A. Application Procedure: 1. Filing of the Application for Accreditation 2. Approval of the Accreditation Panel 3. Confirmation of the Chairman.

Slides:



Advertisements
Similar presentations
Vehicle Tracking Remote Control & Monitoring System.
Advertisements

By Prince Gupta (CA Final Student). WHAT IS LISTING AGREEMENT? AGREEMENT BETWEEN STOCK EXCHANGE AND THE COMPANY DESIROUS OF GETTING THEIR SECURITIES LISTED.
MN ENA STATE COUNCIL TREASURER Role and Responsibilities.
The Road To CPA Licensure Presented by: Tennessee State Board of Accountancy.
Voting Systems.  DS200 – new 2013  DS850 – new 2013  AutoMARK Voting Equipment.
Wage Withholding Tax Re-introduction May 2004 Speaker : Mr Ihsan Shamran Dir. of Corporations Dept.
Introducing new GPS based Vehicle Tracking System DG-Tracker Digilog Systems is now Nelso Technology Pvt. Ltd.
Chubaka Producciones Presenta :.
REVENUE REGULATION RR :
Federal Information Processing Standard (FIPS) 201, Personal Identity Verification for Federal Employees and Contractors Tim Polk May.
2012 JANUARY Sun Mon Tue Wed Thu Fri Sat
Districts In Good Standing. Origins Discussed at November 2010 meeting Approved by the Soil and Water Conservation Commission during January 2011 meeting.
P Pathophysiology Calendar. SundayMondayTuesdayWednesdayThursdayFridaySaturday January 2012.
6 th Annual Focus Users’ Conference Texas Reporting Presented by: Bethany Heslam.
Bonrix Track & Trace System A GPS Based Vehicle Tracing System (SMS, GPRS/3G, Offline) Bonrix Software Systems Ahmedabad (INDIA) Website:
Monitoring systems COMET types MS55 & MS6 MS55/MS6 Configuration.
GPS Vehicle Tracking Technology. What is GPS? Developed by the U.S. Department of Defense for the military, the Global Positioning System (GPS) is a.
Vehicle Management System. 2 About BMS Company BMS International Systems Development Ltd. BMS develops and implements sophisticated and easy to use “all-in-one”
BioEnable Technologies Private Limited C4/1, Raksha Lekha Society, Koregoan Park, Pune Tel , Fax:
Introduction Mobile Switch is a device which will be helpful to switch on and off any electrical/electronic devices through a SMS. The parameters of these.
1. 2 ESA Fee Payment Clifford Heng Channel Support Manager.
Intelligent Speed Adaptation in vehicles Date: 01/08/09 Tamil Eniyan. M 08MEA026 M.Tech-Automotive Electronics Review - 0.
Integrated Vehicle Tracking and Communication System.
GW101 presents… Financial Matters Presented by Colonial Central.
VERIFICATION OF TVET COLLEGE ENROLMENTS Background One of the key responsibilities of the Chief Directorate Planning and Institutional Support is.
- CA SUDHIR HALAKHANDI CA ABHAS HALAKHANDI “HALAKHANDI” LAXMI MARKET BEAWAR (RAJSTHAN) CELL
Input/OUTPUT [I/O Module structure].
 Sana Riaz  Registration No  Saira Khalid  Registration No
IFTA, Inc. Clearinghouse Funds Netting Update Lonette Turner (IFTA, Inc.) Patricia Platt (KS) September 18, 2008 IFTA Managers and Law Enforcement Seminar.
FQHC Look-Alike Registration for Implementation of Electronic Information Systems June 16, 2010 Twyla Adams, MHS, Branch Chief Anil Bommakanti, Consultant.
Legislative Update David Baker, MPA, PPS Director Local Government Division North Carolina Department of Revenue 1.
© 2015 Universal Service Administrative Company. All rights reserved. Direct BEAR Payment Process E-rate Program Applicant Training Washington DC Tampa.
1 Expenditure Documentation Review. 2 The Purpose of the Expenditure Documentation Review Beginning with Fiscal Year , the Office of Family Planning.
WORD JUMBLE. Months of the year Word in jumbled form e r r f b u y a Word in jumbled form e r r f b u y a february Click for the answer Next Question.
Finance Tasha Robinson Director of Finance (803)
IMPLEMENTATION OF ACTION PLAN FOR SUMMARY CPV REGULATION & IMPLEMENTATION Using of CPV codes became mandatory in Europe from December 16, 2003.
Ministry of Industry and Trade of Russian Federation June 2013 Deputy director of the Department of transport and special engineering industry V. Kaganov.
MAICSA (AM550) CORPORATE SECRETARYSHIP PAST YEAR EXAMINATION PAPERS DECEMBER 2005 PREPARED FOR : PM ALICIA PREPARED BY : RAJA NURMUNIRA RAJA HARMAN SHAH.
AGM – 11 th September OBJECTIVE To build and commission a community hydro scheme at Harlaw Reservoir.
DATE POWER 2 INCOME JANUARY 100member X 25.00P2, FEBRUARY 200member X 25.00P5, MARCH 400member X 25.00P10, APRIL 800member.
GPRS functionality overview in Horner OCS. GPRS functionality – Peer to Peer communication over GPRS – CSCAPE connectivity over GPRS – Data exchange using.
LG DATABASE AND REPORTING SYSTEM (LGDRS) 8-9 September 2015
AUTOMATED STUDENT ATTENDANCE SYSTEM
Outage Scheduler Transition Plan Kenneth Ragsdale NATF.
2011 Calendar Important Dates/Events/Homework. SunSatFriThursWedTuesMon January
Input/Output Problems Wide variety of peripherals —Delivering different amounts of data —At different speeds —In different formats All slower than CPU.
Data Coordinators Conference – 2014 Laura Marroquin CASEWORKER/JCMS Specialist Everything New Data Coordinators Should Know.
Important Changes and Reminders for Fund Year 2016 E-rate Program Applicant Training November 2015.
October 29, 2012 RARF Workshop 2 Introduction to ERCOT Modeling Process Jay Teixeira Manager, Model Administration.
CABLING SYSTEM WARRANTY REGISTRATION. PURPOSE OF CABLING REGISTRATION.
CALENDAR 2015: “THIS PROJECT HAS BEEN FUNDED WITH SUPPORT FROM THE EUROPEAN COMMISSION. THIS PUBLICATION [COMMUNICATION] REFLECTS THE VIEWS ONLY OF THE.
July 2007 SundayMondayTuesdayWednesdayThursdayFridaySaturday
Component D: Activity D.3: Surveys Department EU Twinning Project.
ELECTRONIC BID SUBMISSION An Excel sheet as pictured below will be sent to you via .
Preparation of the Self-Study and Documentation
Overview of the FEPAC Accreditation Process
McDonald’s Kalender 2009.
McDonald’s Kalender 2009.
The SAT will be given at ECHS on the dates below!
The SAT will be given at ECHS on the dates below!
McDonald’s Kalender 2009.
McDonald’s calendar 2007.
FTE Recalibration Kendra Jahnke June 2018.
MONTHS OF THE YEAR January February April March June May July August
WP 1 Management and Coordination
McDonald’s calendar 2007.
POC: ASAP Prevention Branch Chief (706)
2015 January February March April May June July August September
Presentation transcript:

A. Application Procedure: 1. Filing of the Application for Accreditation 2. Approval of the Accreditation Panel 3. Confirmation of the Chairman

B. Documentary Requirements: Department of Trade and Industry Business Name Registration, in case of individuals; In case of corporations or partnerships, Securities and Exchange Commission Registration and Articles of Incorporation; Mayors Permit for the past two (2) years; Tax Identification Number; BIR Registration for the last two (2) years; SSS Membership of the employer and employees; Audited Financial Statement and ITR for the last 2 years duly stamped/received by Bureau of Internal Revenue;

List of Directors and Officers for the Current Year (Sole Proprietorship)/ General Information Sheet (Corporation); National Bureau of Investigation Clearance of personnel/technicians; Company policy and procedure for resolution of complaints; Warranty of GPS supplier after installation, which shall not be less than one (1) year from installation;

C. Accreditation Fee: _______________________

Submission of Application for Accreditation shall commence on ________________ until _______________________.

II. GPS TECHNICAL REQUIREMENTS

Global Positioning System (GPS) specifications: Accuracy : at least 5m Back-up battery : included Communication GPRS (TCP) : SMS Configurable I/O’s : at least 4 Internal memory : at least 8MB Serial output : for interfacing with other devices

DATA FORMAT -to make the format extensible, headers are placed before each data value e.g. 1D TM DT LT LN AT+19.7+SP+0.0 Headers - ID, TM, DT, LT, LN, AT, SP Data Values : Comments : software generated ID during registration : UTC Time in hhmmss.ss : UTC Date in ddmm.mmmm : Latitude in ddmm.mmmm : Longitudes in dddmm.mmmm 19.7: Altitude in meters 0.0 : Horizontal speed in KM/h

DURING OPERATION GPS providers should update the firmware of their devices to perform the following: 1. send GPRS data to the server via TCP on a pre-defined interval with the correct format 2. settings has the provision to be remotely configured via GSM/GPRS 3. handle GPS signal loss or erratic readings * if received data is erratic, last good known coordinates will Be sent 4. handle GSM signal loss * in the absence of gsm signal, all data will be stored and will be sent once gsm signal is again detected.

GPS Registration Procedures 1. PUB operator’s shall procure the device (GPS) from the accredited provider only; 2. The device (GPS) together with LTO OR/CR of the vehicle (where the device will be installed) shall be brought to LTFRB for registration in the system; 3. LTFRB will verify if the unit is authorized before the registration; 4. Vehicle Information Encoding The bus operators shall register their GPS devices at the LTFRB. A software application will be provided to the LTFRB to enroll each device with the corresponding details of the bus where it will be installed. 5. SMS Validation The software application will send queries to the device via SMS and the device should reply correspondingly. One option would be send AT commands to the device since these are generic to all GSM modules. Another option would be to inquire on the unique ID assigned using a defined command to verify if the ID inputted on the device is correct. This would also validate if the sim card number encoded is correct.

GPS Testing The device will now be installed on the bus and will go on a test run. The data sending capability of the device will be checked. Also, on board the bus is a reference GPS device that has been approved by LTFRB. Both devices will send data to the server and these will be plotted and compared to check the accuracy of the device under test.

Passenger Participation The accredited provider/supplier shall likewise include as part of the device, the so-called On Screen Display (OSD) through LED so as to reflect the actual speed of the bus during the operations and other important details as the case may be.

Schedule of Inspection PLATE NUMBER ENDING MONTH 1 and 7 January and July 2 and 8 February and August 3 and 9 March and September 4 and 0 April and October 5 May and November 6 June and December

PLATE MIDDLE DIGIT WEEK 1,2 and 3 First 4,5 and 6 Second 7 and 8 Third 9 and 0 Fourth The Board may conduct a random inspection according to its sound discretion as may be warranted by the circumstances involving the authorized unit/s.

Allowable Maximum Speed limit Metro Manila buses - 60kph Provincial Buses – 90 kph

Thank you