central Ferry-Lower Monumental Planning Review Group 2. PDCI Upgrade Project Rating 3. West of McNary Reinforcement Rating Process

9 Order FERC responded to ColumbiaGrid filing on September ColumbiaGrid is comprised of both jurisdictional and non-jurisdictional members 3. Cost allocations are binding to enrolled members 4. Non-jurisdictionals can choose to enroll days to refile with FERC

10 Biennial Plan Sensitivity Studies Four sensitivity studies are ongoing  Comprehensive N-1-1 outages study  NW Washington Load Area IROL verification in the planning horizon  Post Contingency voltage angle differences  Maximum area generation during light load The study results will be presented in upcoming planning meetings and included in the next Biennial Plan

11 Economic Planning Study Backcast 2010:  Backcast power flow on key paths within WECC  West of Cascades North and South, Montana to NW, Idaho to NW, COI, PDCI, WOR,..  Input actual loads, fuel cost, transmission system,  Learn what modeling techniques are required to mimic historic operations Forecast 2014, and 2017:  Apply lessons learned in the backcast to the forecast runs.  This assumes that future operations will mimic historic operations  Compare loading of lines/paths, congestion, change in flow patterns and area losses

Economic Planning Study Coal Retirement Study:  Evaluate location impact of replacement capacity for Centralia on the Pacific Northwest transmission system  Three areas are being considered for replacement capacity: Centralia area, North of Seattle, and Stanfield Area (McNary to Boardman)  Replacement capacity is assumed to be combine cycle  Run with 2017 loads: This eliminates the need to install new capacity to meet load growth and reserves for 2024 (+19,000 MW of additional supply)  Include announced Coal retirements, replacement projects and fuel conversion to NG (impacting 6,500 MW of ST-Coal from 2013)  Include California Once Through Cooling retirements  Sensitivities on potential retirement of Colstrip 1&2 and additional wind in Montana

Questions?