Pranahita – Chevella Project PHASE - II +175.00 20 KM 40 KM
PRANAHITA – CHEVELLA PROJECT PRANAHITHA IS A TRIBUTARY TO RIVER GODAVARI Yield from Pranahitha : 190 TMC Lift height : 65 Mts. (from +110 M to +175M) Length of the pipe line : 20 Km Gravity canal : 40 Km Total length from Pranahita lift point to : 60 Km Yellampally Utilisation : 160 TMC Ayacut : 12 Lakhs Acres Districts Benefited : Adilabad, Karimnagar, Medak, Nizamabad, Nalgonda, and RR Districts. Government issued order in G. O. Rt. No. 623, Dt 15-7-2005 for taking up the investigation and preparation of DPR for lifting of 160 TMC of water from Pranahitha to irrigate 12.00Lakh Acres
PRANAHITA – CHEVELLA PROJECT Name of Work: Preparation of DPR for diverting 160 TMC of water from Pranahitha river to Sripada Sagar Project and identify additional Ayacut of 12.00 lakhs Acres in Adilabad, Karimnagar, Nizamabad, Medak, Nalgonda and Ranga Reddy Districts including drinking water for enroute villages and industrial needs of Hyderabad. Tenders invited. 4 firms participated. Bids opened on 18-8-2005. Bids awarded to M/s WAPCOs