ONR Presentation to NuLeAF Tanya MacLeod. Responsibilities Prime responsibility for the assessment and management of Flood and Coastal Risk on site rests.

Slides:



Advertisements
Similar presentations
Risk Assessment. Objectives By the end of this presentation you will know: What risk assessment is; Where the need for risk assessment comes from; and.
Advertisements

Nick Higginson Risk Assessment In The Workplace. Objectives By the end of this presentation you will know: What risk assessment is; Where the need for.
Energy National Policy Statements Anne Stuart DECC Energy Development Unit 22 October 2009.
Workplace Health and Safety Queensland New WHS Legislation Key aspects for the passenger transport industry Karen Bow, Principal Advisor Transport Strategy.
Vermont Yankee Presentation to VSNAP 7/17/13 VY/Entergy Fukushima Response Update Bernard Buteau.
In-depth look at ISACS Stockpile Management: Weapons Photo: MAG.
The Relationship between Nuclear Safety, Security and Safeguards
Remediation - A Time for Learning - A Time for Action presented by Mark Bassett, Sellafield Programme Director on behalf of Mike Weightman, Chief inspector.
Natural Coastal Resources - Wales A Future Vision for the Coast Monday 13 th January 2014 Louise Pennington Senior Coastal Advisor, Flood Risk Strategy.
Habitat Creation on the Severn Estuary Lyn Jenkins Flood and Coastal Risk Management South west Regional Habitat Creation Programme.
Energy National Policy Statements Nick Cooper DECC.
WORK HEALTH AND SAFETY ACT IMPLICATIONS FOR SMALL BUSINESS
NOAA/OAR Contributions to Natural Disaster Reductions and Risk Assessments John Gaynor Office of Weather and Air Quality Research And USWRP Interagency.
30 September 2008BRMF & SAFESPUR, Radioactive v Non-Radioactive Contamination 1 Regulatory Framework for Contaminated Land on Nuclear and Other Radioactively.
Protection Against Occupational Exposure
NSW Work Health & Safety Act
Climate change - environmental planning challenges Mark Southgate Head of Planning and Local Government.
Severn Tidal Power Feasibility Study Background to the study Terms of reference announced in January 08 Aim of the study: To enable Government to decide.
COastal REsearch & POlicy INTegration Working Together for Coastal Planning around the Severn Estuary Dr Tim Stojanovic, Cardiff University/COREPOINT project.
Environmental Impact Assessment (EIA): Overview
Technical Meeting on Evaluation Methodology for Nuclear Power Infrastructure Development December, 2008 Nuclear Safety in Infrastructure Building.
Environment Agency Presentation to NULeAF Aaron Dixey.
A Proposed Risk Management Regulatory Framework Commissioner George Apostolakis Presented at the Organization of Agreement States 2012 Annual Meeting Milwaukee,
Fatigue Management Rule Russell Smith Nuclear Energy Institute (NEI)
Internal Control in a Financial Statement Audit
9 SEPTEMBER 2015 – KATHERINE MORRIS AND LUCY BOCHENEK Is it possible to comply with the safety aspects of the Petroleum & Gas (Production & Safety) Act.
What about Japan?. Unit 1 Unit 2 Unit 3 Unit 4 Unit 5 Unit 6.
Generally Accepted Recordkeeping Principles Generally Accepted Recordkeeping Principles ® Registered Trademark of ARMA International.
An Introduction to the Severn Estuary Partnership: Collaboration and Joint Approaches Paul Parker Severn Estuary Partnership Engagement Officer
TWG-NPPIC, May 2009, Vienna: UK status1 Current status of NPP I&C in the United Kingdom T P Smyth AMEC, Knutsford, Cheshire, UK 22 nd Meeting of the Technical.
Transitioning to the New Built Environment (Track 3) -Regional Perspective- Cliff Sinnott, Executive Director Rockingham Planning Commission.
Hazards Identification and Risk Assessment
Clean-up of former nuclear sites and the role of the Planning regime Jim Cochrane.
POVT Managing Authority A sound Internal Control System A challenge for the period.
Climate Change Risk Assessment Tool. Weather & Climate.
Main Requirements on Different Stages of the Licensing Process for New Nuclear Facilities Module 4.5/1 Design Geoff Vaughan University of Central Lancashire,
Discussion Topic 2 Discussions TOPIC 1: Air quality plans for complying with target values Action plans where risk of exceedence of alert threshold values.
MODULE “PROJECT MANAGEMENT AND CONTROL” WASTE MANAGEMENT SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP , Programme “Leonardo.
56th Regular Session of the IAEA General Conference
Environmental Toolbox. Technical Module Introduction.
Building Resilience Well-being of Future Generations Act and the Environment (Wales) Bill Emily Finney – Resilience Policy, Welsh Government.
Workers Comp Overview & Accident Investigations
Health and Safety Everyone’s responsibility
Assessing the Risk and Vulnerability of NH Coastal Communities to Sea Level Rise and Storm Surge FROM TIDES TO STORMS: PREPARING FOR NEW HAMPSHIRE’S FUTURE.
River Basin Management Planning Cath Preston Senior Planning Officer (River Basin Planning) 2 nd March 2006.
FLOODS IN GHANA June 5, 2015 Walter Hays, Global Alliance for Disaster Reduction, Vienna, Virginia, USA Walter Hays, Global Alliance for Disaster Reduction,
Engineering Perspectives – Towards Structural Change Jackie Kepke, P.E. Workshop on Climate, Society, and Technology June 7, 2011.
Policy Background Roger White Head of Policy. Aberdeenshire Council – Vision Serving Aberdeenshire from mountain to sea – the very best of Scotland The.
An Overview of Coastal Management Issues Overview and Scrutiny Co-ordinating and Call-in Committee, 10 March Andrew Wainwright, Environmental Health.
It Is a Moral Issue – Why We Should Say ‘No’ to Nuclear Andrew Blowers Presentation at Thornbury, November 2010.
By Annick Carnino (former Director of IAEA Division of Nuclear Installations Safety) PIME, February , 2012.
Testing Requirements in the Boiler House Requirements for regular testing will vary according to national regulations, and the type of equipment installed.
1.9. Safety assessment “School for Drafting Regulations on Radiation Safety, IAEA - Module 1 Regulatory framework for safety, authorization and inspection.
Chapter 6 Internal Control in a Financial Statement Audit McGraw-Hill/IrwinCopyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved.
FLEX Mitigation Strategies Overview (Rec 4.2) Fukushima Regulatory Response Workshop April 5, 2012.
OH&S Management System
COLLABORATION IN CLIMATE POLICY ASSESSMENT:IRELAND AT RISK(Homework 6)
Nuclear decommissioning: Turning waste into Wealth
STRESS TESTS and TAIWAN PEER REVIEW PROCESS
Joseph D. Anderson, Chief
Mitigation of Beyond Design Basis Events (MBDBE) Rule Implementation
OH&S Management System
Autonomous Robotics in the Nuclear Industry
National Arrangements for Response to Transport Emergencies.
Severn Tidal Power Feasibility Study
IAEA General Conference Regulatory Cooperation Forum Regulatory Approach Prescriptive vs Performance Based David Senior Executive Director -
UNIT-V ELEMENT OF BUILDINGS.
Nuclear Emergency Planning and Preparedness
Nuclear Emergency Planning Chinese Experience
Client duties on CDM Regulation 2015
Presentation transcript:

ONR Presentation to NuLeAF Tanya MacLeod

Responsibilities Prime responsibility for the assessment and management of Flood and Coastal Risk on site rests with the ‘duty holder’ – i.e. the Licensee ONR is responsible for regulating nuclear safety on nuclear licensed sites, including the safety implications associated with hazards arising from flood and coastal erosion. The EA is the principal flood risk management authority in England providing a strategic overview relating to all forms of flood risk (SEPA, NRW).

About ONR – the work we do The Office for Nuclear Regulation's mission is to provide efficient and effective regulation of the nuclear industry, holding it to account on behalf of the public. ONR regulates 37 nuclear licensed sites across England, Scotland and Wales ONR is responsible for the regulation of nuclear safety, security, safeguards, transport, and conventional health and safety at licensed sites Protection from flood hazards is a well established part of ensuring safety at nuclear sites in the UK.

Protecting Nuclear Sites The Licensee must set out how an acceptable level of safety will be achieved in a safety case. ONR’s expectations as set out in SAPs are: –Risks are As Low as Reasonably Practicable (ALARP) –Design Basis, this is a “1 in 10,000 /yr event” for natural hazards –There should also not be a disproportionate increase in risk for more extreme events –Margin and a defence-in-depth approach to safety are essential to ensuring minimal public and worker risk –Redundancy, Diversity, Segregation, Separation

Tolerability of Risk and ALARP ALARP = As Low as Reasonably Practicable “So Far as is Reasonably Practicable” is the primary legal requirement from the Health and Safety at Work Act, translated to ALARP in the SAPs (Safety Assessment Principles) Key references: Reducing risks protecting people: HSE’s decision making process (R2P2) The tolerability of risks from nuclear power stations (TOR) ONR SAPs (Safety Assessment Principles)

Assessment and Mitigation The safety case needs to consider still seawater levels, precipitation, storm surge, tides, tsunami, river flows and erosion and some of these will be affected by climate change. Local topography, bathymetry and shoreline management can all influence the nature of the hazard. Hierarchy of safety measures: Passive safety measures Automatically initiated active engineered safety measures. Active engineered safety measures that need to be manually brought into service in response to the fault. Administrative safety measures Mitigation safety measures Typical flood protection includes: Site platform level Sea-walls/sand dunes Site drainage and site topography Local protection such as damboards and building base height Forecasting and advanced warning systems Pumping out buildings in the event of water entry Most preferred Least preferred

Access Roads Shut-down reactors (Oldbury, etc): no immediate or short term actions (i.e. within a few weeks) are necessary to ensure adequate fuel cooling should a flooding event occur Access roads may become flooded. This is not considered a major issue because, if flooded by the sea, the tidal cycle over these timescales will typically naturally render the site accessible (although impoundment is possible). Generally AGR and Magnox sites have a minimum of 24 hours (driving towards 72 hours) before they claim any need for off-site assistance following severe loss of safety -critical equipment. Mobile equipment held off-site: e.g. ATV's designed to drive through water, mobile cranes for access and site clearance, etc

Learning from Experience Post-Fukushima Review Completed Recommendation IR-10: The UK nuclear industry should initiate a review of flooding studies, including from tsunamis, in light of the Japanese experience, to confirm the design basis and margins for flooding at UK nuclear sites, and whether there is a need to improve further site- specific flood risk assessments as part of the periodic safety review programme, and for any new reactors. This should include sea-level protection. Supporting off-site infrastructure is also at risk from natural hazards and nuclear sites need to ensure adequate self sufficiency in the event of loss of off-site services etc (e.g. see IR-8)

New Build Sites 8 proposed nuclear new build sites in the UK to be sited along the coast 5 of these are at least partially in Flood Zone 3 – High Risk* Strategic level assessments carried out by EA suggest that all potential new sites identified in the National Policy Statement for nuclear power plants in England and Wales could potentially be protected from flooding. *Key reference: DECC, National Policy Statement for Nuclear Power Generation EN-6, July 2011