EV CONTAINER CORPORATION - REVOLUTIONIZING THE BEVERAGE INDUSTRY EV Container Corporation EV EVkeg Purge & Fill for Brewers
EVKeg Purge – seal check & liner deployment - Set up a line with a resitance valve on the coupler outlet as shown - Open the keg valve and purge the keg EV Container Corporation
EVKeg Purge – seal check & liner deployment - Shut the outlet valve. The back pressure build up will open the liner in the keg - Once the liner is deployed, pressure will rise in the keg to the regulator set pressure - Shut off the cylinder valve. If the keg holds pressure the fitment seal is functional EV Container Corporation
EVKeg Purge – seal check & liner deployment - If pressure is lost, carefully remove the handle and reset the fitment seal EV Container Corporation
EVKeg Fill - Shut off the keg valve to hold the CO2 in the keg - Connect the fill coupler with a resistance valve and open the valve - Maintain a small back pressure on the outlet to ensure the liner remains deployed during filling EV Container Corporation
EVKeg Fill - When the liner is deployed and fully supported by the keg walls, the keg can be pressurized to the full operating pressure of 45PSI. EV Container Corporation
EVkeg – contact us EV Container Corporation 2148 Beechcraft Road Unit 300 Vacaville CA EV Container Corporation
EVkeg – made in the USA Thank you EV Container Corporation