Integrated Power System Spreads over thousands of square kilometers Hundreds of Generating Units Thousands of Circuit Kilometers of Lines Tens of Thousands.

Slides:



Advertisements
Similar presentations
Study Committee Representatives Annual Report December, 2012
Advertisements

New Energy Horizons Opportunities and Challenges Fault Current Contributions from Wind Plants Dean Miller PacifiCorp July 25,
NERC Lessons Learned Summary December NERC lessons learned published in December 2014 Three NERC lessons learned (LL) were published in December.
Reliability Software1 Reliability Software Minimum requirements & Best practices Frank Macedo - FERC Technical Conference July 14, 2004.
ERCOT VRT Study, Phase I ERCOT ROS Meeting December 10, 2009.
GENERATOR PROTECTION.
Bulk Electric System Power Outages and Restoration Considerations Peter Heiman Western Area Power Administration (Desert Southwest Region) 1.
Active Power and Frequency Control
System Operator Conference NERC Standards Review for: Simulator Drill Orientation 2014 System Operator Conferences Charlotte NC & Franklin TN SERC/SOS.
INDUSTRIAL & SYSTEMS ENGINEERING
Campus da FEUP Rua Dr. Roberto Frias, Porto Portugal T F © 2009 Decentralised Energy Systems.
Three-Phase ac Voltage Generation
System Operator Conference Simulator Drill Orientation 2014 System Operator Conferences Charlotte NC & Franklin TN SERC/SOS Facilitator Team.
Process Engineer’s Role in Project Management Dr Abdullah Malik.
Supervisory Systems.
Workshop on Crisis & Disaster Management of Power Sector
Gas Turbine Power Plant
THE ELECTRIC SUB STATION
Year 2006 Report “Better” Managed and Controlled Transmission Grids using Advanced Technological Concepts Aty Edris EPRI Power Delivery & Markets
ACTION PROPOSAL FOR FLYWHEEL ENERGY TECHNOLOGY Enhance future grid reliability, interoperability, & extreme event protection In 20 years, the flywheel.
Costs of Ancillary Services & Congestion Management Fedor Opadchiy Deputy Chairman of the Board.
“A large piece of stone could be taken to the top of hill with Combined efforts of many people successfully but the same could roll down in no time.
Houston Area Dynamic Reactive Project March 11,
Applying the Distribution System in Grid Restoration/NERC CIP-014 Risk Assessment Srijib Mukherjee, Ph.D., P.E. UC Synergetic.
1 Cheng-Ting Hsu Chao-Shun Chen Islanding Operations for the Distribution Systems with Dispersed Generation Systems Department of Electrical Engineering.
Generation & Trading CIST REGIONAL ENERGY MARKET IN SOUTH EAST EUROPE (REM) Athens – 27 th of October 2004.
Voltage Collapse M. H. Sadeghi Winter 2007 KNTU. Power System Stability IEEE: Power system stability is defined as the capability of a system to maintain.
Overview What is a weak system? Useful metric to identify weak systems: SCR What could possibly go wrong? Is a weak system so bad? What can you do? Risk.
Electrical Distribution Training
Barcelona– May 2003 CIRED’2003 Beta session 4a: Distributed Generation Controllability of DG helps managing Distribution Grids J. A. Peças Lopes
Conclusions Innovative application of induction and synchronous generators in autonomous small hydropower plant Prof. M.T.E. Kahn NeuroMorphoGenics/NMG.
Black Sea Regional Transmission Planning Project By Predrag Mikša EKC - Electricity Coordinating Center Istanbul, March 2011.
Frankfurt (Germany), 6-9 June 2011 Smart Grid Protection in China Wu Guopei Guangzhou Power Supply Bureau Guangdong Power Grid, China.
1 TRANSMISSION SYSTEM OVERVIEW NETWORK OPERATING COMMITTEE April 17, 2007 New Mexico Transmission System Overview.
SLIDE 1 ISSUES AND PRACTICAL EXPERIENCES WITH CONNECTION OF WIND FARMS TO WEAK AC NETWORKS June 2013 PRESENTED BY BABAK BADRZADEH.
Need for protection Power system must be kept in operation continuously without major breakdowns This can be achieved in two ways: 1.Implement a system.
Clemson University Electric Power Research Association CHANDANA BOMMAREDDY CLEMSON UNIVERSITY DG VOLTAGE CONTROL IN AN ISLANDING MODE OF OPERATION.
Managing a Power System with 40% Wind Dr Alan Rogers EirGrid.
SRLDC BANGALORE 20 th March This Presentation Covers … … … Definitions Emphasis of Black Start Restoration in IEGC Causes of Blackouts Restoration.
Transmission Outage Process April Purpose In compliance with the Protocols and the Electric Reliability Council of Texas (ERCOT) Operating Guides,
NLDC1 Defence plan and System restoration. Introduction Inter-Connected operation - widespread propagation of disturbance Inter-Connected operation -
Unit 3 REACTIVE POWER AND VOLTAGE CONTROL.  BASIC REQUIREMENTS OF EXCITATION CNTRL  Excitation Current up to 10’000 amps  Input frequency range from.
Steady State Analysis Of A Microgrid Connected To A Power System
Optimal Power Flow- Basic Requirements For Real Life.
Name Of The College & Dept
FRCC System Restoration 2016 FRCC System Operator Seminar.
Restoration Concepts PEAK RC Training Classification: Confidential Version No.: 1.5 Date of Document: Document Owner/Author: B Pederson Classification:
TEPPC Review Task Force January 11, Purpose Advise and make recommendations on Future potential future generation and load balance Adequacy of the.
Voltage Control Brad Calhoun Consultant, Sr. Trainer Spring 2016.
- 1 - Presentation reference Demand Side Bidding - an IEA Development Project for Competitive Electricity Markets Presentation to Metering Europe 2002.
HVDC Transmission.
Understanding the Integrated Resource Plan (IRP 2010 Rev 2)
Multiscale energy models for designing energy systems with electric vehicles André Pina 16/06/2010.
(c) IRD 2002 Power System Restoration (Black Start) Black Start Panel Session IEEE PES Summer Meeting Chicago, Illinois July 23, 2002 M. M. Adibi IRD Corp.,
Sub Station.
Agenda TSOG 8th November
“FRCC RESTORATION PLAN (BLACKOUT & BLACK START)” - TRAINING -
Black Start Overview.
IG BASED WINDFARMS USING STATCOM
PSCAD models.
PHILOSOPH OF ISLANDING
Economic Operation of Power Systems
Reactive Power and Voltage Control
Combined operation of different power plants PREPARED BY : Priyanka Grover Btech (EE) SBSSTC,FZR.
Introduction To Reactive Power
ELECTRICAL INSTALLATION AND MAINTENANCE (EIM) 5 INSTALL ELECTRICAL PROTECTIVE DEVICES FOR DISTRIBUTION, POWER, LIGHTING, AUXILIARY, LIGHTNING PROTECTION.
Automatic Generation Control (AGC)
POWER SYSTEM ANALYSIS INTRODUCTION.
DEC System Voltage Planning - June 2018
National Institute of Wind Energy(NIWE)
Presentation transcript:

Integrated Power System Spreads over thousands of square kilometers Hundreds of Generating Units Thousands of Circuit Kilometers of Lines Tens of Thousands of Devices SINGLE LARGEST COMPLEX MACHINE 100% Reliability IMPOSSIBLE

NORMAL A L E R T EMERGENCY RESTORATIVE

RESTORING NORMAL SYSTEM OPERATION AS QUICKLY AS POSSIBLE SYNCHRONISING OF AT LEAST ONE UNIT AT ALL POWER STATION RESTORING ESSENTIAL LOADS ESTABLISHING ALL INTERCONNECTIONS STARTING ECONOMIC DISPATCH STARTING ALLOCATION OF C. S SHARE MINIMIZING AMOUNT OF UNSERVED ENERGY RESTORATION OBJECTIVES

IMPAIRED COMMUNICATIONS, LIMITED INFORMATION. RE-ASSEMBLING TIE ELEMENTS OF POWER SYSTEM. UNFAMILIARITY WITH THE SITUATION (DOES NOT OCCUR REGULARLY) TIME CONSTRAINTS INFORMATION TO BE FURNISHED TO AUTHORITIES- PRESSURE ON OPERATOR RESTORATION PROBLEMS

EXTENT OF BLACK OUT AND ACTUAL REQUIREMENT IDENTIFICATION OF BOUNDARIES OF ENERGISED AREAS ASCERTAINING FREQUENCY & VOLTAGE OF ENERGISED AREA STATUS OF GENERATING PLANTS(HOT/COLD/HOUSELOAD ) NON AVAILABILITY OF ELEMENTS(LC/FAULT ETC) OVERLOADING OF ELEMENTS LOADS INTERRUPTED BY UNDER- FREQUENCY RELAY OPERATION OR DIRECT TRIPPING STATUS OF BREAKERS SYSTEM STATUS DETERMINATION

 CONSIDERATION OF TIME-CRITICAL BOILER- TURBINE START-UP CHARACTERISTICS (FOR PREDOMINANTLY THERMAL SYSTEMS)  SURVIVAL POWER SUPPLY TO THE PLANTS AT THE EARLIEST WITH AVAILABLE ARRANGEMENT (DG SETS) FOR Turbine emergency oil pump.Jacking oil pumps.Barring gear of the turbine.Lubricating oil pumps.Emergency lighting.Battery charger Compressor for CB PLANT SURVIVAL AND START UP THUMB RULES

ALL DG/GT’S TO RUN TO PROVIDE START UP POWER. ESTIMATION OF TOTAL START UP POWER REQUIRED TO RUN AT LEAST ONE MACHINE OF EACH POWER STATIONS. TAKING CARE NOT TO LOAD THE GENERATOR SUPPLYING START-UP POWER BEYOND 80% OF ITS CAPACITY. RELEASING AUXILIARY POWER IN STEPS. THE CAPACITY (I.E. FAULT LEVEL) OF ISLAND (SUPPLYING START UP POWER) TO SUSTAIN- STARTING CURRENT 0F BFP ETC. TO BE CHECKED. PLANT SURVIVAL AND START UP

CLEARING ALL DE-ENERGISED BUSES GLOBAL OPENING OF ALL THE BREAKERS ELSE:-SELECTIVE BREAKER OPERATION AFTER CAREFUL CONSIDERATION SECTIONALISING A SYSTEM INTO SUB-SYSTEMS TO ENABLE PARALLEL RESTORATION OF ISLANDS AUTOMATICALLY SWITCHED CAPACITORS AND UNDER FREQUENCY RELAYS MAY HAVE TO BE KEPT OUT OF SERVICE AT THE INITIAL STAGE NETWORK PREPARATION

NETWORK ENERGISATION IDENTIFY THE IMPORTANT AND ESSENTIAL LOADS TO BE RESTORED FIRST AT EVERY STAGE WE SHOULD BE ABLE TO SATISFY –REACTIVE POWER BALANCE –LOAD GENERATION BALANCE –PROTECTION AND PLANT CONTROL SYSTEM REQUIREMENTS HVDC IMPORT – ONLY WHEN MIN FAULT LEVEL IS AVAILABLE. AVOID PARALLELING ISLANDS THROUGH WEAK LINKS THUMB RULES

NETWORK ENERGISATION PLANT CONTROL SYSTEM CHARACTERISTICS A) MECHANICAL CONSIDERATIONS REGULATION OF RATE OF CHANGE OF TEMPERATURE TO BE KEPT MANUAL CONTROL FEED WATER WITH THE SOLE OBJECTIVE OF MAINTAINING DRUM LEVEL AT SET POINT PLANTS HAVING FEED WATER REGULATING VALVES PREFERABLE TO THOSE HAVING TURBINE-DRIVEN FEED PUMPS TWO FUEL SUPPLY SYSTEMS - ONE (OR NONE) AUTOMATIC AND ONE (OR BOTH) IN MANUAL.

NETWORK ENERGISATION B) ELECTRICAL CONSIDERATIONS VOLTAGE REGULATOR TO BE SWITCHED TO AUTOMATIC CONTROL (FROM MANUAL) ONLY WHEN THE UNIT REACHES A MIN. OPERATING POINT AND A SUFFICIENT VAR GENERATION 1S ESTABLISHED PROTECTIVE RELAYS SUCH AS VOLTS PER HZ, OUT OF STEP, UNDER EXCITATION, DISTANCE, FREQUENCY & FIELD. FORCING CAN INITIATE AN UNDESIRABLE REGULATOR RESPONSE OR GENERATOR TRIP DURING START UP

NETWORK ENERGISATION STRUCTURAL SYSTEM SIZE METROPOLITAN OR RURAL COMPACT OR EXTENSIVE GENERATION TRANSMISSION VOLTAGE LEVELS TYPES AND SIZES OF LOAD BLOCKS AVAILABILITY OF INTERCONNECTION ASSISTANCE

NETWORK ENERGISATION DYNAMICS REACTIVE CAPABILITIES OF GENERATORS /SYNCHRONOUS CONDENSERS UNDER NORMAL AND EMERGENCY OPERATING CONDITIONS. SHUNT REACTOR AND CAPACITOR SIZES, LOCATIONS AND MODES OF CONTROL. CHARGING CURRENTS AND MAXIMUM SUSTAINABLE OVERVOLTAGE, TRANSFORMER REACTANCES, TAP RANGES AND MODES OF CONTROL GENERATOR MAXIMUM AND MINIMUM OUTPUTS UNDER DIFFERENT CONDITIONS

REACTIVE POWER BALANCE SOURCEGENERATIONABSORPTION GENERATOR YES LINE CHARGINGYES SHUNT CAPACITORYES SHUNT REACTORYES SYN CONDENSORYES STATIC VAR COMPENSATOR YES NETWORK ENERGISATION THUMB RULES

LOAD GENERATION BALANCE TYPE OF THE LOAD –PEAK OR OFF PEAK –COLD LOAD INRUSH GENERATOR CAPACITY MINIMUM LOADING OF GENERATOR RESPONSE TO SUDDEN LOAD PICKUP TIME ELAPSED(HOT START) NETWORK ENERGISATION

LOAD RESTORATION DURING RESTORATION EFFECT OF EACH RESTORATION ACTION ON FOLLOWING TO BE CONSIDERED –GENERATOR LOADING –TRANSMISSION LINE LOADING –LOAD ANGLE –RATE OF LOADING –RESPONSE OF THE GEN TO LOAD CHANGE –CHANGE IN SYSTEM FREQ AND OPERATION OF UFR’S –FLUCTUATING LOADS- EX. TRACTION, FURNACE ETC. THUMB RULES

RESTORATION STRATEGIES BUILD DOWN OR SEQUENTIAL STRATEGY BUILD UP OR PARALLEL STRATEGY

 RE-ENERGIZATION OF BULK POWER NETWORK BALANCED STEP-BY-STEP RESTORATION OF LOADS AND GENERATION SUITABLE FOR SMALL SYSTEMS NOT HAVING LONG EHV LINES OR PREDOMINANTLY HYDRO SYSTEMS WITH HIGH REACTIVE ABSORPTION CAPABILITY OR FOR LARGE SYSTEMS WITH VERY COMPACT SERVICE TERRITORIES USUALLY SELECTED WHEN STRONG NEIGHBOURING INTERCONNECTION ASSISTANCE 1S AVAILABLE INTERCONNECTION STATUS IS TO BE ASSESSED, HENCE TIME CONSUMING AND TASKING. BUILD DOWN OR SEQUENTIAL STRATEGY

 SIMULTANEOUS RESTORATION OF ISLANDS/ SUBSYSTEMS FOLLOWED BY THEIR MUTUAL SYNCHRONIZATION  USUALLY SELECTED IN CASE OF A COMPLETE SYSTEM COLLAPSE AND LACK OF INTERCONNECTION ASSISTANCE  RELATIVELY QUICK PROCESS  REQUIRES SEVERAL OPERATING TEAMS AND ADEQUATE COMMUNICATION FACILITIES FOR MUTUAL COORDINATION BUILD UP STRATEGY

BUILD UP EXAMPLE- AP SYSTEM RESTORATION VTS+GAS NSR+SSLM RyTPP+ CUDDAPAH RADIAL ON TN

SPECIAL CONSIDERATIONS FIRM TRANSMISSION IN THE INTERCONNECTION BETWEEN SUBSYSTEMS AND FIRM GENERATION CAPACITY IN EACH SUB SYSTEM TO BE ENSURED DURING EARLY STAGES OF RESTORATION DEACTIVATION OF AUTOMATIC LOAD SHEDDING AND AUTOMATIC SWITCHED CAPACITORS DURING INITIAL STAGES, RESTORATION OF SMALLER RADIAL LOADS FOLLOWED BY LOW VOLTAGE AC NETWORK LOADS WHILE MAINTAINING REASONABLY CONSTANT REAL TO REACTIVE POWER RATIO PICKING UP SMALL BLOCKS OF LOADS FOLLOWED BY AS LARGE AS POSSIBLE, WITHOUT RISKING DANGEROUS DECLINE OF FREQUENCY, AS RESTORATION PROCEEDS. KEEPING GENERATOR TERMINAL VOLTAGES RELATIVELY LOW INITIALLY, AND ADJUSTING TRANSFORMER TAPS, SUBSEQUENTLY AS RESTORATION PROCEEDS

RESTORATION PLANNING GENERAL GUIDELINES FORMATION OF A PLANNING TEAM PARTICIPATION OF EXPERIENCED/KNOWLEDGEABLE PERSONNEL FROM RESPECTIVE FIELDS LIKE PROTECTION, COMMUNICATION, OPERATIONS, SYSTEM ANALYSIS ETC. REVIEW OF SYSTEM CHARACTERISTICS (RELEVANT TO RESTORATION)

RESTORATION PLANNING COMMON CONCERNS TIME CONSUMING NATURE OF SWITCHING OPERATION START-UP TIMINGS OF THERMAL UNITS FREQUENCY RESPONSE OF PRIME MOVERS TO SUDDEN LOAD PICK UP COLD LOAD INRUSH, POWER FACTORS AND COINCIDENT DEMAND FACTORS AVAILABILITY OF GOVERNOR FACILITIES OF UNITS

FORMULATION OF ASSUMPTIONS WORST POSSIBLE SCENARIO TO BE CONSIDERED USING SYSTEM OPERATORS EXPERIENCE AND JUDGEMENT CONSTRAINTS MAY DIFFER WIDELY FOR PEAK AND LEAN CONDITIONS COORDINATION OF LOAD PICKUP WITH GENERATOR RESPONSE AND ARRESTING FALL OF FRFQUFNCY, BEYOND PRIME MOVER RECOVERY CAPABILITY UNDER PEAK CONDITION BLACK-START FACILITIES MAY NOT BE AVAILABLE DURING WEEK END LEAN PERIOD

ESTABLISHMENT OF GOALS LOCAL CONDITIONS LIKE GENERATIOR MIX TYPE OF LOAD AND CONTRACTUAL OBLIGATIONS PLAY A DECISIVE ROLE IMMEDIATE OBJECTIVE (SYSTEM SPECIFIC) COULD BE. RE-ENERGIZING THE BULK POWER NETWORK OR ATTAINING A CERTAIN LEVEL OF ACTIVE AND REACTIVE CAPABILITY OR PICKING UP A DOWNTOWN LOAD OR SUPPLYING TIME-CRITICAL INDUSTRIAL LOADS OR ENERGIZING EHV LINE TO A REMOTE, LARGE GENERATING STATION

VALIDATION OF ASSUMPTIONS PROPER MODELLING OF STEADY STATE AND DYNAMIC BEHAVIOUR OF POWER SYSTEM CONFIRMING THE FEASIBILITY AND SECURITY OF PROPOSED ACTIONS USING A VARIETY OF ANALYSIS AND SIIMULATION TOOLS LIKE STEADY- STATE POWER FLOW, TRANSIENT AND DYNAMIC STABILITY ANALYSIS AND ELECTROMAGNETIC TRANSIENT SIMULATIONS LOAD DATA, GENERATION DATA ETC. TO BE PREPARED CAREFULLY ITERATION TWO ITERATIONS ARE INVOLVED - 1.MODELS HAVE TO BE VALIDATED AGAINST MEASURED AND TELEMETERED DATA 2.THE RESTORATION PLAN (TACTICS) DEVELOPED TO BE CHECKED AGAINST THE INITIAL STRATEGY FOR CONFORMITY AND FEASIBILITY

LOGISTICS AND COMMUNICATION CLOSE AND CONTINUAL CO-ORDINATION AMONG POWER SYSTEM POWER PLANT AND FIELD OPERATORS NEIGHBOURING UTILITIES, AUTHORITIES TO BE INFORMED TIME TO TIME ABOUT THE PROGRESS OF RESTORATION. TO DEPEND MORE ON THE UTILITIES’ OWN COMMUNICATION FACILITIES FALL BACK ARRANGEMENT IN CASE OF COMMUNICATION FAILURE.

EXPERT / COMMANDO GROUP COMMANDO GROUP TO BE FORMED AS THE SYSTEM COMPLEXITY GROWS. GROUP SHOULD CONSIST OF ENGINEERS FROM DIFFERENT FIELDS AND BELONGING TO DIFFERENT UTIILITIES. PERFECT UNDERSTANDING IN THIS CORE GROUP IT ENCHANCES THE MORAL STRENGTH OF FIELD OFFICERS AS WELL AS REDUCES RESTORATION TIME

AUIDITS AND UPDATES A TECHNICAL PERSON OUTSIDE THE RESTORATION TEAM SHOULD AUDIT THE ACTIVITIES. AUDITED RESTORATION PLAN MUST BE UPDATED. DOCUMENTS MUST BE REVISED REGULARLY TO REFLECT THE LATEST CHARACTERISTICS OF THE SYSTEM. CHANGES IN THE SCADA/EMS INSTALLATION OR MAJOR PLANT CONTROL, AVAILABLE TOOLS ALSO TO BE INCORPORATED.

TRAINING INSTRUCTION MANUALS OR AUDIO –VISUAL TAPES, FOR INDEPENDENT STUDY CLASSROOM INSTRUCTIONS LEARNING FROM PAST EXPERIENCE DURING RESTORATION. OPERATOR TRAINING SIMULATOR. ROLE PLAY OPERATOR’ S PROBLEM SOLVING CAPABILITY CAN ALSO BE EXPLORED AND DEVELOPED. ALTERNATIVE, SOURCE OF FINDING NEW IDEAS. DETAILED INTERACTION WITH THE PERSONS INVOLVED IN RESTORATION

DOCUMENTATION PURPOSE: TRAINING- REFERENCE, IMPROVEMENT OF RESTORATION PROCEDURES. SHOULD BE READILY ACCESSIBLE AND EASILY UNDERSTOOD. SHOULD BE STORED IN A CONVENIENT MEDIA FOR QUICK PROCESSING. SHOULD BE ILLUSTRATED WITH FAMILIAR DIAGRAMS AND CHARTS ACTIONS REJECTED AND INCORPORATED IN THE PLAN MUST BE RECORDED