How do different tools support long-term energy planning?

Slides:



Advertisements
Similar presentations
Transparent, Repeatable, Defendable, and Published Generation, Transmission & Nat Gas Network Co-Optimizations
Advertisements

Software Analysis Tools
March 26, 2014 Transmission Coordination and Planning Committee 2014 Q1 Stakeholder Meeting.
New market instruments for RES-E to meet the 20/20/20 targets Sophie Dourlens-Quaranta, Technofi (Market4RES WP4 leader) Market4RES public kick-off Brussels,
Coordinated Competitive Regional Renewable Power Procurement New England States Committee on Electricity May 16, 2013 Massachusetts Wind Working Group.
Challenge of Large Scale Wind Power Integration - Introduction to the Workshop Pradeep Perera Principal Energy Specialist Asian Development Bank.
Approaches to improve long-term models Falko Ueckerdt, IRENA consultant Expert Workshop, 2-3 March 2015, Bonn, IRENA IITC Addressing Variable Renewables.
Planning challenges for RE Deployment North African perspective Addressing Variable Renewables in Long-Term Energy Planning (AVRIL) : 2-3 March 2015 Rim.
Jim Mcintosh Director, Executive Operations Advisor California ISO Independent Energy Producers 2011 Annual Meeting - October 5, 2011 Stanford Sierra Conference.
Introduction, objective and scope of the meeting Addressing variable renewables in long-term energy planning (AVRIL) March 2-3, 2015, Bonn, Germany.
1 March 2-3, 2015, Bonn Expert workshop Addressing Variable Renewables In Long‐Term Energy Planning (AVRIL) Renewables Energy Integration In Long‐Term.
Power Systems Consulting and Software 4 March 2004 BWEA Conference: UK Offshore Wind 2004 Integration of Offshore Wind Farms into the Local Distribution.
United Nations Development Programme Technical Support to Non-Annex I Parties for the Preparation of National Communications Bo Lim SBI 18, Bonn, 9 June.
Hybrid power systems and renewable energy: Prospects from the IRENA point of view Roland Roesch IRENA Innovation and Technology Centre (IITC)
Preliminary Analysis of the SEE Future Infrastructure Development Plan and REM Benefits.
Least Cost System Operation: Economic Dispatch 1
EMPIRE- modelling the future European power system under different climate policies Asgeir Tomasgard, Christian Skar, Gerard Doorman, Bjørn H. Bakken,
1 Docket 7081 Transmission Planning Information Workshops Third Workshop September 30, 2005 Shaping Demand-Side Resources To Address Transmission Constraints.
Estonian energy scenarios Reference and single track scenarios in Balmorel.
Estonian energy scenarios The first Balmorel model runs.
Black Sea Regional Transmission Planning Project By Predrag Mikša EKC - Electricity Coordinating Center Istanbul, March 2011.
IAEA International Atomic Energy Agency IAEA's Capacity Building for Sustainable Energy Development Mr. Mario TOT Department of Nuclear Energy Planning.
New Approaches to Adaptive Water Management under Uncertainty Waterwise – setting up for regional application Paul van Walsum.
Advanced Model Development and Validation for the Improved Analysis of Costs and Impacts of Mitigation Policies The research leading to these results has.
California Energy Commission IEPR Lead Commissioner Workshop University of California, Irvine August 17,
Wholesale Market Subcommittee Texas Interconnection Long-Term Study Update Warren P. Lasher April 8, 2011.
November 12, 2010 Regional Planning Group Long-Term System Assessment Project Update Warren Lasher Manager, Long-Term Planning and Policy Jonathan Rose.
The Role of Energy Storage as a Renewable Integration Solution under a 50% RPS Joint California Energy Commission and California Public Utilities Commission.
THE VIEWS OF THE RUSSIAN FEDERATION ON THE 5-YEAR WORK PROGRAM ON ADAPTATION TO CLIMATE CHANGE The In-Session Workshop, 22 nd Session of SBSTA Bonn, 21.
Thirault France Session 4 – Block 4.4 Barcelona May A Dynamic Programming Algorithm for the Design of dispersed generation center adapted.
Optimal Power Flow- Basic Requirements For Real Life.
Long Term Study Task Force Update ERCOT Long-Term Study Scenarios January 13, 2012.
On/Off Operation of Carbon Capture Systems in the Dynamic Electric Grid On/Off Operation of Carbon Capture Systems in the Dynamic Electric Grid Rochelle.
ERCOT TAC11/2/ CREZ Study Update ERCOT TAC 11/2/2006.
Updated 1/28/2011. Renewables Integration Plans and Challenges March 8, 2011 Jay Caspary ·
Value of the interconnectors in the Nordic countries Jacopo Tattini, Maurizio Gargiulo PhD Student at Energy System Analysis Group System Analysis Division.
Integrated Transmission and Resource Assessment Byron Woertz Manager, System Adequacy Planning W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Integrated Transmission and Resource Assessment Byron Woertz Manager, System Adequacy Planning W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
RPG: September 24, Long-Term System Assessment Introduction Jeff Billo, Manager, Transmission Planning September 2013 Regional Planning Group.
Coordinated Planning Concept (For Discussion Only) revised 11/30/04 07/01/04.
Panhandle Renewable Energy Zone (PREZ) Study
Long Term Transmission Integration Planning at the California ISO Intermittency Analysis Project (IAP) Energy Commission Staff Workshop February 13, 2007.
2006 Reliability Study James Manning Bryan Guy May 12, 2006.
ERCOT PUBLIC LTSA Introduction. ERCOT PUBLIC 2 Outline  Background  2016 LTSA Process  2016 Scenario Development Process  2016 LTSA Schedule.
AB 32 Update December 6, Outline Cap and Trade Program 2013 Update to Scoping Plan Looking ahead to
03/06/2008 TAC CREZ Transmission Optimization (CTO) Study Update Dan Woodfin Director, System Planning.
Planning the Networked Grid Transmission Planning J.E.(Jeff) Billinton Manager, Regional Transmission - North Building the Networked Electricity Grid –
2006 Preliminary Reliability Study Results Bryan Guy September 7, 2006.
This project has received funding from the European Union’s Horizon2020 research and Innovation programme under grant agreement No
Research Progress Discussions of Coordinated Emissions Research Suggestions to Guide this Initiative Focus on research emission inventories Do not interfere.
4/16/2010 Regional Planning Group Meeting Long-Term Planning Study of the ERCOT Interconnection Warren Lasher Manager, System Assessment.
CREPC/WIRAB Meeting April 27, 2016 Salt Lake City, UT Thomas Carr Western Interstate Energy Board Evolution of Grid Planning in the West.
Multiscale energy models for designing energy systems with electric vehicles André Pina 16/06/2010.
THE ART OF THE POSSIBLE: IRP CONSIDERING STATE-WIDE AND REGIONAL PERSPECTIVES IN INTEGRATED RESOURCE PLANNING Horizons Energy Indiana Contemporary Issues.
Analysis of the Effects of a Flexible Ramping Ancillary Service Product on Power System Operations Ibrahim Krad Eduardo Ibanez Erik Ela.
GENESYS Redevelopment Strawman Proposal
WG1: RELIABLE, ECONOMIC AND EFFICIENT SMART GRID SYSTEM
Planning Tools Overview
پروتكل آموزش سلامت به مددجو
Reliability Assessment Committee Reliability Workshop Priorities
RE Grid Integration Study with India
Transforming Scenario Narratives into Study Cases
Context: Scenario Studies
VDL Mode 4 Performance Simulator (DLS enhancements) presented by EUROCONTROL Montreal, 26 October 2004.
Long Term Grid Assessment – Preparing for 2018 Studies
Context: Scenario Studies
Reliability Assessment Committee Reliability Workshop Priorities
Planning Tools Overview
VDL Mode 4 Performance Simulator (DLS enhancements) presented by EUROCONTROL Montreal, 26 October 2004.
Presentation transcript:

How do different tools support long-term energy planning? Falko Ueckerdt, IRENA consultant Expert Workshop, 2-3 March 2015, Bonn, IRENA IITC   Addressing Variable Renewables in Long-Term Planning (AVRIL)

Long-term planning models are the focus of AVRIL Capacity expansion OSeMOSYS Ireland Typical models used in the focus countries are WASP, MESSAGE, TIMES, OSeMOSYS, BALMOREL Linear capacity expansion models with 1-36 regions, temporal resolution of 1-5 years and 8-288 time slices (typically 12) Intertemporal optimization for a time horizon of about 20-30 years 36 regions in the JRC-EU-TIMES

Different tools, different purposes, different time horizons Different tools, different purposes, different time horizons. How do they need to support the long-term planning? More detail Stability analysis (scope: sec.) ? Steady state Short term Load flow analysis (static – 8760h) Dispatch Mid term Generation (transmission) capacities of a given year Time horizon Production cost models (scope: days-years) What is the optimal generation capacity expansion?  master plan, policy instruments, utility investments Traditionally, subordinated to this: transmission planning. Shorter time horizon. Calculate an hourly dispatch. Sufficient flexibility? Steady state adequacy of the transmission grid. These analysis are used for current and future systems. Can the system cope with disturbances and failures? Traditionally, the more detailed tools were applied to a shorter time horizon. Generation capacity expansion with a long time horizon was somewhat independent from grid planning. With high VRE shares, this might change. Sivael is a simulation tool used for load flow analysis (8760h), developed and used by the danish TSO. What about short term grid planning? Transmission planning (~3-20y) Deriving future grid structures based on geografical data. (input to a load flow analysis) Generation expansion, Net transfer capacities Long term Long-term planning model (time horizon ~20-30y) Long-term planning updated every few years Less detail 2015 2020 2030 2040 Adapted from Manuel Welsch

Different tools, different purposes, different time horizons Different tools, different purposes, different time horizons. How do they need to support the long-term planning? More detail Stability analysis (scope: sec.) All tools are needed. With high VRE shares the analyses need to be more concerted. Better coordination of generation and transmission planning Production cost models need to inform LT planning models Are highly resolved analyses (production costs, grid studies) sensible for future years (>2025)? Given uncertainty and technological progress Simple approaches to assure system stability Short term Load flow analysis (static – 8760h) Mid term Time horizon Production cost models (scope: days-years) What is the optimal generation capacity expansion?  master plan, policy instruments, utility investments Traditionally, subordinated to this: transmission planning. Shorter time horizon. Calculate an hourly dispatch. Sufficient flexibility? Steady state adequacy of the transmission grid. These analysis are used for current and future systems. Can the system cope with disturbances and failures? Traditionally, the more detailed tools were applied to a shorter time horizon. Generation capacity expansion with a long time horizon was somewhat independent from grid planning. With high VRE shares, this might change. Sivael is a simulation tool used for load flow analysis (8760h), developed and used by the danish TSO. What about short term grid planning? Transmission planning (~3-20y) Deriving future grid structures based on geografical data. (input to a load flow analysis) Long term Long-term planning model (time horizon ~20-30y) Long-term planning updated every few years Less detail 2015 2020 2030 2040 Adapted from Manuel Welsch