Tracy Rolstad TSS Chair TSS Chair Report October 2014 Salt Lake City, UT 1.

Slides:



Advertisements
Similar presentations
PCC Update Presentation to TEPPC June 2010 Dana Cabbell PCC Chair.
Advertisements

NERC TPL Standard Issues TSS Meeting #146 Seattle, WA August 15-17, 2007 Chifong Thomas.
Sequence Data, Power Flow & Transient Stability (PF & TS) MSRATF - July 10, 2013 Joe Seabrook.
WESTERN ELECTRICITY COORDINATING COUNCIL OPERATIONS COMMITTEE June 18, 2009 Salt Lake City, UT Base Case Coordination System (BCCS) Request For Information.
1 TSS Report PCC Meeting Salt Lake City, UT October 26-27, 2006.
Model Specification Requirements MSRATF Meeting – Mar 11, 2013 Stephanie Lu, MVWG Chair Seattle City Light.
1 MSRATF Update to TSS (Modeling SPS and RAS Ad Hoc Task Force) Scope of Work Approval January 25, 2013 Joe Seabrook Puget Sound Energy.
Joe Seabrook Puget Sound Energy, Inc.
1 MSRATF Update to TSS (Modeling SPS and RAS Ad Hoc Task Force) May 15, 2013 Joe Seabrook Puget Sound Energy.
Bulk Electric System Definition Task Force Update Reliability Policy Issues Committee March 4, 2010 Brian Theaker BESDTF Chair.
Jerry Rust Chair - Underfrequency Load Shedding Criterion Team
WECC Planning Coordinating Committee Brian K. Keel Chair – Reliability Subcommittee June, 2010 WECC Reliability Subcommittee Report.
Brett Wangen, Director of Engineering WECC RC Update to PCC Planning Coordination Committee Meeting October 24, 2013.
Marv Landauer Report to TSS on Annual Study Program Report Review Task Force April 2012 TSS Meeting Salt Lake City.
0 NERC PC Issues Update WECC PCC Meeting NERC PC Issues Update WECC PCC Meeting John Simpson, Reliant Energy Planning Coordination Committee Albuquerque,
SRWG Activity Report (as presented) March 21-23, 2012 TSS Meeting #160 WECC Offices Salt Lake City, Utah Mark Graham, SRWG Chair/David Franklin TSS.
Chair: Daniel Kuraspediani - BPA POWER WORLD USER’S WORK GROUP (PWUWG)
Presented to PGDTF February 11, 2015
1 MSRATF Update to TSS (Modeling SPS and RAS Ad Hoc Task Force) Activities August, 2014 Joe Seabrook Puget Sound Energy, Inc.
1 MSRATF Update to TSS (Modeling SPS and RAS Ad Hoc Task Force) Activities May, 2014 Joe Seabrook Puget Sound Energy, Inc.
SRWG Chair Report March 2015 WECC HQ
SRWG Update to TSS February 2015, Meeting 168 WECC HQ
Eleanor Ewry SRWG Study Program Subgroup Chair Annual Study Program Subgroup Update March 2015 WECC HQ.
Andy Meyers ISAS Chair ISAS Report WECC Operating Committees March 2015 Salt Lake City, UT.
1 TSP Nodal Engagement Market Participant Call ERCOT August 04, 2010.
Integration of Variable Generation Task Force Preliminary Conclusions and Actions.
Standards Subject to Enforcement Currently Or Standards Subject to Future Enforcement TSS Meeting #169 May 6-8, 2015 By: Lesley Kayser-Sprouse.
ISO Outlook Summer 2005 and Beyond Senate Energy, Utilities and Communications Committee February 22, 2005 Jim Detmers Vice President of Grid Operations.
1 Compliance Update May Control Performance Highlights  NERC CPS1 Performance Performance further declined in March  March performance comparison.
Transmission Outage Process April Purpose In compliance with the Protocols and the Electric Reliability Council of Texas (ERCOT) Operating Guides,
Tracy Rolstad TSS Chair TSS Chair Report March 2014 Salt Lake City, UT 1.
George Zhou, VGITF Chair October 14, 2015 Salt Lake City, Utah Variable Generation Interconnection Task Force Update to PCC.
System Review Work Group Update John Gross, SRWG Chair Presented to TSS Jan. 22, 2016 W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
RiversidePublicUtilities.com Arts & Innovation RiversidePublicUtilities.com MOD GENERATOR TESTING REQUIREMENTS RESOURCE PLANNERS LeeAnne Uhler, Regulatory.
Steve Rueckert Director of Standards TPL Discussion – PCC Steering Committee March 25, 2014.
October 29, 2012 RARF Workshop 2 Introduction to ERCOT Modeling Process Jay Teixeira Manager, Model Administration.
WECC-0100 Scope, Content & Status Update Rikin Shah, PAC Orlando Ciniglio, IPC WECC TSS Meeting, Salt Lake City, UT January ,
Tracy Rolstad TSS Chair TSS Chair Report July 2014 Salt Lake City, UT 1.
Transition Plan Network Operations Model Change Requests 5/26/2010.
TEPPC Review Task Force January 11, Purpose Advise and make recommendations on Future potential future generation and load balance Adequacy of the.
Path Operator Implementation Task Force Vic Howell, Vice Chair Report to OC March 22, 2016.
System Review Work Group Update to TSS John Gross, SRWG Chair Presented to TSS May 17, 2016 W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Reliability Standard TPL Transmission System Planned Performance for Geomagnetic Disturbance Events September 28, 2016 TPL Standard Status.
WECC – NERC Standards Update
Western Electricity Coordinating Council
Planning Geomagnetic Disturbance Task Force (PGDTF) Update to the ROS
Philip Augustin TSS Chair
Path Operator Implementation Task Force
Eleanor Ewry Base Case Coordination Subgroup Chair
Western Electricity Coordinating Council
Phil O’Donnell, Manager Operations and Planning Audits
Jonathan young ColumbiaGrid
Workshop Session 1: Overview
2017 System Assessment Jonathan Young February 2017
Planning Coordinator Gap Update March 25, 2014
Workshop Session 1: Overview
Joe Seabrook Puget Sound Energy, Inc.
Jonathan Young SDWG Chair
Andrew Christensen, SRWG Chair
Phil O’Donnell, Manager Operations and Planning Audits
SRWG Chair Report March 2015 WECC HQ
Donald Davies Chief Senior Engineer
Tracy Rolstad TSS Chair
WECC – NERC Standards Update
Andrew Christensen, SRWG Chair
System Review Work Group Update to TSS
System Review Work Group Update to TSS
Generator Operator Work Group (GOWG)
Joe Seabrook Puget Sound Energy, Inc.
Power World User’s Work Group (PWUWG)
Presentation transcript:

Tracy Rolstad TSS Chair TSS Chair Report October 2014 Salt Lake City, UT 1

Overview Approval Items – Data Preparation Manual TSS Activities – Includes MSRATF activities JUG MVWG Activities SRWG Activities – 2015 Base Case Schedule – DPM Changes October 20142

TSS ACTIVITIES (unchanged) CIP , MOD-032-1, TPL , TPL-007 Response to 08 Sept 2011 AZ to CA Outage – Relays, DPM Changes, WECC RAS/Ctg Definition BCCS – Base Cases created by BCCS in – Training provided in 2013 and available in 2014 Certification/de-certification Process of Study Software – Following MSRATF software requirement development…will assign to JUG October 20143

TSS: Path Ratings/Projects Coordination Mostly quiet except for SONGS removal (13 Oct) October 20144

TSS: Response to AZ to CA Outage Sharing of Contingencies and RAS files – Began in 2013, TSS to ask for this again this fall WECC RAS/Contingency Format/File – Software vendor to assist WECC in creating these for 2015 base cases (start in 2015) Sole sourcing this…workshops starting in 2015 – Outcome will be a WECC wide RAS/Ctg file that functioned for each WECC published base case. Distributed with each case October 20145

TSS: Joint Users Group Assumes all MSRATF duties fall of 2014 – Disestablishing MSRATF Jan 2015 – JUG is the open and transparent forum for directing software changes and allocating WECC funds for study software development New or changing standards require JUG be PROACTIVE – Work within TSS framework to meet requirements of standards October 20146

TSS:CIP-014 Guidance Fast moving physical security standard – Metcalf attack precipitated this Guidance developed by TSS work group – Spells out studies needed to get off list – Requires detailed work to PROVE that loss of station is tolerable Partnership with Peak Reliability – They have controlling editorial rights October 20147

TSS: CIP-014 Example Exposure Columbia Grid footprint October 20148

TSS: GMD Data and Study October 20149

SRWG ACTIVITIES 2014 Base Cases – Attempted to develop jointly with BCCS and without BCCS work in progress (2015 success date?) Data Preparation Manual – Approval for 2 flavors (present/BCCS) MOD (Short circuit discussion) Location Data (for GMD Studies) October

SRWG Logs Rep Log – Shows steady improvement until we reset it with new data checks This is an on going trend Recall that “Performance Log” has gone away – Morphed into a listing of study results listed in Annual Study Program report. October

SRWG: 2015 Base Case Schedule Operating base cases Heavy Winter Light Winter 2016 Heavy Spring 2016 Heavy Summer 2016 Light Summer October Five year base cases 2021 Heavy Summer Heavy Winter Ten year base cases Heavy Winter 2026 Heavy Summer

October

SRWG: Short Circuit Data MOD-032 asks for short circuit data – TSS Chair letter to be sent out requesting this data for 2015 data year – Asking simply for what you presently have October

October MOD : R1. Each Planning Coordinator and each of its Transmission Planners shall jointly develop steady-state, dynamics, and short circuit modeling data requirements and reporting procedures for the Planning Coordinator’s planning area that include: 1.1. The data listed in Attachment Specifications of the following items consistent with procedures for building the Interconnection-wide case(s): Data format; Level of detail to which equipment shall be modeled; Case types or scenarios to be modeled; and A schedule for submission of data at least once every 13 calendar months Specifications for distribution or posting of the data requirements and reporting procedures so that they are available to those entities responsible for providing the data. MOD : R4. Each Planning Coordinator shall make available models for its planning area reflecting data provided to it under Requirement R2 to the Electric Reliability Organization (ERO) or its designee to support creation of the Interconnection-wide case(s) that includes the Planning Coordinator’s planning area

October

October

SRWG: Nuances of MOD Nuances – “…steady-state, dynamics, and short circuit modeling data requirements...” – “…for building the Interconnection-wide case(s)…” – “Data must be shareable on an interconnection- wide basis to support use in the Interconnection- wide cases.” Practically speaking this suggests WECC map short circuit data to power flow cases to some extent. October

MVWG ACTIVITIES – Continued work on Composite Load Model Open Question: Are we there yet? – Updates to the Approved Dynamics Model List 2 generation wind, 1 st generation PV – Approved WECC Modeling Guidelines for PV and Wind – White Paper on Transient Voltage Performance Kosterev and Undrill October

TSS Report Summary 2014/2015: – BCCS – Composite Load Model, phase 1 – Relays, Ctg & RAS Definition – Short Circuit Data submission to WECC – MSRATF disestablishment in 2014 Physical Security and GIC Data and Study Needs Looking for WECC to perform GMD studies October

Questions/Suggestions/Comments October