The ISOLDE robots upgrade JL GRENARD EN-HE ISOLDE Workshop and Users meeting 15-12-2014.

Slides:



Advertisements
Similar presentations
COPYRIGHT SILCA SpA 2005 Silca is a member of the Kaba Group.
Advertisements

Best Practices for Remote Assembly and Maintenance Keith Kershaw, Sources, Targets and Interactions Group Thanks to: Alessandro Tesini and Jim Palmer of.
April Brian Marler. ◦ The targeted purpose of the UR5 is to make these robots VERY easy to use, install, and work around. ◦ Programming a robot.
The Experimental Hall Layout 2nd HIE-ISOLDE Physics Coordination Group Meeting 6 May, 2011 Hie-Isolde Erwin Siesling.
LHC Collimator Survey Train Concept / Development / Status Patrick Bestmann CERN BE/ABP/SU IWAA /09/2010 Remote Controlled Measurements in the LHC.
MEDICIS : status, plans, interlocks and coactivity with ISOLDE ISOLDE ISCC 13 February 2015 Stefano Marzari EN-STI-RBS.
TCC2-TDC2 working group Handling means for the TAX repairs JL GRENARD EN-HE 21th September 2011.
Team HazardHawk Team HazardHawk The HazardHawk Team HazardHawk 2008.
Palletizing the Easy Way
Collimation Remote Handling Highlights from work for collimation remote handling and remote survey. Plans Keith Kershaw EN-HE 14 June 2011.
Remote Handling design progress for the Collimation Upgrade project Keith Kershaw EN-HE 6 June 2011.
Remote manipulations / diagnostics in radioactive areas and handling of radioactive material Workshop, Geneva, Switzerland 6 th May 2013 THE REPLACEMENT.
WAO 2007 Andrej Košiček Dealing with the Obsolescence in state-of- the-art Electronic Components 27 September 2007.
P13215 Spring Fall 2014 The Robotic Wandering Ambassador Background/Previous Work The wandering ambassador robot has been worked on by 7 previous.
HIE-ISOLDE Design Study and the CATHI Project Richard Catherall EN-STI ISOLDE Technical Coordinator HIE-EBIS Workshop 16 th -17 th October CERN.
INDIAN INSTITUTE OF TECHNOLOGY MADRAS Department of Engineering Design AUTONOMOUS UNDERWATER ROBOTIC LABORATORY Researchers : Dr. Asokan Thondiyath, Mr.
Bidders’ conference IT-4123 Supply, Replacement and Repair of Crane Rails Introduction to CERN and rails consolidation program Handling Engineering Group.
IN PARTNERSHIP WITH EVRIKA. IN PARTNERSHIP WITH EVRIKA.
EN-STI Group meeting 1 st February 2013 EN-STI Group meeting 1 st February 2013 Interventions for LS1 Elodie Macario EN/STI.
1 Advanced topics in OpenCIM 1.CIM: The need and the solution.CIM: The need and the solution. 2.Architecture overview.Architecture overview. 3.How Open.
09/03/2010 ADO-PO section meeting Beam Pipe Extraction/Insertion R. Vuillermet.
Engineering Department ENEN What is changing in EN 1. Streamlining and boosting remote handling and manipulation activities 2. Bringing small works closer.
Highlights of RP activities in support of ISOLDE operation and projects Joachim Vollaire, Alexandre Dorsival and Christelle Saury with material from others.
1 Final Conference, 19th – 23rd January 2015 Geneva, Switzerland RP 9 Study of a logistic concept for Super-FRS RH components Faraz Amjad Helmut Weick.
Robotic Interventions: the perspective of the user R. Losito, EN/STI, Remote Manipulations Workshop 6 May 2013.
Richard Catherall EN-STI 2 nd February 2011 ISCC Technical Report & Report from the Standing Group for the Upgrade of ISOLDE.
24V DC - Swing gate automation with articulated arm 391.
Preparation for Integration Organized access to the code WP6 infrastructure (MDS-2, RC, …) Input from WPs on requirements,... Acquire experience with Globus.
Chiller control system Specification meeting Lukasz Zwalinski – PH/DT.
ISOLDE Activities for LS2 Richard Catherall EN-STI ISOLDE Technical Coordinator.
Hosted by Creating RFPs for Tape Libraries Dianne McAdam Senior Analyst and Partner Data Mobility Group.
K. Foraz & Perrot A. L., EN/MEF - R2E Project LMC 25th May 2011 Thanks to EN/EL, EN/HE, EN/MEF, equipment owners the LHC integration team & the R2E team.
First radiological estimates for the HIRADMAT project H. Vincke and N. Conan 1.
Transport need for SPS external dump to the new dump cavern area LIU-SPS external beam dump JL GRENARD EN-HE
Pixel power R&D in Spain F. Arteche Phase II days Phase 2 pixel electronics meeting CERN - May 2015.
1 03/21/2006 GLAST CU Beam Test Workshop Scanning Table.
HIGH RADIATION TO MATERIALS: EXPERIMENTAL AREA HiRadMat Users meeting, 14/7/2011 Outline  Location  Test zone  Test tables geometry and position  Services.
EUROnu Costing Workshop May 2011 Beta-Beam Costing Exercise Elena Wildner, CERN 25/05/11 1 EUROnu Costing Workshop, CERN May 2011.
Floor plans, Infrastructure & Logistics Hie-Isolde Spectrometer Workshop Physics Department, Lund University 10 March, 2011 Hie-Isolde Erwin Siesling.
Status of the Design Study Richard Catherall EN-STI-RBS.
Radiation protection and radiation safety issues for HIE-ISOLDE. FLUKA calculations Y. Romanets ISOLDE Workshop and Users meeting 2010 CERN, 8 December.
Technical Report for the ISCC Meeting 18 th May 2009 R. Catherall/ M. Lindroos.
PS-EA Update RadWG August 23 rd 2012 Radiation 2 Electronics (R2E) LHC Activities RadWG August 23 rd 2012 PS East Area Update M. Brugger on behalf of the.
BIDDERS’ CONFERENCE IT-3981 Dismantling, Refurbishment, Replacement and Supply of Electrical Overhead Travelling Cranes Over 10 Tons Capacity January.
HLTC 28 th June Aim and expected results The aim of the workshop was: To create a CERN wide survey of all needs in the mentioned domain To collect.
The HiRadMat Facility Outline  Location  Status  WANF dismantling  Beam line  Experimental area  Schedule  Project management S. Evrard – EN/MEF.
T2K Remote Handling T. Sekiguchi (KEK) on behalf of Tada (KEK) 2012/11/10.
An Integrated Remote Target Handling System for CERN’s MEDICIS Radioactive Isotope Production Facility Keith Kershaw, Stefano Marzari, Jean-Louis Grenard.
SPS movable table Joanna Swieszek, Kurt Artoos (EN-MME) 14/04/2016.
SuperB Integration SuperB Experimental hall. Related topics of Slac D&D activities.
February 4 th, Quality assurance plan: production, installation and commissioning N.Vauthier TE-CRG Technical Review on Beam Screen Heater Electronics.
HIE-ISOLDE Workshop: The Technical Aspects Target Area Infrastructure Ventilation 29 November 2013 Andrea Polato* - CERN EN-CV-PJ * The research project.
Summary of IAPP scientific activities into 4 years P. Giannetti INFN of Pisa.
The New Radiation test facility at CERN: CHARM December 8 th 2014 CERN R2E project ESA/CERN meeting - December 8 th 2014 The new radiation tests facility.
R2E Report – P5 Safe-Room Update 20 th LSC Meeting, September 13 th 2013 CERN Radiation 2 Electronics (R2E) Project 20 th LSC Meeting September 13 th 2013.
CANOVATE MOBILE (CONTAINER) DATA CENTER SOLUTIONS
LEYARD DIRECTLIGHT LED VIDEO WALL SYSTEM
Train for RP survey and visual inspection in LHC Workshop on "Remote manipulations / diagnostics in radioactive areas and handling of radioactive material"
PAD-MAD requirements for Access in ISOLDE target area
Richard Catherall EN-STI 2nd February 2011
Upgrade activities at Clermont-Ferrand
EN-HE SPS works during EYETS
Renovation of the Accelerators Controls Infrastructure and its Assets Management Asset and Maintenance Management Workshop November 14th, 2013 Cl.Dehavay.
ISOLDE Front-End design review – Details of previous faults
Radiation-safe area for electronics, or laser or
Linac4-PSB 160 MeV connection readiness review ( TE/VSC )
HIE-ISOLDE Project: Planning & Resources
HIE-ISOLDE Status & Summary of HIE-ISOLDE SC
ALL-ELECTRIC TEMPERATURE CONTROL FOR CHILLED, FROZEN AND
Presentation transcript:

The ISOLDE robots upgrade JL GRENARD EN-HE ISOLDE Workshop and Users meeting

Content Overwiew of the target area Motivations for the change The differents solutions evaluated The installation and commissionning Futur evolution of the system 2

The ISOLDE facility 3

What do the robots do? Exchange of the targets of the ISOLDE facility The robots are part of the process of the facility 4

Interfaces of the facility Front EndStorage shielded sleves 5

Motivation for change Obsolete controls leading to unacceptable failure rate No remote recovery options 6

First idea: robot mounted on an AGV Not retained In case of failure all the electronics is onboard No easy remote recovery! Autonomous vehicle -Battery powered -Onboard controller -Navigation system integrated for positioning 7

Solution adopted Two industrial robots mounted on a linear axis 8

How to decide between those options 9

Some reasons for the selected solution Safe robot technology integrate safety volume -> no need to add extra sensors for protecting the infrastructure No electronics in the hazardous area Possible to customise Displacement of an electronic board outside of the radioactive area Replacement of all the cables with radiation tolerant ones 10

Full scale mock up testing Testing of the system including recovery methods 11

3D simulations and automatic programming Dedicated simulation software which automatically generates the code 12

Old robots dismantling 13

The installation Needs of drilling around 200 holes in the concrete Around 10t of new equipement installed 1.2 km of cables installed 14

Programming and testing Final setup of the overall system Thanks to the mock up testing and the 3D simulation only minor adjustement were needed Precision and repetability as expected 15

Work in the target area Several mSv/h at several point of work Cost in term of dosimetry 13.4mSv Shared between ~90 workers Worksite executed over 16 months 16

The new configuration New robots characteristics - Lifting capacity : ~30kg at full speed - Reach of the arm: 2.23m - Precision: 0.5mm - Max linear speed: ~2m/s used for the target exchange at only 10% of the speed capability CERN system integration - mechanical, software, trajectories - Interfaced with the access system, storage shelves, front end 17

Aditionnal refurbishment Shielded storage sleves Front End coupling tables 18

Evolution of the system In 2015 installation of a 3rd robot for MEDICIS 19

Final system in the coming years 3D animation 20

21 Thanks to all the teams involved in this work EN/HE: M. Czech, DGS/RP: A. Dorsival, C. Saury, M. Deschamps, J. Vollaire EN/STI: R. Catherall, T. Stora, AP. Bernardes, S. Marzari, J. Lendaro, M. Di Castro, C. Mitifiot, M. Vagnoni, M. Owen, C. Lemesre, D. Phan, B. Crepieux EN/CV: A. Polato, M. Battistin, A. Sabri, N. Roget EN/MME: S. Atieh, JP. Brachet, P. Mesenge, A. Porret EN/EL: P. Lelong, R. Necca EN/MEF: A. Pardon, M. Arnaud, M. Bonnet BE/OP: P. Fernier GS/ASE: E. Sanchez Coral, F. Valentini, D. Chapuis, B. Morand, L. Hammouti ….

Questions ? 22