AESO Update to PCC October 7, 2014. 2 AESO October 2014 Update The AESO has published 20 year regional plans on its website –Forecasting 2.4% overall.

Slides:



Advertisements
Similar presentations
WECC Operating Committee Report WECC Member Meeting April 20, 2006.
Advertisements

Northern Tier Transmission Group SPG Report to TEPPC June 17, 2010 Denver To ensure efficient, effective, coordinated use & expansion of the members transmission.
TransWest Express and Gateway South WECC Planning Coordination Committee David Smith, National Grid October 25-26, 2007 Vancouver, B.C.
Intertie Restoration Update September 15, Intertie Restoration Recommendation Paper Expected to be released by the end of September Will be released.
March 26, 2014 Transmission Coordination and Planning Committee 2014 Q1 Stakeholder Meeting.
Jan 22, 2013 RPG Meeting Sharyland Atlas-Driver Load Integration Project – EIR update.
Steve Rueckert Director of Standards Standards Update June 5, 2014 Joint Guidance Committee Meeting Salt Lake City, UT.
Reliable Power Reliable Markets Reliable People Challenges and Opportunities in the Power Industry in Alberta CERI Conference October 22 & 23, 2007 Warren.
Electricity planning and approval in Alberta Laura Bowman staff lawyer Environmental Law Centre January 7, 2010 Bill 50.
Public Service Company of New Mexico
NTTG Economic Study and Biennial Study Update NTTG Economic Study and Biennial Study Update NTTG Study Cycle.
TERRACE TO KITIMAT TRANSMISSION PROJECT UPDATE Feb/March 2015.
 2005 Pinnacle West Capital Corporation Palo Verde Hub Participant Meeting May 27, 2005 Arizona Public Service Company Tom Glock – Manager Power Operations.
Ad Hoc West-wide Resource Assessment Team (WRAT) : Assessment of Western System Adequacy in the Short-term Jeff King Northwest Power Planning Council Presentation.
Reliable Power Reliable Markets Reliable People Future Demand and Energy Outlook (2008 – 2028) Assumptions, Methodology and Processes April 2, am.
THE POWER OF POSSIBILITY Electric Transmission System Development in Alberta Neil J. Brausen, P. Eng., Director System Planning APEGGA Calgary Branch Luncheon.
WECC PCC Meeting Salt Lake City, UT March 26, 2014.
Reliable Power Reliable Markets Reliable People 24 Month Reliability Outlook Stakeholder Information Session Tuesday, January 19, 2010 Jerry Mossing and.
Stakeholder Information Update Edmonton-Calgary 500 kV Transmission Development December 14, 2005 Introduction Neil Millar, vice-president, Transmission.
AESO Update to PCC July 16, AESO July 2014 Update The AESO published its updated long-term plan on Jan 31 st, 2014 –Forecasting 2.4% overall load.
ColumbiaGrid Planning Update to PCC Marv Landauer October 7, 2014.
RASRS Report to Operating Committee July 15, 2015 Milt Patzkowski, Vice-Chair Remedial Action Scheme W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
© 2000 PACIFICORP | PAGE 1 WYOMING WEST AREA STUDY DECEMBER 2013 Seongtae Kim/Jeremy Viula.
Stakeholder Information Update Edmonton-Calgary 500 kV Transmission Development September 29, 2005 Introduction Neil Millar, vice-president, Transmission.
Sea Breeze Pacific Regional Transmission System Juan de Fuca Cable & West Coast Cable Keys to West Coast Transmission Progress.
FRCC Seasonal Transmission Assessment & Operational Seasonal Study Winter 2012.
Wyoming Infrastructure Authority Developing Electric Infrastructure for the Future of the West Energy Gateway Update Presented by Darrell T. Gerrard Vice.
APPA RELIABILITY STANDARDS & COMPLIANCE SYMPOSIUM Case Study: City Utilities of Springfield, MO January 11, 2007.
Reliable Power Reliable Markets Reliable People Performance Targets for the Customer Interconnection Process January, 2008.
Arizona ACC Biennial Transmission Assessment Navajo Transmission Project Update May 22, 2008 Presentation by Ben Hoisington Project Administrator, DPA.
Energy Gateway Update for Wyoming Infrastructure Authority January 27, 2009 Darrell Gerrard Vice President Transmission System Planning.
Victoria L. Ravenscroft Senior Policy Analyst Reliability Planning and Performance Analysis Information Sharing Policy Update March 25-26, 2014 Standing.
Powering Alberta AESO Annual General Meeting May 14, 2009 Reliable Power Reliable Markets Reliable People.
February 26, 2013 Board of Directors Meeting 2012 ERCOT Region Reliability Update.
PJM©2010 PJM Regional Transmission Planning Experience Andrew Ott Senior Vice President, Markets 2010 NASUCA Mid-Year Meeting June 15, 2010.
Large Generator Interconnection Procedures Reform 2 nd Stakeholder Meeting May 5, 2009.
Local Area Study Local Area Study Mitigation Plan Update and Uncertainty Scenarios
Presentation Title SOUTHERN CALIFORNIA EDISON® SM SOUTHERN CALIFORNIA EDISON® SM IEPR Workshop Southern California Reliability: Transmission System Additions.
Current Export Initiatives Jerry Mossing Exports Workshop February, 16,2006, Metropolitan Center, Calgary.
AESO Update to PCC March, AESO March 2014 Update The AESO published its updated long-term plan on Jan 31 st, 2014 –Forecasting 2.4% overall load.
Relationship of Regional Resource Adequacy Standards to Utility Planning PNW Resource Adequacy Steering Committee Meeting June 27, 2007.
Southwest Renewable Energy Transmission Conference May 21, 2010 This report contains transmission planning data that may be conceptual in nature and is.
Providing Resource Planning Guidance to Individual Utilities PNW Resource Adequacy Technical Committee Meeting June 20, 2007.
Reliable Power Reliable Markets Reliable People Hanna Region Transmission Development Ramaiah Divi, P.Eng Manager, Central System Planning.
Yellowhead Area Transmission System Development
George Zhou, VGITF Chair October 14, 2015 Salt Lake City, Utah Variable Generation Interconnection Task Force Update to PCC.
RiversidePublicUtilities.com Arts & Innovation RiversidePublicUtilities.com MOD GENERATOR TESTING REQUIREMENTS RESOURCE PLANNERS LeeAnne Uhler, Regulatory.
© 2000 PACIFICORP | PAGE 1 SOUTHWEST UTAH AREA STUDY SEPTEMBER 2014 Nathan Wilson/Talmage Daley Need to review the LOADS before Friday.
THE POWER OF POSSIBILITY AESO current limits for Alberta-BC transfers Jeff Palermo – KEMA/AESO.
AESO Update to PCC October 15, AESO October 2015 Update AESO currently developing 2015 Long-term Plan –Exploring low growth scenario corresponding.
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N 1 5/09/2011 West of Cascades – North (WOCN) Path BPA Studies Path Definition (for studies) 
Impact of Hurricane Ike on CenterPoint Energy’s Transmission System Paul Rocha Director, Transmission Planning Presented at October 2, 2008 ERCOT TAC Meeting.
Sixth Northwest Conservation & Electric Power Plan Draft Wholesale Power Price Forecasts Maury Galbraith Generating Resource Advisory Committee Meeting.
RASRS Report to Operating Committee March 21, 2017
Impact of Hurricane Ike on
TAS Quarterly Meeting November 2-3, 2016 Michael Bailey, P.E. WECC
Eleanor Ewry Base Case Coordination Subgroup Chair
Nick Hatton Associate Engineer March 9, 2017
Outline Modeling Issue 2017 Modeling Goals
SunZia Project Description
TAS Quarterly Meeting November 2-3, 2016 Michael Bailey, P.E. WECC
How the Missouri River is Operated - WAPA’s Role - Mid-West Electric Consumer Association Annual Meeting December 11, 2018 | Denver, CO Lori L. Frisk VP,
Still a lot of solar in the queue
2018 RTEP Report Key Maps, Tables & Figures
Montpelier & Powder River 5-year Studies
ColumbiaGrid Planning Update to PCC Marv Landauer October 7, 2014
AESO Update to PCC October 7, 2014.
AESO Update to PCC July 16, 2015.
Information Sharing Policy Update March 25-26, 2014
Sustainable Agricultural Lands Conservation Program
Presentation transcript:

AESO Update to PCC October 7, 2014

2 AESO October 2014 Update The AESO has published 20 year regional plans on its website –Forecasting 2.4% overall load growth over the planning horizon, 3.5% in the oil sands region The AESO has received bids from 4 entities for the 500 kV Fort McMurray West project –The successful entity will be selected in Dec 2014 with a target in-service date of 2019 for the 500 kV line Path 1 Operational limits increased in 2014 –Winter import limit increased to 830 MW –Summer import limit increased to 800 MW

AESO October 2014 Update Chapel Rock 500/240 kV Substation –TFO preparing the facilities application –Anticipated in service date is now 2018 –WECC Path Rating process for Path 1 will be initiated soon AESO continues to work with BC Hydro on joint studies to identify infrastructure and/or market products required to restore Path 1 to its current WECC Catalog path rating (1200 MW import, 1000 MW export) –Currently AESO and BC Hydro are reviewing each other’s draft reports Application to redefine Path 1 was approved by WECC –Name change from Langdon to Bennett 3

Thank you