Objective COM11 ESSIP Plan 2014 Adriatik KOKONA DSS/EIPR 19.09.2014.

Slides:



Advertisements
Similar presentations
Objective AOM 19 ESSIP Plan 2013 Octavian CIOARA DSS/EIPR
Advertisements

Objective ATC 16 ESSIP Plan 2013 Luca DELLORTO DSS/EIPR
Objective ATC 12 ESSIP Plan 2013 Luca DELLORTO DSS/EIPR
Objective FCM05 ESSIP Plan 2013 Octavian CIOARA DSS/EIPR
Objective AOM 21 ESSIP Plan 2013 Octavian CIOARA DSS/EIPR
LSSIP Objective AOP04.2.
Objective ITY-AGVCS2 ESSIP Plan 2013 Oscar ALFARO DSS/EIPR
Objective SRC-CHNG ESSIP Plan 2013 Agnieszka DYBOWSKA DSS/EIPR
LSSIP Objective AOP04.1.
Objective INF04 ESSIP Plan 2013 Ana Paula FRANGOLHO DSS/EIPR
Objective ITY-FMTP - Apply a common flight message transfer protocol (FMTP) ESSIP Plan 2013 Oscar ALFARO DSS/EIPR
Objective ATC 15 ESSIP Plan 2013 Luca DELLORTO DSS/EIPR
LSSIP Objective AOP01.2.
Objective AOM 13.1 ESSIP Plan 2013 Octavian CIOARA DSS/EIPR
Objective COM11 ESSIP Plan 2013 Adriatik KOKONA DSS/EIPR
Objective COM09 - Migrate ground international or regional X.25 data networks or services to the Internet Protocol (IP) ESSIP Plan 2013 Oscar ALFARO DSS/EIPR.
Objective FCM01 ESSIP Plan 2013 Octavian CIOARA DSS/EIPR
Objective COM10 ESSIP Plan 2013 Adriatik KOKONA DSS/EIPR
Objective SRC-SLRD ESSIP Plan 2013 Agnieszka DYBOWSKA DSS/EIPR
Objective FCM04 ESSIP Plan 2013 Octavian CIOARA DSS/EIPR
Objective NAV03 ESSIP Plan 2013 Adriatik KOKONA DSS/EIPR
Objective ATC 17 ESSIP Plan 2013 Luca DELLORTO DSS/EIPR
Objective NAV10 ESSIP Plan 2014 Adriatik KOKONA DSS/EIPR
Objective ITY-AGDL ESSIP Plan 2014 Adriatik KOKONA DSS/EIPR
Objective INF07 ESSIP Plan 2014 Ana Paula FRANGOLHO DSS/EIPR
Objective ITY-SPI ESSIP Plan 2014 Octavian CIOARA DPS/PEPR
LSSIP Objective AOP04.2.
Objective ITY-SPI ESSIP Plan 2013 Ana Paula FRANGOLHO DSS/EIPR
Objective ATC 15 ESSIP Plan 2014 Luca DELL’ORTO DSS/EIPR
Objective ATC 12 ESSIP Plan 2014 Luca DELL’ORTO DSS/EIPR
Objective ATC 17 ESSIP Plan 2014 Luca DELL’ORTO DSS/EIPR
Objective COM10 ESSIP Plan 2014 Adriatik KOKONA DSS/EIPR
Objective AOM 19 ESSIP Plan 2014 Agnieszka DYBOWSKA DPS/PEPR
Objective ATC 02.6 ESSIP Plan 2014 Ingrid FEIJT DSS/PEPR
Objective ATC 02.2 ESSIP Plan 2014 Ingrid FEIJT DPS/PEPR
The European Organisation for the Safety of Air Navigation Objective AOP05.
Objective ITY-ADQ ESSIP Plan 2014 Ana Paula FRANGOLHO DSS/EIPR
Objective FCM03 ESSIP Plan 2014 Octavian CIOARA DPS/PEPR
Objective ATC 16 ESSIP Plan 2014 Luca DELL’ORTO DSS/EIPR
Objective AOM 21 ESSIP Plan 2014 Agnieszka DYBOWSKA DPS/PEPR
Objective ATC 02.7 ESSIP Plan 2014 Ingrid FEIJT DSS/PEPR
Objective FCM04 ESSIP Plan 2014 Octavian CIOARA DPS/PEPR
Objective SRC-RLMK ESSIP Plan 2013 Agnieszka DYBOWSKA DSS/EIPR
Nigel Makins EUROCONTROL
Objective ATC 02.2 ESSIP Plan 2013 Ingrid FEIJT DSS/EIPR
Objective FCM01 ESSIP Plan 2015 Octavian CIOARA DPS/PEPR
The European Organisation for the Safety of Air Navigation Objective AOP03.
The European Organisation for the Safety of Air Navigation Objective AOP05.
Objective ITY-FMTP - Apply a common flight message transfer protocol (FMTP) ESSIP Plan 2015 Oscar ALFARO DPS/PEPR
Objective FCM05 ESSIP Plan 2015 Octavian CIOARA DPS/PEPR
Objective ATC 07.1 ESSIP Plan 2013 Luca DELL’ORTO DSS/EIPR
Juan Vázquez Sanz EUROCONTROL SRU
Objective ITY-ADQ ESSIP Plan 2015 Ana Paula FRANGOLHO DPS/PEPR
Objective ITY-COTR ESSIP Plan 2015 Luca DELL’ORTO DPS/PEPR
Objective ATC 02.7 ESSIP Plan 2013 Ingrid FEIJT DSS/EIPR
Objective NAV10 ESSIP Plan 2015 Adriatik KOKONA DPS/PEPR
Objective COM10 ESSIP Plan 2015 Adriatik KOKONA DPS/PEPR
Objective AOM 19 ESSIP Plan 2015 Agnieszka DYBOWSKA DPS/PEPR
LSSIP Objective AOP05 Note: objective postponed 12 months in ESSIP Plan Edition 2015.
Objective NAV03 ESSIP Plan 2015 Adriatik KOKONA DPS/PEPR
LSSIP Objective AOP04.1.
Objective ATC 02.7 ESSIP Plan 2015 Ingrid FEIJT DPS/PEPR
Objective INF04 ESSIP Plan 2015 Ana Paula FRANGOLHO DPS/PEPR
Objective ITY-ACID ESSIP Plan 2015 Octavian CIOARA DPS/PEPR
Objective COM11 ESSIP Plan 2015 Adriatik KOKONA DPS/PEPR
Objective ITY-AGDL ESSIP Plan 2015 Adriatik KOKONA DPS/PEPR
Objective ITY-AGVCS2 ESSIP Plan 2015 Oscar ALFARO DPS/PEPR
Objective ATC 16 ESSIP Plan 2015 Luca DELL’ORTO DPS/PEPR
LSSIP Objective AOP03.
Presentation transcript:

Objective COM11 ESSIP Plan 2014 Adriatik KOKONA DSS/EIPR

ESSIP Plan 2014 / Objective COM112 Objective COM11  Comprehensive Explanation  Link to European ATM Master Plan  Most important SLoA(s)  Finalisation Criteria and Closed Questions  Supporting Material  ESSIP Report 2013  Objective Coordinator’s Analysis, recommendations, tips & tricks  Conclusions  Links and contacts

ESSIP Plan 2014 / Objective COM113 Comprehensive Explanation  The initiative covers inter centre (encompassing all type of ATM Units) voice communication and the links with the ground radio Stations;  The objective forecasts that all ECAC States migrate their ATM voice services to VoIP by the specified Full Operational Capability 12/2020;  Initial Operational Capability (Forward fit) date is 01/2013 for both inter- centre telephony and the links to the ground radio stations on the ground segment of the Air-Ground voice.  Inter centres voice communications are currently mainly performed via analogue and partially digital circuits (ATS-QSIG) since  At present VoIP is identified as being the medium term standard for ground telephony and ground segment of the Air-Ground voice.

ESSIP Plan 2014 / Objective COM114 Link to European ATM Master Plan  Digital Voice/VoIP for ground telephony CTE-C8CTE-C8

ESSIP Plan 2014 / Objective COM115 Most important SLoA(s)  COM11-ASP03 Upgrade and put into service Voice Communication Systems to support VoIP inter-centre telephony (12/2020)  COM11-ASP04 Upgrade and put into service Voice Communication Systems to support VoIP links to the ground radio stations (12/2020)

ESSIP Plan 2014 / Objective COM116 Finalisation Criteria and Closed Questions  Voice communications systems have been upgraded;  The technical file (TF) with evidences of compliance and the EC declaration of verification of systems (DoV) has been delivered to the competent National Supervisory Authority (NSA);  Upgraded voice communication systems have been put into service

ESSIP Plan 2014 / Objective COM117 Regulation and Supporting Material  EUROCONTROL - ESARR 4 Risk Assessment and Mitigation in ATM EUROCONTROL - ESARR 4 Risk Assessment and Mitigation in ATM  EUROCAE - ED Voice over Internet Protocol (VoIP) Air Traffic Management (ATM) System Operational and Technical Requirements 02/2009; EUROCAE - ED Voice over Internet Protocol (VoIP) Air Traffic Management (ATM) System Operational and Technical Requirements 02/2009  EUROCAE - ED-137B - Interoperability Standards for VoIP ATM Components (Volume 1: Radio - Volume 2: Telephone - Volume 3: European Legacy Telephone Interworking - Volume 4: Recording - Volume 5: Supervision) 01/2012; EUROCAE - ED-137B - Interoperability Standards for VoIP ATM Components (Volume 1: Radio - Volume 2: Telephone - Volume 3: European Legacy Telephone Interworking - Volume 4: Recording - Volume 5: Supervision) 01/2012  EUROCAE - ED Network Requirements and Performances for Voice over Internet Protocol (VoIP) Air Traffic Management (ATM) Systems (Part 1: Network Specification – Part 2: Network Design Guideline) ; EUROCAE - ED Network Requirements and Performances for Voice over Internet Protocol (VoIP) Air Traffic Management (ATM) Systems (Part 1: Network Specification – Part 2: Network Design Guideline)  EUROCONTROL - SIP v ATS-QSIG Gateway Interworking Test Specification - Edition 2 / 12/2013; EUROCONTROL - SIP v ATS-QSIG Gateway Interworking Test Specification - Edition 2 / 12/2013  EUROCONTROL - SIP v ATS-R2 Gateway Interworking Test Specification - Edition 2 / 12/2013; EUROCONTROL - SIP v ATS-R2 Gateway Interworking Test Specification - Edition 2 / 12/2013;  EUROCONTROL - VOTER - Edition 2.7 / 02/2014; EUROCONTROL - VOTER - Edition 2.7 / 02/2014;  EUROCONTROL - VoIP in ATM Cross-Reference Matrix - Edition 2 / 12/2013; EUROCONTROL - VoIP in ATM Cross-Reference Matrix - Edition 2 / 12/2013  EUROCONTROL - VoIP in ATM Telephony Test case specification - Edition 2 / 12/2013. EUROCONTROL - VoIP in ATM Telephony Test case specification - Edition 2 / 12/2013

ESSIP Plan 2014 / Objective COM118 ESSIP Report 2013  Majority of States have an implementation plan. Five States consider the objective not mature enough to start planning the implementation;  35 States have reported the objective ‘Planned’, while one State has reported it as Late. Five States (DE, DK, HR, LU and NO) have reported ‘No Plan’ for the time being;  The progress compared with the last cycle is as follows: Two States (HR & NO) have changed the status from Planned to No Plan. MAS, MD, MT & TR have postponed the planninng for completion by one year and AM, IE & MK by two years.

ESSIP Plan 2014 / Objective COM119 Objective Coordinator’s Analysis, recommendations, tips & tricks  Early implementation  Allows to get the benefit of the IP infrastructure, and to get early return on investment  Increases Airspace flexibility within functional airspace blocks in a multi-vendor operational setting.  Facilitates business continuity as Telecom service providers are phasing out their legacy analogue, 64kBit/s based and later 2MBit/s based services.

ESSIP Plan 2014 / Objective COM1110 Conclusions  VoIP in ATM is a mature standard referenced by ICAO;  VoIP in ATM is ready to be deployed over the IP infrastructure (PENS and ANSPs IP networks);  VoIP in ATM will increase Airspace flexibility;  VoIP in ATM will support and facilitate business continuity.

ESSIP Plan 2014 / Objective COM1111 Links and contacts  Objective Coordinator: Adriatik Kokona,  DNM Objective Expert(s): L. POPESCU,