TS2-SPS & TS1-LHC. TS2-SPS (On Monday 15th of June for 24hrs) SPS – HW: Replacement of HV Switch PFN 7 MKP (Impact 65420) SW: « Smooth » upgrade in accordance.

Slides:



Advertisements
Similar presentations
“LHC Controls for Sector Test” Planning SPS Extraction Kicker and Septa LHC Injection Kicker and other equipment (beam stoppers, dumps,...) Etienne CARLIER.
Advertisements

Page 1 Jan Uythoven AB/BT, LBDS meeting 18 May 2004 Apertures LSS6 l Position MKQA l Vacuum chamber between Q4 and TCDS.
1 Commissioning ABT Equipment in the LHC Jan Uythoven ABT TCM 13/01/2015.
8:16 SB 25ns dumped by RF; integrated lumi 0.6 nb-1. 9:14 BIC problem in TI8 and CMS recovering their tracker 10:09 Abort gap cleaning commissioning. 16:29.
Beam commissioning strategy Global machine checkout Essential 450 GeV commissioning System/beam commissioning Machine protection commissioning.
LHC Beam Dumping system
1 MKBH Erratic Jan Uythoven On behalf of the ABT team (Viliam, Nicolas M., Etienne, Laurent, Francesco etc…..) MPP meeting 8/5/2015.
Muon analysis – PS and SPS data Started May 21, 2012.
LBDS commissioning – MKD tests Viliam Senaj, 11/12/2013.
LHC 30 th and 31 st July :10 Finish scrubbing fill 25 ns trains by operator dump. –No XPOC data … 08:40 Inject for another scrubbing fill 09:09.
GEM Electronic System Status New releases of electronic boards: ◦ MPD v 4.0 ◦ Backplane 5 slot short (for UVa design) ◦ APV Front-End with Panasonic connector.
LHC Beam Dump System Technical Audit Trigger Synchronisation Unit.
Prepared by R.A.Barlow (May 2014) TE-ABT-EC Maintenance methods and policy Edms nb. TE-ABT-EC Maintenance methods and policy in EC section.
V. Kain, G.H. Hemelsoet AB/OP1Nov 08, 2007 LHC Injection System V.Kain, G.H. Hemelsoet, AB/OP Input from: E. Carlier, B. Goddard, J. Wenninger What do.
1 LBDS Testing Before Operation Jan Uythoven (AB/BT) Based on the work of many people in the KSL, EC and TL sections.
R.Giachino / M.Albert Be/op 12 th March 2012 LHC Machine check out 1v1.
MKI Erratics: Hardware and Electronics Related Aspects M.J. Barnes Acknowledgements: A.Antoine, R.A. Barlow, P. Burkel, E. Carlier, N. Magnin, V. Mertens.
Summary of Week 30 G. Arduini, J. Wenninger Main aims: “Adiabatically” increase peak luminosity by emittance reduction Luminosity production.
What will we do for Beam Preparation: Injection and Beam Dump Jan Uythoven Thanks to M.Barnes, E.Carlier, L.Ducimetière, B.Goddard, R.Jones, Y.Kadi, V.Kain,
ABT Consolidation Review Electronics & Controls Etienne Carlier
Progress report Collaboration meeting 23-SEP-2009
1 Beam Dumping System MPP review 12/06/2015 Jan Uythoven for the ABT team.
MKD Reliability run Viliam Senaj TCM meeting 18/11/2014.
W. Hofle LIU-SPS Meeting SPS BA2 Damper LS1 Progress and plans reported by W. Hofle LIU-SPS Meeting G. Kotzian T. Levens D. Valuch.
Friday morning Dump fill due to the trip of the RQF.A78  intervention had been just planned for the morning on the circuit Access, interventions:  RQF.A56/78,
BP & RS: BIS & SLP for AB/CO Review, 23 h Sept Realisation of the interlocking between SPS, LHC and CNGS and open issues Beam Interlock Systems.
Status of ABT beam tests preparation 9-Oct-14. Preparation of sector test without beam I MKI: – Open valves, conditioning to 55 kV, softstart – Check.
Outline:  Hw status (on the basis of last LED data);  Plans / requests; ECAL: status and plans.
00:15: Stable beams fill 1883, 1.1E33 cm-2s-1.  Seems the 144 bunches beam 1 doe not fit properly on the injection kicker waveform. Systematically the.
LMC 27 November 2013 Status of LBDS LS1 activities and plans for 2014 reliability run Jan Uythoven for the many, many people working on the mentioned equipment.
LHC Beam Dumping System Experience from reliability run and Re-commissioning procedures MPP Nicolas Magnin – TE/ABT/EC.
Scrubbing Run: TDI, MKI and MKE interlocks Chiara Bracco, Jan Uythoven ABT/BTP Acknowledgments: T. Baer, M. Barnes, E. Carlier.
1 ABTEF - 16/05/2014 Maintenance of safety-critical systems : LBDS - MKD / MKB on LHC.
YETS LHC 2015/16 - ABT Group TCM Francesco castronuovo.
Atomic Energy Quiz Tuesday, April 28, Unit 10: Atomic Physics Tuesday, 4/28  Take out your Atomic Physics notes and put your phones away. Upcoming.
Magnetism Friday, April 17, Unit 10: Magnetism Monday, 4/20  Respond to the following:  Compare motors, generators and transformers to each other.
Overview Extraction tests: TT40 and TT60, week 21 –controls and data, interlocking, extraction, MKE6 transfer function and energy tracking, high intensity,
June 27th, 2005AB/CO/HT - Review of Activities for PS-SPS 2006 Startup SPS RF FARADAY CAGE Purpose, Scope and deliverables Javier Serrano.
YETS status report TCM Francesco castronuovo.
Last night Lhc closed 15:00 Beam on Ti 8 /Ti2 Prepulse check synchronisation ok with LHCb /RF 17:00 Open Point 4 PC’s and RF 19:00 LBDS energy tracking.
YETS status report TCM Francesco castronuovo.
LHC progress Tuesday 28 th April 2015 Coordination: Mike Lamont, Wolfgang Hofle.
AB/CO - TC – Cl.Deh. HT section 1 Lessons from Point 8 HW installation Better idea of Where, When and … What ! Periodic meeting (every 2 weeks)
AC-Dipole Upgrades LHC Optics Measurement and Corrections review June CERN N. Magnin – TE/ABT/EC Thanks to E.Carlier, R.A.Barlow, J.Uythoven.
Status of the AWAKE Control System Edda Gschwendtner, Janet Schmidt, Marine Gourber-Pace, Roman Gorbonosov, Peter Sherwood AWAKE Technical Board, 27 January.
1 Chapter No. 17 Radiation Detection and Measurements, Glenn T. Knoll, Third edition (2000), John Willey. Measurement of Timing Properties.
The way to fast and "loss-free" SPS kickers E. Gaxiola With contributions from AB-BT-KSL section and F. Caspers, T. Kroyer, M. Timmins, J. Uythoven.
Preparation for TS3 Mariana Rihl. Known issues Implications on light leaks on all modules – Visible on current feedback of bias – Confirmed by study performed.
E. Hatziangeli – LHC Beam Commissioning meeting - 3 rd March 2009.
LHC schedule status K. Foraz EN-MEF 12/04/2013LSC - K. Foraz1.
Emergency dump update 2. M. Solfaroli – 23/10/2015 Goal 2 GENERAL STRATEGY Force open the BIS loop Generate an internal fault in the LBDS Scrape the beam.
PSB HW Commissioning Meeting 8 February 2016 A. Akroh, B. Mikulec.
ABT-EC EYETS Activities 2nd reports
TS2 preparatory meeting
LHC-RF activities in LHC PT 4 TS2 YETS LS2
LHC Beam Dumping System Reliability Run Summary
MKD/MKB Review Meeting Scope and Definition
TE/EPC activities for LINAC 2, PSB, PS & TT2 during EYETS
AC Inlet & AC Input Filter
LHC Risk Review: Kicker Magnet Reliability
Overview of LBDS related tasks
Tuesday Fill lost #1855 at 7:28 due to the trip of RQX.R1. This was traced to a software bug in the FGC… The Class 51 (LHC_PC) FGC software has been upgraded.
Impedance working group update
Dry Run 0 Week 13: BI test of...everything circulating beam: all fixed displays and BI applications OP directories for 2009, concentrators running Need.
Wednesday 09 March …:09:00: beta* measurement (1.5 m) by K-modulation and with AC-dipole excitation. 1/17/2019 LHC 8:30 meeting.
New page for summary of test status
Acknowledgements: Alain Antoine, Nicolas Magnin & Volker Mertens
KFA10 status 20/05/2019 Currently:
AC-Dipole Limitations and Options for its Upgrade
KFA10 status 03/06/2019 Currently:
Presentation transcript:

TS2-SPS & TS1-LHC

TS2-SPS (On Monday 15th of June for 24hrs) SPS – HW: Replacement of HV Switch PFN 7 MKP (Impact 65420) SW: « Smooth » upgrade in accordance with BE/CO

TS1-LHC Week 25, 5 days LHC – SW: FESA Software release in accordance with BE/CO – MKI Point 2 and Point 8 No request of consignation from the coordination (to confirm) Improvement of the rise time : – Adjustement front cell on PFN 2d/point (Impact & 64461) Replacement FIB AGK 0.5 d/point (Impact to launch) Update class LhcMKIstate with TDR measurements Update BETS TDI table 3

TS1-LHC Week 25, 5 days LHC Point 4 MKQA – Checking the tightening of the capa bank on AC dip Generator (Impact to launch) LHC point 6 LIU-TCDI – Floor Levelling - Impact – Check BEC 4

TS1-LHC Week 25, 5 days LHC – LBDS Point 6 – Consignation for EN: From On monday up to Wednesday morning – Inspection inside of some MKD generators HV (Impact 65125) – Cleaning up MKB generators H and may be V (Impact 65125) – Pre-tests (Planning ? Impact to launch) – Noise measurement on IPCO1 at low energy pulsed (Impact to launch) – Cleaning of cabling in GP rack (Impact to launch) – Check UPS powering in UA 63 and ABDT signal on TSU-A in UA67 – Put into place of 2 racks in the storage area for electronic spares storage 5