Guild Road Industrial Park Workshop. Guild Road Industrial Park Incubator Study identified a lack of market for a successful incubator in Woodland. Consultant.

Slides:



Advertisements
Similar presentations
Port of St Helens Formed in 1940 Five Commissioners – Robert Keyser Board President 9 full time & 3 temp employees - Patrick Trapp Exec Dir Working Budget:
Advertisements

Wakulla County Sewer Project Eutaw Utilities Presentation April 7, 2011.
Stanlick Sewer Treatment Plant Upgrade Implementation Date: September 1, 2008.
Floyd County Board of Commissioners Special Town Hall Meeting Topic: Update on status of Georgetown WWTP.
Taking the Mystery out of Economic Development Tools Chris Eng, Chisago County HRA-EDA.
New York State Economic Development. “The best place in the world to live, work, raise a family and grow a business”
Business Park Partnership Program. Prosperity 2021  Part of Strategy to  Encourage Job Creation  Encourage Development of Business Districts (Hargrove,
DRIs After 360. Transportation Methodology § (7) PREAPPLICATION PROCEDURES.— The levels of service required in the transportation methodology shall.
1 Purpose  Summarize Monday’s workshop  Update on the Radio System – confirm staff’s recommendation  Jail Expansion – discussion/direction  Discussion.
Utility Extension Project
SEA RAY BOATS, FLAGLER MARINE CENTER ECONOMIC DEVELOPMENT INCENTIVES.
Presents Project Crimson March 1, 2006 Sarah Grace Cade Harrelson Cochrane Jamison Libby Probst Justin Williams.
PNCWA Operators Conference Eastern Oregon Region AWWA/PNCWA Short School Water Project of the Year City of Arlington Mesa Industrial Park Water System.
Tracy Hatch Chief Financial Officer. Rochester Maintenance Facility & District HQ $16.1M request for Trunk Highway bonds Phase 2 will remodel 94,000 SF.
2015 Budget Workshop August (RCW 53.35).
City of West Linn Fiscal Year 2009 Budget Tuesday.
MARYLAND CDBG RURAL INFRASTRUCTURE FUNDING COLLABORATION.
 Net Student Revenues  2384 undergraduate students  Comprehensive Fee - $57,900  90% receive institutional aid –average aid $25,300.
City Land Based Customized Incentive Proposal City Centrum Economic Development Office City of Cape Coral, Florida March 21, 2011.
UF Research and Academic Center at Lake Nona Presentation to Florida Board of Governors, March 17, 2010 Dr. Win Phillips – Vice President for Research.
Mt. Lebanon Public Works Facility Master Planning March 11, 2014 Update.
Community Economic Revitalization Board & Public Works Board Funding local opportunities in Eastern Washington.
2012 Estimated Tippecanoe County Budgets Tippecanoe County Council October 4, 2011.
Incentives & Infrastructure  Estimated incentives and Infrastructure cost: $87,000,000  We will have a Development Agreement with Microsoft that will.
Montebello Unified School District CMAA Presentation April 17, 2014 Bond Program Update.
Welcome!. Strategic Development and Facility Master Planning Board Approved in October 2010 Hot Springs County Memorial Hospital.
City of Marshall Development Proposal to Action Manufacturing, Inc. November 26, 2013.
City of Marshall Development Proposal to Action Manufacturing, Inc. February 11, 2014.
Panhandle Area Council, Inc.(PAC) Non-profit Membership organization of local and tribal governments, private sector and industry representatives Structured.
Regional Recycling Solutions, LLC.   County purchased 103 acres in July of 1993 from Greene Land Company  Elchin Inc purchases 40 acres in April 1998.
ITTS Freight in the Southeast Conference Charlotte, North Carolina February 9, 2011.
1 1 City Commission Workshop for the DRAFT Basis of Design Report December 14, 2015 CRAVEN THOMPSON & ASSOCIATES, INC.
BUILD READY PROGRAM. Benefits of Build Ready Drastically Reduce Construction Time Companies can build sooner on Build Ready sites Reduces the amount of.
City of Marshall Development Proposal to Ralco Nutrition, Inc. August 7, 2012.
Storm Sewer Map Development Presented by: Kurt Whited.
Carver Park and Ride Carver County CDA request for assistance June 4, 2013 Workshop Carver County Board Workshop.
1 Temporary Construction Staging Area Licensing Agreement for Peabody Hotel April 1, 2008 Orange County Convention Center.
PORT OF TACOMA. Request authorization for the Executive Director to Award Purchase Orders for the purchase of hardware and software for the Blair-Hylebos.
Revolving Loan Fund Department of Toxic Substances Control Brownfields and Environmental Restoration Program Stewart W. Black Acting Deputy Director Brownfields.
FUNDING AVAILABILITY & SAFETY PROGRAMS 3//21/2013.
CITY OF PORT ARTHUR, TEXAS BUDGET WORKSHOP July 12, 2005.
Bluff-Residential Carver CornerDowntown HNI Campus.
Approval of January 15, 2013 Minutes Public Comments.
Downtown Stockton Marina & Joan Darrah Promenade July 29, 2008 Guaranteed Maximum Price for the Construction of the Downtown Marina and Joan Darrah Promenade.
Morelli Park Reconstruction and Expansion Project Public Hearing and Award of Construction Contract Stockton City Council and Stockton Redevelopment Agency.
MENTAL HEALTH CLINIC Siting Process and Analysis.
Economic Research Associates (ERA) Report February 17, 2004 Mark Lewis, City Manager.
Loan Programs.  What is the PFA?  How does PFA financing work?  What is the Capital Financing Program?  What is the State Revolving Fund Program?
FY 2001 CDBG Budget $16,377,000 Administration 427,540
Financial Needs for Water and Wastewater Infrastructure (2015)
City of Rifle 2007: Potential Growth.
Eastham Water System Board of Selectmen Meeting February 1, 2016
Capital Financing Strategy
NC Division of Water Infrastructure Drinking Water Grant
Skillman Corridor TIF District
MULTI-PURPOSE DOCK GARY PAXTON INDUSTRIAL PARK | SITKA, ALASKA
FY 2012 Status Report on the North Mainland (Ormond Crossings CRA)
Kittridge Housing 100 Acre Sub-Division West San Fernando Valley
Valley & Third Streets Redevelopment
Scott Co. EDA Year-end Update December 21, 2011
Dana Heiberg, Senior Planner February 5, 2018
Margarita Area Specific plan
INDUSTRIAL / COMMERCIAL Facility For Lease
Work Session Follow UP Aug. 23, 2018.
Urban Renewal Authority
Recreation and Park Commission
OSPI Capital Budget School Facilities & Organization
St. Marys Intracoastal Gateway.
Stormwater Treatment Funding Matrix
North Pointe Baptist Church
Presentation transcript:

Guild Road Industrial Park Workshop

Guild Road Industrial Park Incubator Study identified a lack of market for a successful incubator in Woodland. Consultant identified a market need for 25,000-50,000 square foot industrial buildings. Guild Road design includes 3-5 buildings ranging from 25,000 or 45,000 square foot buildings.

Guild Road Industrial Park- Next Phase Land Use/ Master Planning Permit – Pre-application $16,500 – Permit Application Cost $118,250 – Final Construction Documents $47,500 – 10% $18,225 – Total Estimated Cost $200,475

Guild Road Industrial Park- Funding Options Funding options for Land Use/ Master Planning Permit – Cowlitz County.09 Rural Development Funds $1 million available- request of $50,000 due February/March – CERB Planning- request of $50,000 or 25% of the total project cost due April 6 – EDA funding- request of $100,000 due – Currently in Port budget from reserves for the total amount

Guild Road Industrial Park- Building Design Each building- the example shown is the Phase 1 23,000 square foot building- will include at grade docks Each building would have a design for an office space. The example provides a 2,000 square foot space. The building is a metal tilt up like the Down River Drive designs for five of the buildings. The example shown is estimated to cost $858,981 or $37.35 per square foot. A return on investment (ROI)for the building would be

Guild Road Industrial Park- Planning Level Cost Estimate Full Site Improvements is for all sites- $943,250 Site Improvements for Phase One Building $685,525 Site Improvements for Phase Two Building $298,000 Site Improvements for Final Phases depends on the building selection (3- 25k foot or 1-45k foot building)

Phase One Building Example 23,000 square feet

Guild Road Office Space Example

Guild Road Industrial Park- Total Costs Land Use/ Master Planning Permitting $200,475 Full Site Improvements $943,250 Building Costs Option 1: $3,473,481 Building Cost Option 2: $4,593,971 Total Option 1: $4,617,206 Total Option 2: $ 5,737,696

Guild Road Industrial Park- Total Cost Funding Options CERB Funding $ 300,000 grant + $1.7 million loan EDA Funding $1.5 million grant limit (for construction) Cowlitz County.09 Rural Development USDA Infrastructure Funding for telecommunications, storm water, sewer, etc.