Section-07 of Chapter-V of KW&SB, Act 1996 describes following Major Functions of KW&SB:- UNDERTAKE BULK PRODUCTION, FILTERATION / TREATMENT TRANSMISSION.

Slides:



Advertisements
Similar presentations
DESIGN LAYOUT OF DISTRIBUTION SYSTEMS
Advertisements

I Situation of water supply and sewerage in Beijing 1. General situation of water supply business Beijing, the driest city in the world: Lack of water.
Donegal County Council – Presentation to Oireachtas Joint Committee on Environment Transport Culture and Gaeltacht County Donegal - Overview Population.
Sewage and Effluent Treatment 2-4 November 2002 Seán Moran -The first few slides.
Sustainable Management of Scarce Resources in the Coastal Zone SMART ICA3 – Kick-off Meeting CEDARE, Cairo, 5-6 January, 2003 Case Study Jordan.
Wastewater Treatment City of London. What is Wastewater? Water used in our communities and businesses leaves as wastewater to be treated and returned.
Where does the sludge go? grams per person per day Sludge handling/disposal accounts for 25-50% of the cost –Sludge treatment:- Convert organics.
Water Services Department Arizona Mexico Commission Bi-National Meeting March 9-11, 2008 David Cavazos Deputy City Manager Water Services Department Arizona.
Northern Ireland Water QUESTOR Centre, QUB. Introduction: UK Water Industry 25 water companies in England & Wales 12 water and sewerage providers 13 water.
PLAN FOR SEPTAGE MANGEMENT UNDER AGARTALA MUNICIPAL COUNCIL BY MILIND RAMTEKE, IAS CHIEF EXECUTIVE OFFICER AGARTALA MUNICIPAL COUNCIL AGARTALA, TRIPURA.
Improvement of the Capacity of Drinking Water Treatment Plant in East Quantara (Case Study) Dr. Eng. Ibrahim Khaled El-Sayed Chairman 1North & South Sinai.
STATE OF URBAN WATER SUPPLY & SANITATION SECTOR IN SINDH By Khalid M. Siddiqui DG UP&SP Sindh.
Water Treatment and Distribution in London. Lake Huron & Elgin Area Water Supply Systems London is supplied treated water through the Lake Huron Primary.
CE HYDRAULICS ENGINEERING
This project is co-funded by the European Union, the Russian Federation and the Republic of Finland Activity 4. Utilities network analysis (KRIMEL, KAEEC,
City of Atlanta Department of Watershed Management Bureau of Drinking Water.
Wastewater generation
Surface Reservoir Storage Operations 2011 Public Utilities Department Public Utilities Department ( (Water Operations Branch)
1 Topic I.11. Industrial Water Supply : Basic Systems and Schemes Industrial Water Use: §Cooling §Washing (production, premises) §Vapor generation §Transportation.
United Water & Sanitation District Stonegate Village Metro District Water Supply Opportunities 1.
University of Architecture, Civil Engineering and Geodesy Faculty of Hudrotechnics Speciality: Hydraulic Engineering (German language teaching course)
 Groundwater Supply ◦ Quantity ◦ Quality  Infrastructure ◦ Treatment ◦ Transmission ◦ Distribution  Response Plans ◦ Long-term ◦ Short-term ◦ Emergencies.
Gross capacity of the unit is 26 lakh liters of waste water per day It is working at 70% of the installed capacity, treating 15 lakh liters per day There.
Chicago Department of Water Management Thomas H. Powers, P.E. Commissioner Leadership Summit June 2, 2015.
Your Water System Sources of Water reservoir underground aquifer Energy Sources pumps gravity Distribution Network of Pipes.
PNCWA Operators Conference Eastern Oregon Region AWWA/PNCWA Short School Water Project of the Year City of Arlington Mesa Industrial Park Water System.
COUNTRY PAPER ON REUSE OF LOW QUALITY WATER IN EGYPT.
Water System Planning Study
Sidrat Asim Pakistan Urban Forum Willingness to Pay Study for Improved Water Supply Services in Karachi.
From Paddy and Timm.
VOLUSIA COUNTY PUBLIC WORKS DEPARTMENT WATER RESOURCES & UTILITIES DIVISION Mike Ulrich, Director Mike Ulrich, Director.
Future Water Supply - for the Ashley Valley D. Gerard Yates Central Utah Water Conservancy District.
Urban Water Department of Hydro Sciences, Institute for Urban Water Management Peter Krebs Dresden, Global water aspects 1 Introduction to urban.
SANITARY ENGINEERING 1 COURSE OUTLINE
Pelican Group of Lakes Improvement District Public Hearing on Facilities Plan Agenda Introduction of PGOLID Board of DirectorsDale Haakenstad Introduction.
Short and Long Range Water Supply Planning and Aquifer Performance Test (APT)
Asset Management: What It Means For Water Distribution Operability & Criticality December 09, 2008 Paul Schumi Wachs Utility Services.
Infrastructure management system Managers and engineers need clear guidelines for life-cycle management of infrastructure systems for water, sewer, and.
Outline Introduction. Population Analysis Study Area Objectives
An-Najah National University Civil Engineering Department
 Sanitation situation reflects the development of communities.  Health of people is also related to the sanitation situation.  Existing of sewerage.
Drinking Water 6 March 2013 Andy Case CEnv C.WEM BSc (Hons) MCIWEM.
CE 3372 Water Systems Design Lecture 005: Engineering Drawings.
Collecting, Processing and Distributing of Water Statistics in the Republic of Belarus Zhanna Vasilevskaya, Belarus International Work Session on Water.
1 NORTH VALLEY REGIONAL WATER AND WASTEWATER PROJECTS MEETING OF THE NEW MEXICO-TEXAS WATER COMMISSION May 19, 2005.
Community Water Supply Efficiency Improvements Preliminary Potential Estimates for the Seventh Power Plan October 14,
Sewerage Infrastructure Development in Sarawak
C ONNECTION OF POPULATION TO PUBLIC WATER SUPPLY Jana Jankova Desk officer of Department of State Administration of Water Management and River Basin Ministry.
Is composed by 54 artificial lakes 32 dams which provide Mmc of storage capacity 850 km of aqueducts 210 km conveyance canals 47 pumping plants 4.
2015 Eastern Oregon Region AWWA/PNCWA Operator’s Conference Water Project of the Year City of Stanfield’s Water System Improvements.
Comprehensive Planning & Infrastructure Interdependence Public Services.
1 EASTERN MUNICIPAL WATER DISTRICT Water Supply Strategic Plan Brian Jack Powell, P.E. Director of Planning June 17, 2015.
September 11, 2012 Water Resources Statistics of the Republic of Kazakhstan A. Yepbayeva, Director of Production Statistics and Environment Department.
WASTEWATER TREATMENT PETRIT TARE GENERAL DIRECTOR OF UKKO JSC CONFORMING TO EU WASTEWATER TREATMENT DIRECTIVE CASE STUDY OF KORCA CITY, ALBANIA.
Miami-Dade Water & Sewer Department Miami-Dade Water and Sewer Department |  1   Reuse, Every Drop Has Value Seminar FPL JPA.
Water Supply Municipal Water Demand Civil Engineering Department Faculty of Engineering and Technology The University of Jordan Instructor: Ghada Kassab,
Asset Degradation Modelling at Townsville Water
URBAN WATER DISTRIBUTION
Lecture (11): Water Distribution Systems
Recycled Water Project Basis of Design Report
EXERCISES Two water reservoirs are connected by a pipe 610m of 0.3m diameter, f’=0.038 and the flow produced by the difference in water surface elevations.
Hyderabad city water supply system
Prepared By : Kamal Hamaydeh Ahmad Odet-allah
North Texas Municipal Water District “Regional Service Through Unity … Meeting Our Region’s Needs Today and Tomorrow” Water Supplies Vital for the Future.
Wastewater Surcharge Reduction for Manufacturing Processes
Prepared By : Osama amr Qutayba mElhim
2 Days National Workshop on “National Building Code of India 2016 ”
The SWITCH Approach to Integrated Urban Water Management
Future Water Supply Evaluation
Sanitation Study and Wastewater Network System AL Tayba Village
Presentation transcript:

Section-07 of Chapter-V of KW&SB, Act 1996 describes following Major Functions of KW&SB:- UNDERTAKE BULK PRODUCTION, FILTERATION / TREATMENT TRANSMISSION AND RETAIL DISTRIBUTION PURIFYING OF WATER UNDER TAKE COLLECTION, PUMPING, TREATMENT & DISPOSAL OF SEWAGE & INDUSTRIAL WASTE BILLING AND COLLECTION OF WATER & SEWERAGE CHARGES INCLUDING ARREARS THERE OF MAJOR FUNCTIONS OF KW&SB

ORGANIZATIONAL SET UP KWSB BOARD CHAIRMAN Managing Director TechnicalFinanceAdmn.RevenuePlanning TOTAL Nos. OF EMPLOYEES, 13030

AREA OF JURISDICTION AREA WITH KW&SB PRIOR TO DEVOLUTION 1000 km 2 PRESENT AREA 2600 km 2 COUNCILS OF GHARO & DHABEJI ADDED

The population of Karachi was 0.3 Million in After independence, due to high influx of migrants from India and other parts of the country, the City’s population increased exponentially. The average annual population growth rate in Karachi is 4.15%. The KSDP Plan 2020 indicates the population of Karachi 15.2 Million in 2005 and projected population in 2020 as 27.5 Million. DEVELOPMENT OF KARACHI CITY

32,506 15,120 Source: Karachi Strategic Development Plan 2020 (KSDP-2020) 27,550 FUTURE POPULATION OF KARACHI

Water is being supplied to Karachi from a considerably distant located water source through bulk conveyance system comprising of a complex network of canals, conduits, siphons, multi-stage pumping and filtration

K-III 100 MGD (0.45Mm 3 /day) WATER SUPPLY PROJECT COMPLETED IN 2006

RAW WATER TRANSMISSION Canals, conduits(3.3mx3.3m RCC), siphons/Pipelines(2100~1800mm),Bulk Supply Pumping Stations(24~35 mgd one unit) FILTER WATER TRANSMISSION Filter Plants, Transmission Mains(1600~ 900 mm) Secondary Level Pumping Stations(5~15mgd one unit) WATER DISTRIBUTION Area wise distribution Mains (600~ 75mm) emerging from trunk mains,small pumping stations WATER SUPPLY SYSTEM

 155 WATER PUMPING STATIONS  25 BULK WATER RESERVOIRS & ALLIED INSTALLATIONS  08 WATER FILTER PLANTS AND 03 SEWERAGE TREATMENT PLANTS.  20 SEWERAGE PUMPING STATIONS  11,000 KM OF PIPELINES AND 25,000,000 PIPELINE JOINTS, 110 KMS OF CANALS  1100 MILLION GALLONS OF FLUID (WATER & SEWERAGE)  400,000 VALVES SCALE OF SERVICES TO MANAGE & MAINTAIN

POPULATION 18 MILLION MAXIMUM WATER DEMAND 54 gpcd)972 MGD MINIMUM DEMAND 30 – 54 gpcd) [Av: 42 gpcd]756 MGD AVAILABLE SUPPLY680 MGD  INDUS SOURCE (KINGER LAKE SURFACE WATER) -Greater Karachi280 mgd -Gharo 28 mgd -K-II100 mgd -Additional 40 mgd578 MGD -K-III100 mgd -Steel Mill 22 mgd -PQA 08 mgd  HUB DAM (SURFACE WATER) 100 MGD  DUMLOTTEE WELLS (GROUND WATER) 2 MGD TOTAL :680 MGD WATER SUPPLY

DEMAND AND SUPPLY GAP AT THE RATE OF 54 GPCD FOR 18 MILLION POPULATION

Widening demand and supply gap Delay in sanction of additional 1200 cusec water quota from Indus source Delay in execution of K-IV water project.

SEWERAGE SYSTEM SEWAGE GENERATED IN CITY472 MGD (70% OF WATER SUPPLIED) OPTIMUM DESIGN CAPACITY OF151 MGD SEWERAGE TREATMENT PLANTS QUANTITY OF SEWAGE TREATED55 MGD SHORTFALL IN SEWAGE TREATMENT CAPACITY321 MGD UNTREATED SEWAGE417 MDG

SEWAGE TREATMENT PLANT 0 mgd 35 mgd 55 mgd

INVENTORY OF SEWERAGE SYSTEM  SEWERAGE TREATMENT PLANTS 3 Nos.  MAJOR SEWERAGE PUMPING STATIONS 6 Nos.  SEWERAGE LIFT PUMPING STATIONS 32 Nos.  SEWER CLEANING MACHNIES 46 Nos.  Suction Machines 23 Nos.  Jetting Machines 23 Nos.  TOTAL LENGTH OF SEWERS5670 Kms  NUMBER OF MANHOLES300,000 NOS.