May 3, 2015
We Are All In! We are stepping out in faith There is a plan to obtain needed funding There will be no “part way” The final timeframe and the final building size still remain to be determined based on fundraising progress
Building Size and Cost Building costs estimated using professional estimation methods Costs include the building itself, site preparation, and a contingency fund Congregation could achieve all current functions and missions in ~13,500 ft 2 Minimum total cost is ~$2.7M
Financial Plan – $2.7M Assumptions Conservative estimates throughout No change in congregational size Current giving must be able to fund new mortgage payment Not everybody turned in a Consideration Card Fundraising will occur over a 3 year period
Financial Plan – $2.7M
$315,000 Required in Fundraising Above the Consideration Cards (returned and unreturned) Represents a significant challenge Can be achieved How will we get there?
Fundraising Plan It’s all about you! It’s not all about giving financially! Over The Top Giving! Additional Considerations / Commitments Anything over our Budget Special gifts to achieve specific goals Events Ideas from you!
Fundraising Plan Other ways to achieve the goal Extending fundraising period Increased mortgage amount Bonds (as a last resort)
Next Steps Turning Considerations into Commitments Fulfill the Commitment Finish the Building Design Begin City / County Planning and Approvals Break Ground
Commitment Cards