 Presented By: NameTitleOffice PresentationTitle Michelle G. Bulls Director Director Office of Policy for Extramural Research Administration, OER NIH.

Slides:



Advertisements
Similar presentations
© 2014 University of New Hampshire. All rights reserved. Uniform Guidance Highlights What you really need to know.
Advertisements

Rules Governing Sponsored Projects (aka OMB Circulars) Presented by Beverly Blakeney, Diane Cummings and Julie Macy.
OMB Uniform Guidance 2 CFR Part 200.  The final guidance was issued on December 26, 2013 and supersedes and streamlines requirements from OMB Circulars.
Washington University Washington University Hilltop Campus Research Administrators Forum October 2002.
1. An Introductory Look at the New Omni-Circular Big changes have arrived! Uniform Administrative Requirements, Cost Principles, and Audit Requirements.
The Uniform Guidance: A Top Ten List
Introduction to Uniform Guidance Presented to Engineering Research Network – Nov 19, 2014 by Sponsored Programs Accounting.
OMB Uniform Guidance Faculty Presentation Chris G. Green, CPA Director, Sponsored Programs.
New Uniform Guidance Combines the requirements of OMB Circulars A-21, A-87, A-110, A-122, A-89, A-102, A-133, and A-50 into a streamlined format. *NOTE:
INDIRECT COST BASICS Presented by Gene Fornecker, CPA DPI School Finance Auditor.
Grant Guidance Changes
Presented by Edward A. Hofma, CPA, CGMA Principal in the CPA firm of Averett Warmus Durkee, PA 1417 East Concord Street Orlando, Florida (407) 849.
DEPARTMENT OF HEALTH & HUMAN SERVICES DIVISION OF COST ALLOCATION Presenters: Steven J. Zuraf, Branch Chief for Colleges/Universities, Non-Profits & Hospitals.
1 2 CFR Part 200 Uniform Guidance -- History & New Structure Steve Bradley, Director.
Uniform Guidance: Summary of Significant Changes 2 CFR PART 200—UNIFORM ADMINISTRATIVE REQUIREMENTS, COST PRINCIPLES, AND AUDIT REQUIREMENTS FOR FEDERAL.
Managing Your Grant: A Roadmap to the Finish Line Carol Gelormine Manager of Grant Accounting Division of Finance & Treasury Catherine Bruno Post-Award.
Implementing the Uniform Guidance U.S. Department of Education.
Application of the Uniform Guidance Andra Sawyer Compliance Analyst Research Accounting & Analysis MRAM 12 March 2015.
Indirect Cost Presented by Bonita Brown HMEP Grant Program
 Presented By: NameTitleOffice PresentationTitle February 24, 2015 Samuel Ashe, Grants Policy Analyst Office of Policy for Extramural Research Administration,
Circular A-110 Everything You Didn’t Want to Know.
UNIFORM GUIDANCE OVERVIEW. OMB Circulars Before and After A-21 Cost principles for Educational Institutions A-21 Cost principles for Educational Institutions.
Uniform Guidance Update RESEARCH ADMINISTRATORS TEAM MEETING FEBRUARY 2015.
 Division of Grants Compliance and Oversight Office of Policy for Extramural Research Administration, OER National Institutes of Health, DHHS NIH Regional.
Proposal & Award Policies & Procedures Guide (PAPPG) Changes & Clarifications.
Understanding the Federal Demonstration Partnership (FDP) & the Expanded Authorities: A Primer for Research & Sponsored Programs Staff September 19, 2003.
 Presented By: NameTitleOffice PresentationTitle NCURA Region V Annual Conference April 21, 2015 Michelle G. Bulls, Director Samuel Ashe, Grants Policy.
Financial Management For Project Administrators. How Feds View Themselves.
Uniform Grant Guidance (2 CFR, Subtitle A, Chapter II, Part 200 Uniform Administrative Requirements, Cost Principles and Audit Requirements for Federal.
FEDERAL LAW FOR GRANTS AND FEDERAL SPENDING GUIDELINES OMB Super Circular The Uniform Admin. Requirements, Cost Principles, and Audit Requirements for.
UNIFORM ADMINISTRATIVE REQUIREMENTS, AUDIT REQUIREMENTS, AND COST PRINCIPLES 2 CFR CHAPTER 1, CHAPTER 2, PART 200, ET AL. Uniform Guidance Training June.
Reporting on the Federal Financial Report “SF-425” Presented by HOMELESS GRANT AND PER DIEM PROGRAM and The Financial Service Center 1.
Monitor and Closeout Awards Lamar Revis NMFS Team Leader Paulette S. Moss OAR, NWS, NESDIS Team Leader.
2015 VOCA National Training Conference Grant Financial Management.
Cost Principles – 2 CFR Part 200 Subpart E U.S. Department of Education.
Policy Update Michelle G. Bulls Chief Grants Management Officer Grants Policy.
Presented by Raaj Kurapati and Charlene Hart. Introduction  The Single Audit Act Amendments of 1996 was enacted to streamline and improve the effectiveness.
Grant Award Management Bryan S. Clark, M.B.A. Chief Grants Management Officer Eunice Kennedy Shriver National Institute of Child Health and Human Development.
The Uniform Administrative Requirements, Cost Principles, and Audit Requirements for Federal Awards The OMB SuperCircular Information for FTA Grantees.
Page 1 Discretionary Grants Administration David J. Downey Office of the Deputy Secretary Risk Management Service.
Got the Grant What’s next??????????? Joy R. Knipple Team Leader, National Institute of Mental Health July 26, 2006.
1 Federal Grants Streamlining Michael Nelson Director, Grants Management Division.
Presented by: Dan Parker/FHWA. Streamlines the language from eight OMB circulars to one consolidated set of guidance. The following have been combined.
FHWA Implementation 2CFR 200 Uniform Administrative Requirements, Cost Principles, and Audit Requirements for Federal Awards September 2015.
SBIR Budgeting Leanne Robey Chief, Special Reviews Branch, NIH.
Charter School 2015 Annual Finance Seminar Grant Management Office of Grants Fiscal September 11, 2015.
Uniform Guidance Updates: What PI’s and their staff need to know April 2, 2015 Syracuse University Office of Sponsored Programs.
Award Transfers Office of Research Services ORS Brown Bag November 20, 2006.
1 QEM/BIO Workshop October 21, 2005 Award Administration.
August, 2013 Grants Circular Reform Update Office of Management and Budget For more information visit
Prepared by the Office of Grants and Contracts1 The Basics of Grants Administration.
Uniform Guidance Overview Samuel Ashe, Grants Policy Analyst Office of Policy for Extramural Research Administration, OER, NIH 1 NIH Regional Seminar -
National Institutes of Health U.S. Department of Health and Human Services NIEHS SRP Annual Meeting November 18 – 20, 2015 George Tucker Chief, Grants.
Office of Sponsored Programs- OMB Uniform Guidance October 21, 2015.
Indirect Cost Rates 101 CNCS Uniform Guidance § Indirect Costs.
1 Research Terms and Conditions Status Update Briefing to the Council on Governmental Relations.
Prior Approval? Is That A Fact? Attention! Uniformed Guidance Audit Anyone? $500 $400 $300 $200 $100 $500 $400 $300 $200 $100 $500 $400 $300 $200 $100.
2016 NSF Large Facilities Workshop New Initiatives Business Roundtable II-III May 25-26, 2016 Jeff Lupis, Division Director, Division of Acquisition and.
F&A Rates 101 Basics of F&A rates for Proposals, Grants, & Contracts Dr. Mindy S. Connolly, CPCM Sr. Sponsored Research Officer Office of Sponsored Projects.
Welcome to Workforce 3 One U.S. Department of Labor Employment and Training Administration Webinar Date: November 3, 2015 Presented by: Office of Grants.
THE BIGGEST WINNER Uniform Guidance. Test Your Knowledge UG Basics Equipment & Facilities Shared Costs Items of Cost Bits & Pieces
UNIFORM GUIDANCE: RESULTS AND BEST PRACTICES
Presented by Urmila Bajaj January 26, 2017
Understanding the Uniform Guidance Effective Dates
OMB Super Circular Big Changes for Nonprofits
Presented by: Belinda Rinker, JD Senior policy analyst
ETA Financial System Hot Topics
Sponsored Programs at Penn
Results of NSF Data Analytics and Other Audits
Grants Policy Issuance (GPI) 18-02
Presentation transcript:

 Presented By: NameTitleOffice PresentationTitle Michelle G. Bulls Director Director Office of Policy for Extramural Research Administration, OER NIH NIH Regional Seminar – May 7, 2015 Baltimore, MD Jean Feldman Head Office of Policy, Division of Institution & Award Support NSF NSF

On December 26, 2013, OMB published its “Uniform Administrative Requirements, Cost Principles, and Audit Requirements for Federal Awards” (Uniform Guidance or UG), located at 2 CFR 200 o Strengthens oversight of Federal awards to reduce the risk of waste, fraud, and abuse o Streamlines regulations to ease administrative burden A comprehensive consolidation of OMB Circulars: o Cost Principles: A-21, A-87, A-122, o Administrative Requirements: A-110 & A-102 o Audit Requirements: A-133 & A-50 o CFDA: A-89 2

Agency implementation of Uniform Guidance Federal awarding agencies are subject to the same requirements but have different methods of implementation Today’s presentation will focus on: o NSF’s and NIH’s implementations of the Uniform Guidance o NIH & NSF efforts to align Uniform Guidance implementation o Federal-wide Research Terms and Conditions 3

NSF’s Implementation of Uniform Guidance 4

Effective for proposals submitted or due on or after December 26 Effective for new awards and for funding amendments on existing awards made on or after December 26 5

Since the first issuance of OMB Circular A-110, NSF has always implemented the Circular requirements via policy rather than a regulation. 2 CFR § , Agency Implementation specifically permits OMB to approve use of alternative implementation strategies NSF requested, and, OMB approved NSF’s use of a policy document to implement the Uniform Guidance NSF is the only agency which has been granted such authority. 6

NSF received OMB approval to implement Uniform Guidance via the PAPPG. Draft PAPPG released for public comment through Federal Register, May 9 - July 8, 2014 NSF published the PAPPG on November 20th, with an effective date of December 26, 2014 NSF published revised Grant General Conditions that will be utilized for all awardees for new awards and funding amendments on existing awards made on or after December 26, NSF intends to utilize the revised Research Terms and Conditions upon implementation. o NSF intends to utilize the revised Research Terms and Conditions upon implementation. 7

Administrative and Clerical Salaries & Wages Travel Participant Support Materials and Supplies Indirect Costs Risk Management Framework 8

NSF Award Conditions Notifications and Requests Cost Sharing 9

Non-Use of the Federal Financial Report Data Elements o Award Cash Management Service (ACM$) and NSF Program Income Reporting Worksheet implemented as NSF’s primary financial data collection mechanisms 10

In the absence of Research Terms and Conditions, the GC-1 was modified to implement the new Uniform Guidance for use with all recipient types Previously, the GC-1 was used with for-profit entities and State and local governments only Terminology modified throughout for consistency with the Uniform Guidance Prior approval requirements have been updated in Article 2 11

Specific OMB FAQs have been highlighted throughout Participant support costs have been modified to require prior approval for additional categories of participant support costs not identified in approved budget Project Reporting Requirements have been clarified to specify when a report becomes “overdue” 12

Expenditure reporting modified to establish the requirement that grantees must submit final financial disbursements no later than 120 days after the grant ends in the Award Cash Management Service. o This overrides the 90 days period identified in the Award & Administration Guide (AAG) Program Income Updated for consistency with AAG 13

Visit the Policy Office website for FAQs on NSF implementation of the Uniform Guidance 14 nsf.gov/bfa/dias/policy/

For More Information….. Ask Early, Ask Often! 15

NIH’s Implementation of Uniform Guidance 16

December 19, HHS published in the Federal Register an interim final rule adapting OMB’s final guidance in 2 CFR 200. See NOT-OD Federal Register NOT-OD o Located at 45 CFR 75 o Effective December 26, 2014 o 60-day comment period (ended on February 17, 2015) February 5, NIH published Interim General Grant Conditions, which aligned with HHS’ implementing regulations of the Uniform Guidance. See NOT-OD NOT-OD March 31, NIH published the revised NIH Grants Policy Statement (NIHGPS), which superseded NIH’s Interim General Grant Conditions. See NOT-OD NOT-OD

Notices of Award (NoA) issued on or after December 26, 2014 that obligate new or supplemental funds are subject to Uniform Guidance requirements. NoAs issued on or after December 26, 2014 that do not involve obligation of new or supplemental funds remain subject to 45 CFR Part 74 or Part 92, as applicable, until such time that new funds are obligated. NoAs issued on or after December 26, 2014 that document an approved carryover amount from a previous fiscal year are subject to 45 CFR Part 74 or Part 92, as applicable. o However, once a new increment of funds (supplement) is received, the new HHS regulations at 45 CFR Part 75 will apply to any previous fiscal year funds that are uncommitted or unobligated (carryover) as of the Federal award date.. 18

NIH Notices of Awards have been revised to reflect the following: o Federal award date o Total approved cost sharing or matching (replaced Non- Federal share) o Total Amount of Federal Funds Obligated (Federal Share) o Added Catalog of Federal Domestic Assistance (CFDA) name in addition to the CFDA Number o Added Period of Performance above the Budget Period and Project Period o Added Research & Development (R&D) Indicator 19

Acronyms: Updated NIHGPS & Supplemental Instructions (SI) and NIH website to reflect changes Definitions: Updated NIHGPS & SI and NIH website. o Added 56 new terms in Exhibit 2: Definitions of Terms (NIHGPS). o Modified definitions of 39 terms and deleted 6 other terms from Exhibit 2. 20

Reimbursement of Facilities and Administrative Costs F&A rates continue to be negotiated by DCA, DFAS in the Office of Acquisition Management and Policy at NIH, or other agency with cognizance for F&A/indirect cost rate (and other special rate) negotiation. However, consistent with 45 CFR (f), any non-Federal entity that has never received a negotiated indirect cost rate (except for certain types of non-Federal entities) may elect to charge a de minimis rate of 10% of modified total direct costs (MTDC). o NRSA training grants and career development awards - F&A reimbursement remains at 8% of MTDC o Foreign – F&A reimbursement remains at 8% of MTDC (less only equipment) 21

Revisions to Selected Items of Cost o Added Participant Support Cost o Added Temporary Dependent Care Cost o Added Rearrangement and Reconversion cost o Value Added Tax Policy – modification of NIH’s customs and import duty tax policy 22

Prior written approval NIH will continue its longstanding Expanded Authorities policy (NIH Standard Terms of Award). o NIH Standard Terms of Award allow agencies to waive certain cost-related and administrative prior approval. Examples: Re-budgeting of funds, provided that the change does not result in a change of scope Carryover of unobligated balances from one budget period to any subsequent period (prior approval still required for some awards) The first extension of final budget period of a project period without additional NIH funds (no-cost extension) o See Chapter of the NIHGPS for details. 23

Procurement System Standards and Requirements Recipients must comply with the requirements in 45 CFR parts through for the purchase of goods or services through contracts under grants. o OMB has provided a one-year grace period for implementation of these subsections for institutions of higher education (IHEs) and nonprofit organizations. Thus, these requirements are expected to take effect for these entities for their first fiscal year after December 26, o See Chapter of the NIHGPS for details. 24

Audit Requirements NIH recipients (other than Federal institutions) are subject to the audit requirements of OMB 2 CFR 200, Subpart F—Audit Requirements, as implemented by HHS at 45 CFR Subpart F and in the NIHGPS. o Any state or local government or non-profit organization (including IHEs) that expends $750,000 or more per year under Federal grants, cooperative agreements, and/or procurement contracts must have an annual audit. o See Chapter of the NIHGPS for details. 25

Closeout Recipients must submit a final FFR, final progress report, and Final Invention Statement and Certification within 120 calendar days of the end of grant support. This provision is aligned with the clarification being proposed for the Closeout provision within the Research Terms and Conditions Overlay document. See Chapter 8.6 of the NIHGPS for more information. 26

NIH & NSF Collaboration As two of the largest Federal awarding agencies of research awards, NIH and NSF frequently collaborate in policy implementation efforts to reduce administrative burden on grantees. In addition to serving as co-chairs of Federal-wide research Terms and Conditions Workgroup, NIH & NSF have closely collaborated to align both agencies’ implementation of the Uniform Guidance. o Prior Approval (e.g. Administrative and Clerical Salaries, Equipment & Other Capital Expenditures and pre-award costs) o UG Applicability to Carryover o Closeout 27

Questions? NIH’s Uniform Guidance FAQs:

29 Research Terms and Conditions

30 NSF & NIH are working with other Federal Research Agencies to develop a Research Terms and Conditions Overlay document. o Overlay will serve as a companion document to provide additional clarity for select provisions consistent with government-wide research policy.

Department of Agriculture o NIFA Department of Commerce o NIST/NOAA Department of Energy Department of Transportation o FAA Environmental Protection Agency NASA NIH – co-Chair NSF – co-Chair 31

In early 2014, multiple conference calls were held with representatives from the Research Business Models (RBM) Subcommittee to discuss whether, and, if so, how, to proceed with development of a replacement to the now outdated Research Terms and Conditions (RTCs). The RBM approved the Working Group to move forward with development of the proposed implementation model o The Department of Defense is currently developing a different implementation model. 32

The RBM Working Group began with the existing RTC and developed an overlay to the Uniform Guidance which includes the: o National Policy Requirements o Subaward Matrix o Prior Approval Matrix 33

National Policy Requirements - The RBM Working Group reviewed the current Matrix and determined that the Policy Matrix will include only Federal-wide Requirements and that each agency would maintain their own agency specific requirements as part of their agency implementation. Prior Approval Matrix - The RBM Working Group has considered each prior approval requirement identified in the Uniform Guidance using the following criterion : 34

Do two or more agencies support waiving the prior approval requirement? o If yes, the prior approval would be waived within the RTC overlay, but agencies would have the discretion to maintain the prior approval within their agency specific requirements. 35

36

37 Implementation Plans Agency Specific Requirements National Policy Matrix Subaward Matrix Prior Approval Matrix Specific language for each award covered by the RTCs for participating FDP institutions?

38 Example of what has been done in the past: o ementation_808.pdf ementation_808.pdf What needs to be specified in Implementation Plans? o Is there information that would be useful to grantees that is not included?

39 (a) State which awards are covered by the Research Terms and Conditions. (If an agency wants to make a point of the fact that a particular class of awards is not covered, it should state these too.) (b) State any additional prior approval requirements not included in the general T&C’s (c) State which categories of costs are unallowable as direct charges (d) Provide contact information for technical matters (titles, not individuals) (e) Provide contact information for administrative matters (titles, not individuals).

(f) Provide contact information for intellectual property (titles, not individuals). (g) State other agency-specific requirements, with reference to general requirements if possible. (h) State whether revised budgets must be submitted on agency forms. (i)Specify format, content, and timing of technical reporting. (j)Specify form and timing of final financial reporting. (k) State any additional documentation besides progress reports needed to trigger incremental funding. 40

41 National Policy Matrix o 14.pdf 14.pdf Subaward Matrix o e11.pdf e11.pdf Prior Approval Matrix o oval_oct08.pdf oval_oct08.pdf

Complete draft format Engage stakeholder groups Publish in the Federal Register for comment Initiate formal clearance process Implement 42

Questions? 43