21–1. 21–2 Chapter Twenty-One Copyright © 2014 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.

Slides:



Advertisements
Similar presentations
Inventory Systems for Dependent Demand
Advertisements

Material Requirements Planning
To Accompany Ritzman & Krajewski Foundations of Operations Management, © 2003 Prentice Hall, Inc. All rights reserved. Chapter 15 Resource Planning.
Principles of Operations Management
Material Requirements Planning (MRP)
CHAPTER MRP and ERP Operations Management, Eighth Edition, by William J. Stevenson Copyright © 2005 by The McGraw-Hill Companies, Inc. All rights.
Material Requirements Planning (MRP)
© The McGraw-Hill Companies, Inc., Chapter 15 Materials Requirements Planning.
CHAPTER 7 Managing Inventories
MRP, MRP II, and ERP.
Material Requirements Planning
Chair Seat Legs (2) Cross bar Side Rails (2) Cross bar Back Supports (3) Leg Assembly Back Assembly Level Product Structure Tree.
Copyright © 2014 McGraw-Hill Higher Education. All rights reserved. CHAPTER 14 Materials and Resource Requirements Planning McGraw-Hill/Irwin.
1 1 Slide © 2001 South-Western College Publishing/Thomson Learning Anderson Sweeney Williams Anderson Sweeney Williams Slides Prepared by JOHN LOUCKS QUANTITATIVE.
© 2004 by Prentice Hall, Inc. Upper Saddle River, N.J Operations Management Material Requirements Planning (MRP) & ERP Chapter 14.
Aggregate Planning and Resource Planning Chapters 13 and 14.
Operations Management
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 14 MRP and ERP.
1 Example: MRP Schedule LocoMopeds is a manufacturer of off-road mopeds. The following product structure diagram represents the bill of materials for.
Materials Requirements Planning
1-1 McGraw-Hill/Irwin ©2009 The McGraw-Hill Companies, All Rights Reserved 1 Chapter 18 Materials Requirements Planning.
Operations Management Material Requirements Planning
1 Slides used in class may be different from slides in student pack Chapter 16 Materials Requirements Planning  Material Requirements Planning (MRP) 
Resource Requirements Planning:
Chapter 16 Inventory Systems for Dependent Demand
To Accompany Krajewski & Ritzman Operations Management: Strategy and Analysis, Seventh Edition © 2004 Prentice Hall, Inc. All rights reserved. Chapter.
Material Requirements Planning
0 Production and Operations Management Norman Gaither Greg Frazier Slides Prepared by John Loucks  1999 South-Western College Publishing.
Chapter 15 MRP and ERP.
1 Materials Requirements Planning. 2 Material Requirements Planning Defined Materials requirements planning (MRP) is a means for determining the number.
Irwin/McGraw-Hill © The McGraw-Hill Companies, Inc., 1998 Material Requirements Planning (MRP) Chapter 15 11/7/05 Overview Position of MRP in Operation.
MRP and ERP McGraw-Hill/Irwin Copyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved.
1 Operations Management MRP Lecture 22 (Chapter 14)
Hierarchy of Production Decisions
13-1MRP and ERP William J. Stevenson Operations Management 8 th edition.
To Accompany Ritzman & Krajewski Foundations of Operations Management, © 2003 Prentice Hall, Inc. All rights reserved. Chapter 12 Resource Planning.
McGraw-Hill/Irwin Copyright © 2009 by The McGraw-Hill Companies, Inc. All Rights Reserved. MRP (Material Requirement Planning) (Method under Dependent.
© The McGraw-Hill Companies, Inc., Master scheduling Material requirements planning Order scheduling Weekly workforce and customer scheduling Daily.
Materials and Resource Requirements Planning CHAPTER FIFTEEN McGraw-Hill/Irwin Copyright © 2011 by the McGraw-Hill Companies, Inc. All rights reserved.
MRP and ERP McGraw-Hill/Irwin Copyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved.
McGraw-Hill/Irwin Copyright © 2011 The McGraw-Hill Companies, All Rights Reserved Chapter 18 Material Requirements Planning.
Aggregate Planning and Resource Planning Chapters 13 and 14.
Material Requirements Planning. Materials requirements planning (MRP) is a means for determining the number of parts, components, and materials needed.
© The McGraw-Hill Companies, Inc., Chapter 15 Materials Requirements Planning.
To Accompany Krajewski & Ritzman Operations Management: Strategy and Analysis, Seventh Edition © 2004 Prentice Hall, Inc. All rights reserved. Resource.
13-1MRP and ERP William J. Stevenson Operations Management 8 th edition.
Resource Planning Chapter 15.
Materials Requirements Planning
Operations Fall 2015 Bruce Duggan Providence University College.
Manufacturing Systems Engineering
© The McGraw-Hill Companies, Inc., Chapter 15 Materials Requirements Planning.
BUAD306 MRP.
11-1  Material requirements planning (MRP): Computer-based information system that translates master schedule requirements for end items into time-phased.
Dr. S. S. Bhakar Director, PIMG. ‘‘ I often feel like the director of a cemetery. I have a lot of people under me. But nobody listens! ’’ - General John.
Chapter 12: Learning Objectives Instructor Slides You should be able to: 1.Describe the conditions under which MRP is most appropriate 2.Describe the inputs,
15-1 McGraw-Hill/Irwin Operations Management, Seventh Edition, by William J. Stevenson Copyright © 2002 by The McGraw-Hill Companies, Inc. All rights reserved.
1 © 2006 The McGraw-Hill Companies, Inc., All Rights Reserved Chapter 16 Materials Requirements Planning.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 10 MRP and ERP.
MRP and ERP McGraw-Hill/Irwin Copyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved.
Reid & Sanders, Operations Management © Wiley 2002 Material Requirements Planning 15 C H A P T E R.
MATERIAL Requirements planning MRP
Materials Requirements Planning
Lecture 34 MRP and ERP Operations Management, Eighth Edition, by William J. Stevenson Copyright © 2005 by The McGraw-Hill Companies, Inc. All rights reserved.
BUAD306 MRP/ERP.
McGraw-Hill/Irwin Copyright © 2009 by The McGraw-Hill Companies, Inc. All rights reserved.
Chapter 16 Materials Requirements Planning
MATERIAL Requirements planning MRP
MRP Introduction EXAMPLES
Resource Planning Chapter 16
Material Requirements Planning and Enterprise Resource Planning.
Presentation transcript:

21–1

21–2 Chapter Twenty-One Copyright © 2014 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin

21–3 Copyright © 2014 by McGraw Hill Education (India) Private Limited. All rights reserved. LO21–1: Explain what material requirements planning (MRP) is. LO21–2: Understand how the MRP system is structured. LO21–3: Analyze an MRP problem. LO21–4: Evaluate and compare MRP lot- sizing techniques.

21–4 Copyright © 2014 by McGraw Hill Education (India) Private Limited. All rights reserved. ERP – a computer system that integrates application programs in accounting, sales, manufacturing, and the other functions in a firm MRP – a means for determining the number of parts, components, and materials needed to produce a product

21–5 Copyright © 2014 by McGraw Hill Education (India) Private Limited. All rights reserved. The logic that ties production functions together from a material planning and control view A logical, easily understood approach to the problem of managing the parts, components, and materials needed to produce end items – How much of each part to obtain? – When to order or produce the parts? Dependent demand drives the MPR system

21–6 Copyright © 2014 by McGraw Hill Education (India) Private Limited. All rights reserved.

21–7 Copyright © 2014 by McGraw Hill Education (India) Private Limited. All rights reserved. The master schedule deals with end items and is a major input to the MRP process. All production systems have limited capacity and limited resources. – The aggregate plan provides the general range of operation; the master scheduler must specify exactly what is to be produced. To determine an acceptable feasible schedule to be released to the shop, trial master production schedules are tested using the MRP program.

21–8 Copyright © 2014 by McGraw Hill Education (India) Private Limited. All rights reserved. Week Aggregate plan shows overall quantities to produce – without specifying type. MPS shows quantities of each type, with information about the production time frame.

21–9 Copyright © 2014 by McGraw Hill Education (India) Private Limited. All rights reserved.

21–10 Copyright © 2014 by McGraw Hill Education (India) Private Limited. All rights reserved. MRP system inputs MRP system outputs

21–11 Copyright © 2014 by McGraw Hill Education (India) Private Limited. All rights reserved. Customers – specific orders placed by either external or internal customers Aggregate production plan – the firm’s strategy for meeting demand in the future, implemented through the master production schedule (MPS)

21–12 Copyright © 2014 by McGraw Hill Education (India) Private Limited. All rights reserved. Contains the complete product description, listing the materials, parts, and components along with the sequence in which the product is created. Often called the product structure file or product tree because it shows how a product is put together. Modular bill of materials is a buildable item that can be produced and stocked as a subassembly. Super bill of materials includes items with fractional options. The BOM shows how the product is put together.

21–13 Copyright © 2014 by McGraw Hill Education (India) Private Limited. All rights reserved. Product A – the end item Product A consists of 2 B and 3 C Product C consists of 2 F, 5 G, and 4 H Product B consists of 1 D and 4 E

21–14 Copyright © 2014 by McGraw Hill Education (India) Private Limited. All rights reserved.

21–15 Copyright © 2014 by McGraw Hill Education (India) Private Limited. All rights reserved. Higher levels (Iower numbers) refer to end products. Lower levels (higher numbers) refer to components and raw materials.

21–16 Copyright © 2014 by McGraw Hill Education (India) Private Limited. All rights reserved. Information about part availability Additional information that may be useful Basic information describing the item

21–17 Copyright © 2014 by McGraw Hill Education (India) Private Limited. All rights reserved. The requirements for end items are retrieved from the master schedule. These are referred to as “gross requirements” by the MRP program. On-hand balance and schedule of orders are used to calculate the “net requirement.” Net requirements data are used to calculate when orders should be received to meet these requirements. Planned order releases are generated by offsetting to allow for lead time.

21–18 Copyright © 2014 by McGraw Hill Education (India) Private Limited. All rights reserved. Move to level 1 items. Gross requirements for each level 1 item are calculated from the planned-order release schedule for the parents of each level 1 item. Net requirements, planned-order receipts, and planned-order releases are calculated as described in steps 2–4. Repeat for all items in bill of materials.

21–19 Copyright © 2014 by McGraw Hill Education (India) Private Limited. All rights reserved. Ampere, Inc., produces a line of electric meters installed in residential buildings. Meters are of two basic types for different voltage and amperage ranges. – Some subassemblies are sold separately for repair or for changeovers. The problem is to determine a production schedule to identify each item, the period it is needed, and the appropriate quantities. The schedule is then checked for feasibility, and the schedule is modified if necessary.

21–20 Copyright © 2014 by McGraw Hill Education (India) Private Limited. All rights reserved. Assume that required quantity must be available during week 1 of each month. Trial Master Schedule

21–21 Copyright © 2014 by McGraw Hill Education (India) Private Limited. All rights reserved.

21–22 Copyright © 2014 by McGraw Hill Education (India) Private Limited. All rights reserved.

21–23 Copyright © 2014 by McGraw Hill Education (India) Private Limited. All rights reserved.

21–24 Copyright © 2014 by McGraw Hill Education (India) Private Limited. All rights reserved. Without an order here, inventory will drop below the safety stock. To accommodate the lead time, orders must be released ahead of time.

21–25 Copyright © 2014 by McGraw Hill Education (India) Private Limited. All rights reserved. Without an order here, inventory will drop below the safety stock. To accommodate the lead time, orders must be released ahead of time.

21–26 Copyright © 2014 by McGraw Hill Education (India) Private Limited. All rights reserved. Total demand from planned order releases of parent items Planned order release offset by 3 periods due to lead time

21–27 Copyright © 2014 by McGraw Hill Education (India) Private Limited. All rights reserved. Determination of lot sizes in an MRP system is a complicated and difficult problem. Lot sizes – the part quantities issued in the planned order receipt and planned order release sections of an MRP schedule Lot-for-lot (L4L) Economic order quantity (EOQ) Least total cost (LTC) Least unit cost (LUC) Lot Sizing Strategies

21–28 Copyright © 2014 by McGraw Hill Education (India) Private Limited. All rights reserved. Sets planned orders to exactly match the net requirements. Produces exactly what is needed each week with none carried over into future periods. Minimizes carrying cost. Does not take into account setup costs or capacity limitations.

21–29 Copyright © 2014 by McGraw Hill Education (India) Private Limited. All rights reserved. Calculate reorder quantity based on EOQ. EOQ was not designed for a system with discrete time periods such as MRP. The lot sizes generated by EOQ do not always cover the entire number of periods.

21–30 Copyright © 2014 by McGraw Hill Education (India) Private Limited. All rights reserved. EOQ Lot- for- Lot

21–31 Copyright © 2014 by McGraw Hill Education (India) Private Limited. All rights reserved. Least total cost method (LTC) – a dynamic lot-sizing technique that calculates the order quantity by comparing the carrying cost and the setup costs for various lot sizes and then selects the lot in which these are most nearly equal Influenced by the length of the planning horizon

21–32 Copyright © 2014 by McGraw Hill Education (India) Private Limited. All rights reserved.

21–33 Copyright © 2014 by McGraw Hill Education (India) Private Limited. All rights reserved. Least unit cost method – a dynamic lot- sizing technique that adds ordering and inventory carrying cost for each trial lot size and divides by the number of units in each lot size, picking the lot size with the lowest unit cost

21–34 Copyright © 2014 by McGraw Hill Education (India) Private Limited. All rights reserved.