CWB Tunnel (North Point Section) and IEC Link HY/2009/19 Presentation on: Date: Presented by: Presentation on: 17 April 2015 Chun Wo-CRGL-MBEC Joint Venture.

Slides:



Advertisements
Similar presentations
Soil Exploration Part II
Advertisements

Personal Mobility Lift Capstone Team Members: Jim Folgate Bill Beers Ryan Pelton David Zuercher.
 Soil compaction :  Compaction is the reduction in voids content due to air being forced out of the soil or dissolved in the soil water by mechanical.
Environmental Drilling By: Josh Humphreys October 8,2006.
8. Axial Capacity of Single Piles
Model RJ-3 System Package We offer a Res-Q-Jack™ Model RJ-3 3-point stabilization package system which includes: Qty. of (1) Jack Stand Kit with pins,
Chp12- Footings.
ENGINEERING MATERIAL PROPERTIES (CE1303)
Explosive joining of dissimilar metals: experiment and numerical modeling Anan’ev S.Yu., Andreev A.V., Deribas A.A., Yankovskiy B.D. Joint Institute for.
LAYCO EQUIPMENT BY YARGUS MANUFACTURING
SOFT SOIL (PROBLEMS & STABILISATION METHOD) Session 2 - 7
Main Functions of Buildings 4 Provide a safe and comfortable environment for work and rest. (Protect us from wind, rain and the wild animals) 4 Two types.
Safety : Cranes Introduction to Industrial Technology Spring 2014 Mr. Shubert 1.
Innovative Safety Initiative Award 2013 Jointly Organized by DEVB, CIC and HKCA CHUN WO-CRGL-MBEC JOINT VENTURE Contract No. HY/2009/19 Central- Wan Chai.
Foundations. Foundation supports weight of structure –Includes soil and rock under foundation –Building construction described by foundation type Slab.
Simple Machines.
CM 197 Mechanics of Materials Chap 20: Connections
Senior Design: Validation of Design December 15, 2008.
PILE FOUNDATION BY-.
Lecture 11 Advance Design of RC Structure Retaining walls
Soil and Rock Sampling. Environmental Site Characterization Number of samples taken depends on the size of the site Hollow stem auger normally used for.
SEMBODAI RUKMANI VARATHARAJAN ENGINEERING COLLEGE DEPARTMENT OF CIVIL ENGINEERING FOUNDATION ENGINEERING BY KARTHIVELU.
Submitted by Waris jamal Praveen kumar gautam Shiv pratap singh Ramashwar kumar singh Under the guidence of Prof.safiulla khan.
WASTES TRANSFER AND TRANSPORT.  Facilities and appurtenances used to effect the transfer of waste from the one location to other, usually more distance,
Lecture 6 Loading and Hauling
DSI – Ductile Iron Micropiles International Society for Micropiles London, May 2009 Florian Stützel, DSI-TS.
CONSTRUCTION TECHNOLOGY & maintenance
Details of Construction Lecture-2 “Shallow Foundation”
1 Kh Training April Gudiance on the selection of Kh Soil Soil to Rock Rock Soil Soil to Rock Rock.
Lifting Operations & Lifting Equipment. LOLER 98  Lifting Equipment must be of adequate strength & stability, as must the load itself  Lifting equipment.
1. 2 Civil Engineering Practice Introduction Instructor: Dr. Attaullah Shah Lecture # 1 Department of Civil Engineering Swedish College of Engineering.
BEARING CAPACITY OF SOIL Session 3 – 4
Bulb Piles –Franki Piles or pressure injected footings –Special form of cast in place pile with an enlarged base for increased load bearing F 10-4 Minipiles,
IEC COLLEGE OF ENGINEERING AND TECHNOLOGY
Procedure for erection and use of mobile tower scaffolds (Revision 1 – 5 th April 2011) Toolbox talk.
Complete Storage System Provider Racking system Shelving system Ou Efos Resources No Kompleks Sri Sungai Nibong Jalan Sultan Azlan Shah
ME 4182 Mid-Term Presentation The Likus Group 6/21/00 Philip Reale, Group Leader Matt Berrell Justin Disney Anthony Godfrey Gwyneth Smith Lisa Smith The.
SOIL MECHANICS AND FOUNDATION ENGINEERING-II (CE 311)
FOUNDATIONS.
WELCOME.
Soil mechanics and foundation engineering-III (CE-434)
Prepared by:- Barham Jalal
Final Concept Lead Filter Movement System Dennis Haasler EN-MEF-EBE.
PILING TECHNIQUES.
Building Foundations.
Site Investigation and Field Tests
BRIDGES, TUNNELS AND UNDERPASSES
The Engineering of Foundations
Hire Different Varieties of Lifting Gear in UK
Mechanical Weighbridge
DARSHAN INSTITUTE OF ENGINEERING & TECHNOLOGY
Lorry Loader and Small Hydraulic Cranes Operator Skills
{Graduation Project} An-Najah National University
Aspek Geoteknik.
California Bearing Ratio Test
Reinforced earth structures
Under Vehicle Surveillance System
Aspek Geoteknik.
MATERIALS AND CONSTRUCTION I
Connect With Rosava Engineering Group Web- Mobile , ,
CONSTRUCTION METHODS & TECHNOLOGY
PIPE LIFTING KIT HAMMER MULETRAX 2300 C
CONSTRUCTION METHODS & TECHNOLOGY
Lifting Operations on Construction Sites
Pavement materials: Soil
DSI – Ductile Iron Micropiles
Graduation Project Bracing system for deep excavation.
SCITEQ End closure series
Presentation transcript:

CWB Tunnel (North Point Section) and IEC Link HY/2009/19 Presentation on: Date: Presented by: Presentation on: 17 April 2015 Chun Wo-CRGL-MBEC Joint Venture Title: Firm Ground Testing Device - Chun Wo Probe Category: Safety Operational Device (Ref No.: C3-007)

CWB Tunnel (North Point Section) and IEC Link HY/2009/19 Slide 2 1. Introduction In view of frequency of crane lorry and mobile crane incidents due to unstable ground conditions in the construction industry. In this project, there are a lot of heavy lifting operation for bridge works. “Chun Wo Probe” was developed as an easy and fast track field test for font line staff to check ground condition. It is efficient to use. It is light, portable and assembly easily instead of heavy testing machine, so that it can be moved to whole of site by man power.

CWB Tunnel (North Point Section) and IEC Link HY/2009/19 Slide 3 2. Chun Wo Probe Concept Different soil conditions over the site Normally, the soil condition is identified by font line staff’s experience. And there is no quick and standard tests to check the soil conditions. Soil properties, such as friction angle, cohesion indicated the soil strength. In those parameters, bearing capacity and relative density are usually used to indicated the soil strength. Plate load test and Standard Penetration Test (SPT) are common tests to determine the bearing capacity and density of soil. However, they required heavy machines. They are not convenient and restricted by site conditions. Soft GroundCompacted Ground Non-compacted Ground Muddy Ground

CWB Tunnel (North Point Section) and IEC Link HY/2009/19 Slide 4 2. Chun Wo Probe Concept “Chun Wo Probe” was modified from SPT to have a light, portable and easy assembly equipment to check the soil density by the font line staff. This testing combines theoretical and practical knowledge. 1.It involves driving a probe made of stainless steel rod, into the ground from a slide hammer with standard weight and falling distance. 2.The probe is driven 300 mm into the ground and then the number of blows needed for the probe to penetrate 300 mm is recorded.

CWB Tunnel (North Point Section) and IEC Link HY/2009/19 Slide 5 3. Development Process Initial Product – modified from A Frame. The design direction is good but not function in practical. “Chun Wo Probe” was optimized by adding pulley and hammer. The probe was modified to minimized the size and weight to be portable. However, the probe used much man power and was not efficient.

CWB Tunnel (North Point Section) and IEC Link HY/2009/19 Slide 6 3. Development Process The final product: 1.“Chun Wo Probe” was made of stainless steel. It allows to be stored at bad condition, such as near sea side. 2.The probe was connected by bolts joints, the assembly will be easier and duration will be minimized. 3.The winch was added instead of the man power to increase the efficiency. Winch Stainless steel material Bolts joints connection Probe Hammer

CWB Tunnel (North Point Section) and IEC Link HY/2009/19 Slide 7 3. Development Process Video for Assembly Fast assembly - All the connections of “Chun Wo Probe” are made by bolt joints. The assembly duration is only 10 mins.

CWB Tunnel (North Point Section) and IEC Link HY/2009/19 Slide 8 3. Development Process Video for Operation

CWB Tunnel (North Point Section) and IEC Link HY/2009/19 Slide 9 4. Test Location and Results Test Location Test1 Test2 Test3 common quick backfill/ compact method on site Haul Road, heavy vehicles pass thought for 2 years Haul Road, heavy vehicles pass thought for 2 years & 400kPa plate load test passed

CWB Tunnel (North Point Section) and IEC Link HY/2009/19 Slide Test Location and Results Testlocation Test4 Test5 Test6 400kPA plate load test (Passed) 250kPA plate load test (Passed) Not compacted

CWB Tunnel (North Point Section) and IEC Link HY/2009/19 Slide Test Location and Results The number of blows and displacement of the 6 tests were recorded and summarized as above table. The data was developed as a graphical method for font line staff to use.

CWB Tunnel (North Point Section) and IEC Link HY/2009/19 Slide Graphical method of “Chun Wo Probe” Red zone representing the soil is not suitable for lifting operation Yellow zone representing the soil is suitable for light lifting, such as crane lorry. Green zone representing the soil is suitable for heavy lifting, such as 300T mobile crane. This graph showing the soil strength for lifting operations classified by different range of colour. Blue zone representing the soil is suitable for heavy lifting, such as 100T mobile crane.

CWB Tunnel (North Point Section) and IEC Link HY/2009/19 Slide 13 Thank You