SPS scrubbing run in 2014 H. Bartosik, G. Iadarola, G. Rumolo LHC Performance Workshop (Chamonix 2014), 22/9/2014 Many thanks to: G. Arduini, T. Argyropoulos,

Slides:



Advertisements
Similar presentations
Heat load due to e-cloud in the HL-LHC triplets G. Iadarola, G. Rumolo 19th HiLumi WP2 Task Leader Meeting - 18 October 2013 Many thanks to: H.Bartosik,
Advertisements

Expected performance in the injectors at 25 ns without and with LINAC4 Giovanni Rumolo, Hannes Bartosik and Adrian Oeftiger Acknowledgements: G. Arduini,
Electron-cloud instability in the CLIC damping ring for positrons H. Bartosik, G. Iadarola, Y. Papaphilippou, G. Rumolo TWIICE workshop, TWIICE.
E-Cloud Effects in the Proposed CERN PS2 Synchrotron M. Venturini, M. Furman, and J-L Vay (LBNL) ECLOUD10 Workshshop, Oct Cornell University Work.
Review of 2011 studies and priorities for 2012 LIU-SPS-BD.
Preliminary results and ideas for the SPS upgrade MDs on LHC beams in 2011 G. Rumolo on behalf of all the MD team (Elena, Thomas, Karel, Christina, Holger,
Vacuum, Surfaces & Coatings Group Technology Department 04/12/2014 R. Salemme – COLDEX results during SPS Scrubbing Run I Electron Cloud Meeting #18,
Bunch Flattening with RF Phase Modulation T. Argyropoulos, C. Bhat, A. Burov, J. F. Esteban Müller, S. Jakobsen, G. Papotti, T. Pieloni, T. Mastoridis,
BE-ABP-HSC Electron cloud simulations in the LHC MKI Electron Cloud meeting A. Romano, G. Iadarola, G. Rumolo Many thanks to: M. Barnes, M. Taborelli.
Giovanni Rumolo, G. Iadarola and O. Dominguez in LHC Beam Operation workshop - Evian 2011, 13 December 2011 For all LHC data shown (or referred to) in.
Injector MD planning and requests for 2014 Giovanni Rumolo and Hannes Bartosik Thanks to all MD users, machine supervisors, operators, experts … MSWG meeting,
AB-ABP/LHC Injector Synchrotrons Section CERN, Giovanni Rumolo 1 Final results of the E-Cloud Instability MDs at the SPS (26 and 55 GeV/c) G.
SPS scrubbing experience: electron cloud observables L. Mether on behalf of the LIU-SPS e-cloud team LIU SPS scrubbing review, September 8, 2015.
LHC Scrubbing Runs Overview H. Bartosik, G. Iadarola, K. Li, L. Mether, A. Romano, G. Rumolo, M. Schenk, G. Arduini ABP information meeting 03/09/2015.
First measurements of longitudinal impedance and single-bunch effects in LHC E. Shaposhnikova for BE/RF Thanks: P. Baudrenghien, A. Butterworth, T. Bohl,
LHC beams in the SPS in 2014 H. Bartosik, G. Rumolo, G. Iadarola With the help from K. Kornelis, V. Kain and SPS OP crew.
H. Bartosik, K. Cornelis, A. Guerrero, B. Mikulek, G. Rumolo, Y. Papaphilippou, B. Salvant, E. Shaposhnikova June 16 th, 2011.
PS (electron cloud?!) instability at flat top Mauro Pivi Gianni Iadarola, Giovanni Rumolo, Simone Gilardoni, Hannes Bartosik, Sandra Aumon 27/06/2012 ICE.
G. Rumolo, G. Iadarola, H. Bartosik, G. Arduini for CMAC#6, 16 August 2012 Many thanks to: V. Baglin, G. Bregliozzi, S. Claudet, O. Dominguez, J. Esteban-
History and motivation for a high harmonic RF system in LHC E. Shaposhnikova With input from T. Argyropoulos, J.E. Muller and all participants.
T. Argyropoulos, LIU /04/2013 Progress in the SPS: RF studies and beam quality T. Argyropoulos, T. Bohl, J. E. Muller,, H. Timko, E. Shaposhnikova.
HL-LHC/LIU Joint workshop Goal: Progressing towards an agreed set of 450 GeV beam parameters for High Luminosity operation in LHC after LS2 & LS3. Slides.
SPS Scrubbing Runs 2014 week 45 and week 50 (part I) H. Bartosik, G. Iadarola, K. Li, L. Mether, G. Rumolo, M. Schenk Thanks to: SPS OP crew, G. Arduini,
Electron cloud SPS in 2012 G. Iadarola, H.Bartosik, F. Caspers, S. Federmann, M.Holz, H. Neupert, G. Rumolo, M. Taborelli LIU Beam studies review.
0 1 Alternative Options in the Injectors – Preliminary Summary H. Damerau LIU-TM#8 18 October 2013 Many thanks for discussions and input to T. Argyropoulos,
Production of bunch doublets for scrubbing of the LHC J. Esteban Muller (simulations), E. Shaposhnikova 3 December 2013 LBOC Thanks to H. Bartosik, T.
Lessons from SPS studies in 2010 E. Shaposhnikova Chamonix’11 session 09: LHC injectors upgrade.
Improved electron cloud build-up simulations with PyECLOUD G. Iadarola (1),(2), G. Rumolo (1) (1) CERN, Geneva, Switzerland, (2) Università di Napoli “Federico.
Some ideas for/from the SPS LIU-SPS team. Scrubbing (only) for ecloud in SPS? aC coating remains baseline..... –but scrubbing has many potential advantages.
CERN, LIU-SPS ZS Review, 20/02/ Brief review on electron cloud simulations for the SPS electrostatic septum (ZS) G. Rumolo and G. Iadarola in LIU-SPS.
Simulation of multipacting thresholds G. Iadarola and A. Romano on behalf of the LIU-SPS e-cloud team LIU SPS scrubbing review, 8 September, 2015.
Electron cloud in the LHC: lessons learnt from 2015 experience with 25 ns beams G. Iadarola, H. Bartosik, K. Li, L. Mether, A.Romano, G. Rumolo, M. Schenk.
Heat load analysis for Inner Triplet and Stand Alone Modules H. Bartosik, J. Hulsmann, G. Iadarola and G. Rumolo LBOC meeting 28 October 2014 Based on.
News on TMCI in the SPS: Injecting high intensity bunches Benoit for the MD team: T. Bohl, K. Cornelis, H. Damerau, W. Hofle, E. Metral, G. Rumolo, B.
Prepared by M. Jimenez AT Dept / Vacuum Group, ECloud’04 Future Needs and Future Directions Maximizing the LHC Performances J.M. Jimenez …when Nature persists.
SPS proton beam for AWAKE E. Shaposhnikova 13 th AWAKE PEB Meeting With contributions from T. Argyropoulos, T. Bohl, H. Bartosik, S. Cettour.
Elias Métral, LHC Beam Commissioning Working Group meeting, 30/11/2010 /241 PRELIMINARY FINDINGS FROM INSTABILITY MEASUREMENTS DURING THE 75ns AND 50ns.
LIU-SPS e-cloud contribution to TDR Electron cloud meeting, 17/02/20141 o First draft by end of February Between 5 to 10 max pages per chapter, refer.
Prepared by M. Jimenez AT Dept / Vacuum Group, ECloud’04 ELECTRON CLOUDS AND VACUUM EFFECTS IN THE SPS Experimental Program for 2004 J.M. Jimenez Thanks.
Comparison of stainless steel and enamel clearing electrodes E. Mahner, F. Caspers, T. Kroyer Acknowledgements to G. Arduini, H. Damerau, S. Hancock, B.
Simulation of the new PS EC detector: implementation and results A. Romano, G. Iadarola, G. Rumolo LIU-PS Student Day 20 April 2015.
LER Workshop, Oct 11, 2006Intensity Increase in the LER – T. Sen1 LHC Accelerator Research Program bnl-fnal-lbnl-slac  Motivation  Slip stacking in the.
Beam loss and radiation in the SPS for higher intensities and injection energy G. Arduini 20 th November 2007 Acknowledgments: E. Shaposhnikova and all.
Pushing the space charge limit in the CERN LHC injectors H. Bartosik for the CERN space charge team with contributions from S. Gilardoni, A. Huschauer,
End-of-year talk LIU-SPS BD WG meeting Our meetings in 2013 O During year - 9 meetings of LIU-SPS BD WG (less than usual 12 in the past :-)
RF measurements during floating MD in Week 40 3 rd of October 2012 LIU-SPS BD WG 25/10/2012 Participants: T. Argyropoulos, H. Bartosik, T. Bohl, J. Esteban.
Progress on e-cloud effects (PS and SPS) G. Iadarola, H.Bartosik, G. Rumolo, M. Taborelli, C. Yin Vallgren Many thanks to: G. Arduini, T. Argyropoulos,
200 MHz option for HL-LHC: e-cloud considerations (heat load aspects) G. Iadarola and G. Rumolo HLLHC WP2 meeting 03/05/2016 Many thanks to: K. Li, J.
High Intensity Beams in Existing Accelerators for CN2PY: SPS studies, PS issues E. Shaposhnikova Laguna-LBNO General Meeting CERN, Acknowledgments:
Outcome of beam dynamics simulations - Scenarios, requirements and expected gains s LIU-SPS Coordination meeting 26/08/2015 A. Lasheen, E. Shaposhnikova,
Summary of ions measurements in 2015 and priorities for 2016 studies E. Shaposhnikova 3/02/2016 Based on input from H. Bartosik, T. Bohl, B. Goddard, V.
Benchmarking Headtail with e-cloud observations with LHC 25ns beam H. Bartosik, W. Höfle, G. Iadarola, Y. Papaphilippou, G. Rumolo.
AB-ABP/LHC Injector Synchrotrons Section CERN, Giovanni Rumolo 1 Preliminary results of the E-Cloud Instability MDs at the SPS G. Rumolo, in.
Juan F. Esteban Müller P. Baudrenghien, T. Mastoridis, E. Shaposhnikova, D. Valuch IPAC’14 – Acknowledgements: T. Bohl, G. Iadarola, G. Rumolo,
A preliminary overview on the 2014 Scrubbing Run II The scrubbing team, i.e. H. Bartosik, G. Iadarola, K. Li, L. Mether, A. Romano, G. Rumolo, B. Salvant,
Electron Cloud Effects
Beam Instability in High Energy Hadron Accelerators and its Challenge for SPPC Liu Yu Dong.
Joint LIU / HLLHC day -15 October 2015
Plans for ions in the injector complex D
Longitudinal beam parameters and stability
Proposals for 2015 impedance-related MD requests for PSB and SPS
Saturday 21st April 00:33 Interlock during ramp on BLM HV
Update on the HiLumi/LIU parameters and performance ramp up after LS2
Acknowledgments: LIU-PT members and deputies, H. Bartosik
Week 46 Week 46: Machine coordinators: Roger Bailey – Gianluigi Arduini Main aims of the week: Stable beams with ions Scheduled stop for ion source refill.
Scrubbing progress - 10/12/2012
News on TMCI in the SPS: Injecting high intensity bunches
Beam dynamics requirements after LS2
SPS collective effects Hannes, Gianni, Giovanni, Benoit, Yannis
Collective effects in the SPS and LHC (longitudinal plane)
Presentation transcript:

SPS scrubbing run in 2014 H. Bartosik, G. Iadarola, G. Rumolo LHC Performance Workshop (Chamonix 2014), 22/9/2014 Many thanks to: G. Arduini, T. Argyropoulos, T. Bohl, K. Cornelis, H. Damerau, J. Esteban Müller, B. Goddard, S. Hancock, W. Höfle, L. Kopylov, H. Neupert, Y. Papaphilippou, G. Papotti, E. Shaposhnikova, M. Taborelli and the SPS operator crew

Outline Introduction The 2014 SPS scrubbing run o Possible cycles o Scrubbing stages o Possible supercycle composition The doublet scrubbing beam o Motivation o Production scheme o Experience in MDs Scrubbing preparation o Beams from the PS o SPS setup o Measurements

Outline Introduction The 2014 SPS scrubbing run o Possible cycles o Scrubbing stages o Possible supercycle composition The doublet scrubbing beam o Motivation o Production scheme o Experience in MDs Scrubbing preparation o Beams from the PS o SPS setup o Measurements

Electron cloud in the SPS and scrubbing Strong limitation due to e-cloud in the past →Instabilities at injection + incoherent effects →Emittance blow-up along the batch →High chromaticity needed for beam stability →Pressure rise around the machine Situation improved gradually due to scrubbing →Requires days of dedicated running in high electron cloud conditions →Secondary Electron Yield reduction by the e-cloud itself Scrubbing runs since 2002 →Performed at 26 GeV in cycling mode (~40 s cycle length) →Typically limited by heating and/or outgassing →~1-2 weeks periods SPS scrubbing history 43.2 s 2002 (14d) 2003 (8d) 2004 (10d) 2006 (5d) 2007 (7d) 2008 (2.5d) 2012 (5d) 2009 (1.5d) Shutdown 400% 2000 (48 b x μm

SPS scrubbing run 2014 Goals for 2014: Qualify the loss of conditioning due to LS1 Recover 2012 performance with 25 ns beams Quantify amount of beam/time needed Test “doublet” scrubbing beam  to be used in the LHC in 2015 Qualification criterion  beam quality measurements Ideally, achieve by the end of the allocated scrubbing time: 25 ns, 4 batches, up to 1.3e11ppb, emittances below nominal, no blowup along the train as in 2012 basis for LIU strategy on e-cloud mitigation – coating vs scrubbing

From 2014 injector schedule (current version)

Scrubbing originally foreseen in two consecutive weeks (W39-40), before the start-up of the NA physics. Then split between Weeks 39 and 45  Finally spread over Week 45 plus an additional two-day mini-block in Week 50 Several reasons for splitting the scrubbing run into two blocks (requested by LIU-SPS): Gives time to analyze the first block’s results and adapt accordingly Untangling scrubbing from the machine commissioning, NA setup and vacuum conditioning of all the newly-installed or vented equipment Allows setting up scrubbing beams before the 2nd scrubbing block ⇒ the “doublet” beam – its potential to scrub the SPS can be explored already in 2014 (also in view of LHC scrubbing in 2015)

Pre-scrubbing cycles Over weeks 41 – 44 some experience will be already gained during the available parallel and dedicated MD time  Both single bunch and 25 ns beam (1 batch) on short flat bottom cycle (6BP) should be already set up  Work on recovery performance for nominal 25 ns beam might have already started (with the consequent scrubbing) 6 BPs (7.2 s) Inj. Dump

Scrubbing cycles We will need to accumulate dose and monitor the evolution of beam parameters for both coherent and incoherent effects  4 or more batches circulating in the machine at 26 GeV  Acceleration to 450 GeV should be fully set up and used for scrubbing qualification 18 BPs (21.6 s) 33 BPs (39.6 s) Inj. Dump Inj. Dump Inj. 19 BPs (22.8 s)

Planning (to be steered on the fly) MondayTuesdayWednesdayThursdayFriday SaturdaySunday Intensity ramp up at 26 GeV on intermediate flat bottom cycle (21.6 s) First scrubbing block Intensity ramp up at 26 GeV with 25 ns beams (ideally up to 5 injections – try to push bunch intensity up to 1.5x10 11 p/b?) Inj. Dump Possible supercycle (to be coordinated with physics in the PS complex) Inj. Week 45

Planning (to be steered on the fly) MondayTuesdayWednesdayThursdayFriday SaturdaySunday Intensity ramp up at 26 GeV on intermediate flat bottom cycle (21.6 s) First scrubbing block Intensity ramp up at 26 GeV with 25 ns beams (ideally up to 5 injections – try to push bunch intensity up to 1.5x10 11 p/b?) Study residual electron cloud effects on beam lifetime and quality for nominal beam (e.g. emittance growth, bunch shortening over long flat bottom) while gradually lowering vertical chromaticity setting for stability Inj. Dump Inj. Possible supercycle Studies on long flat bottom cycle (39.6 s) Week 45

Planning (to be steered on the fly) MondayTuesdayWednesdayThursdayFriday SaturdaySunday Intensity ramp up at 26 GeV on intermediate flat bottom cycle (21.6 s) First scrubbing block Intensity ramp up at 26 GeV with 25 ns beams (ideally up to 5 injections – try to push bunch intensity up to 1.5x10 11 p/b?) Study residual electron cloud effects on beam lifetime and quality for nominal beam (e.g. emittance growth, bunch shortening over long flat bottom) while gradually lowering vertical chromaticity setting for stability Acceleration and scrubbing qualification Studies on long flat bottom cycle (39.6 s) Scrubbing qualification (25 ns std and BCMS, up to 450 GeV) Possible supercycle for scrubbing + qualification Week 45

Planning (to be steered on the fly) MondayTuesday Second scrubbing block At this stage doublet beam could be ready including acceleration The goal is to accumulate the largest possible electron dose on the beam chambers The results of the tests with the doublet beam will be important for the LHC scrubbing in 2015 Wednesday Week 50 Possible supercycle Scrubbing with doublet (possibly with acceleration) Dedicated MD (scrubbing) 18 BPs (21.6 s) Inj. Dump

Outline Introduction The 2014 SPS scrubbing run o Possible cycles o Scrubbing stages o Possible supercycle composition The doublet scrubbing beam o Motivation o Production scheme o Experience in MDs Scrubbing preparation o Beams from the PS o SPS setup o Measurements

“Doublet” scrubbing beam: introduction Scrubbing with 25 ns beam allowed to lower the SEY of the dipole chambers well below the multipacting threshold for 50 ns  e-cloud free operation with 50 ns beams  Can we go to lower bunch spacing to scrub for 25 ns operation? Due to RF limitations in the PS it is impossible to inject bunch-to-bucket into the SPS with spacing shorter than 25 ns An alternative is to inject long bunches into the SPS and capturing each bunch in two neighboring buckets obtaining a (5+20) ns “hybrid” spacing Non adiabatic splitting at SPS injection

“Doublet” scrubbing beam: introduction Non adiabatic splitting at SPS injection 20 ns5 ns Scrubbing with 25 ns beam allowed to lower the SEY of the dipole chambers well below the multipacting threshold for 50 ns  e-cloud free operation with 50 ns beams  Can we go to lower bunch spacing to scrub for 25 ns operation? Due to RF limitations in the PS it is impossible to inject bunch-to-bucket into the SPS with spacing shorter than 25 ns An alternative is to inject long bunches into the SPS and capturing each bunch in two neighboring buckets obtaining a (5+20) ns “hybrid” spacing

“Doublet” scrubbing beam: introduction Close to the threshold all the electrons produced after a bunch passage are absorbed before the next one  small accumulation over subsequent bunch passages PyECLOUD simulation Std 25 ns beam e-cloud enhancement mechanism:

More e - production and shorter e - decay  accumulation possible PyECLOUD simulation Std 25 ns beam Doublet beam e-cloud enhancement mechanism: “Doublet” scrubbing beam: introduction

“Doublet” scrubbing beam: SPS simulation results MBA dipole magnet MBB dipole magnet Significantly lower multipacting threshold for large enough intensity per doublet

“Doublet” scrubbing beam: SPS simulation results Significantly lower multipacting threshold for large enough intensity per doublet Beam orbit modulation needs to be applied to condition a wide enough area of the chamber MBB - 26GeV Intensity per bunch of the doublet (b.l. 4 ns ) (b.l. 3 ns)

First machine tests have been conducted at the SPS at the end of run in order to validate the production scheme and obtain first indications about the e-cloud enhancement The production scheme has been successfully tested for a train of (2x)72 bunches with 1.7e11 p per doublet Time [ms] 200 MHz RF Voltage [MV] st inj. Measurements by to T. Argyropoulos and J. Esteban Muller “Doublet” scrubbing beam: first test at the SPS

Time [ms] 200 MHz RF Voltage [MV] st inj.2 nd inj. Profile of the first doublet First machine tests have been conducted at the SPS at the end of run in order to validate the production scheme and obtain first indications about the e-cloud enhancement The production scheme has been successfully tested for a train of (2x)72 bunches with 1.7e11 p per doublet The possibility of injecting a second batch without degrading the circulating beam has also been shown

“Doublet” scrubbing beam: first test at the SPS Measurement Simulation First results looked very encouraging, e-cloud enhancement confirmed by: Measurements with the electron cloud detectors (agreement with measured cloud profile gives an important validation for our simulation model and code)

25ns std. (1.6e11p/bunch ) (1.6e11p/doublet) 25ns “doublet” “Doublet” scrubbing beam: first test at the SPS First results looked very encouraging, e-cloud enhancement confirmed by: Measurements with the electron cloud detectors (agreement with measured cloud profile gives an important validation for our simulation model and code) Dynamic pressure measurements observed in the SPS arcs

First results looked very encouraging, e-cloud enhancement confirmed by: Measurements with the electron cloud detectors (agreement with measured cloud profile gives an important validation for our simulation model and code) Dynamic pressure measurements observed in the SPS arcs “Doublet” scrubbing beam: first test at the SPS Provided that we can produce and preserve a good quality (multiple batches, large bunch intensity), this beam will be used during the two-day mini-scrubbing run at the end of the 2014 run  Acquired experience will be very important for the definition of the LIU-SPS strategy with respect to e-cloud and scrubbing and for the LHC scrubbing in 2015 To be noted Need to commission the new transverse damper for doublets at injection SPS BQM software was updated for doublet beams

Outline Introduction The 2014 SPS scrubbing run o Possible cycles o Scrubbing stages o Possible supercycle composition The doublet scrubbing beam o Motivation o Production scheme o Experience in MDs Scrubbing preparation o Beams from the PS o SPS setup o Measurements

Beam requirements From the PS: Before first scrubbing week (W45): 25 ns beam (std. production scheme and BCMS, 72 b., up to 1.5e11 ppb) 50 ns beam (std. production scheme, 36 b., up to 1.7e11 ppb) – as backup In addition, before second scrubbing block (W50): 25 ns beam for doublet production (>1.5e11 ppb, long bunches at extraction) From earlier SPS setup and MDs: Before first scrubbing week (W45): Basic setup (injection, orbit, working point, RF, damper) of 26 GeV flat bottom cycle (with 25 or 50 ns beams, Q20) Setup of 25 ns LHC filling cycle Before second block (W50): Setup of “doublet” beam at 26GeV (capture of multiple batches, orbit, working point, RF, damper) and possibly acceleration

Measurements Tests which compromise the scrubbing efficiency should be kept to the minimum possible Collect as much data as possible to learn about ecloud effects and scrubbing in the SPS BCT/FBCT (to estimate beam dose) Longitudinal parameters (BQM, mountain range, faraday cage scope) Beam transverse oscillations o BBQ, LHC BPMs, Headtail monitor, fast pickup from HBWD feedback setup, new digitizers on BPW exponential pickups Beam transverse size o Wirescanners (bunch by bunch), BGI (?) Pressure along the ring (1 Hz rate) o Special attention to the a-C coated magnets Dedicated e-cloud equipment o Electron cloud monitors (MBA StSt, MBB StSt, MBB a-C, MBB copper) o Shielded pickup o In situ SEY measurement (if available) o Removable StSt sample (for lab SEY measurement) o COLDEX

Summary and conclusions In the past, SPS was strongly limited by e-cloud Scrubbing proved to be an effective mitigation for 25 ns beams up to nominal intensity 25 ns beams delivered to LHC in 2012 were well within design report specs Scrubbing run 2014 To recondition SPS after LS1, since large parts of the SPS were vented 1 st block: 7 days (week 45) Qualify the loss of conditioning due to LS1 Recover 2012 performance with 25 ns beams 2 nd block: 2(3) days (week 50) Test scrubbing with doublet (also in view of LHC in 2015) Experience gained will be needed for LIU decision about SPS coating Need to prepare beams from the PS and test instrumentation in SPS

Thanks for your attention!

No additional impedance heating is expected with the doublet beam (same total intensity) – Beam power spectrum is modulated with cos 2 function – Lines in the spectrum can only be weakened by the modulation “Doublet” beam: beam induced heating Thanks to C. Zannini