INDIA AIDC IMPLEMENTATION STATUS AND ISSUES

Slides:



Advertisements
Similar presentations
REVIEW OF PREVIOUS DISCUSSIONS ON MARITIME SECURITY IN THE ARF.
Advertisements

AMHS/SWIM Seminar Chiang Mai, Thailand 5-6 March 2012
Background Hong Kong, China has put AIDC into operational use between HK and Sanya since Feb Standalone system use real-time data from ATM System.
INDIA AIDC IMPLEMENTATION STATUS AND ISSUES
SEPARATE PROCEDURES AND ROUTES FOR GENERAL AVIATION
Intensified action on seven behaviours by all development partners Session objectives 1.To review status of intensified action: progress, issues and challenges.
Ensuring a 'Flexible Use of Airspace'…. Patrick Delmouzée Head of ATM Unit DSS/CM EUROCONTROL Moving towards an Integrated ASM/ATFCM/ATS Approach EUROCONTROL.
Workshop on preparations for ANConf/12 − ASBU methodology
Pan regional ICD for AIDC structure and status (SP/09)
ICAO EUR/NAT Office Celso Figueiredo – Regional Officer ANS - ATM
Development of AIDC ICD in APAC Region
IT Empowerment (under DACNET project) “ Knowledge is power”
APAC SIP on ASBU B0-FICE AIDC Implementation Seminar Basic SYSCO Principles and Standard OLDI Communication EUR Environment ICAO EUR/NAT Office Celso Figueiredo.
AIDC safety benefits & limitations AIDC Implementation Seminar 28 th – 31 st October 2014 Adam Watkin Airservices Australia.
Disaster Law Programme Law and disaster risk reduction Sanne Boswijk Disaster Law Coordinator for MENA \Disasters and Law Consultation Kuwait, 11 June.
AIDC Top priority in APAC Special Implementation Project AIDC Bangkok, Oct Prepared by F.Lecat 1.
We would be happy to make you and your workplace cheerful and comfortable. Thank You A 360 O solution provider for World Class Modular Office Furniture.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-25/PIA-2 Increased Interoperability, Efficiency and Capacity through.
Presentation to: Name: Date: ICAO Asia-Pacific AMHS Activities & Status ICAO Asia-Pacific AMHS Activities & Status ATS Message Handling System (AMHS )
1 RENA: how it could help to address environmental challenges RENA: how it could help to address environmental challenges Turkey 11 th REReP Task Force.
ISO 9001:2008 What will the November 2008 amendments to ISO 9001 mean to you?
(Dr. Peter Heil, ALTUS – Hungary)
AMHS Interoperability
AMHS WORKSHOP POLICY & DOCUMENTATION. AMHS WORKSHOP POLICY & DOCUMENTATION  Operational Requirements for facilities or services are established through.
State of Implementation of ISIC and CPC Isaac K. Ndegwa KENYA NATIONAL BUREAU OF STATISTICS.
Transboundary Trust Space February 16, 2012 Ensuring trust in information exchange – proposal and approaches from Russia and CIS-states (RCC states) National.
INDIA AIDC IMPLEMENTATION STATUS AND ISSUES Presented by Airports Authority of India SIP AIDC Seminar October 2014.
WMO WMO INTEGRATED GLOBAL OBSERVING SYSTEM (WIGOS) TT-PWPP National WIGOS Implementation WMO; OBS.
ATS Message Handling System (AMHS)/ System Wide Information Management (SWIM) Workshop and the Seventh Meeting of Aeronautical Telecommunication Network.
Best practices in the Netherlands Prestation conference Gödölló March 23rd.
How to Common overcome Laptop Repairs Laptops are vital and remarkable tool for business as well as personal use. This helps to automate our day to day.
28-31 October RASMAG STUDY ON THE EFFECT OF AIDC AND APANPIRG CONCLUSIONS Secretariat - APAC OFFICE 28 October 2014 SIP AIDC Seminar in Bangkok SP/01.
Federal Energy Regulatory Commission MISO/Alliance Companies’ RTO Status Reports Presented by: Joseph Power Tony Ingram Rahim Amerkhail Patrick Clarey.
WMO WMO INTEGRATED GLOBAL OBSERVING SYSTEM (WIGOS) STATUS OF IMPLEMENTATION (Dr S. Barrell, Chair, ICG-WIGOS) WMO; OBS.
Promoting European clean technologies in India & tackling climate change | 1 30 th Sep Promoting EU-India Economic Relations through.
Viet Nam AIDC. AIDC Implementation Status HCM - AIDC – available for current ATM System Ver 1 HaNoi – AIDC - available for current ATM System Ver 3 Conduct.
The 7th Framework Programme for Research: Strategy of international cooperation activities Robert Burmanjer Head of Unit, “International Scientific Cooperation.
IPCC Key challenges facing communities, and approaches to solutions that enhance resilience: through NAPs Climate and Health Summit 2014 Investing.
The International Plant Protection Convention IPPC Secretariat, November 2015 Electronic Phytosanitary Certification, ePhyto.
V. VSOMASUNDARAM, Board Member (Air Navigation Services), Airports Authority of India.
Service Enhancement AMHS Implementation Workshop Chennai, India 15 th – 17 th December 2008.
ICAO EUR/NAT Office Celso Figueiredo – Regional Officer ANS - ATM
Capacity Building Information on BCH : Compendium of Biosafety Training Courses Brief Report from 2nd International Meeting of Academic Institutions and.
INDIA AIDC IMPLEMENTATION STATUS AND ISSUES
ICAO EUR/NAT Office Celso Figueiredo – Regional Officer ANS - ATM
INITIATIVES TAKEN BY AAI UNDER
Introduction to LDC Strategy
amendments to ISO 9001 mean to you?
AIDC Top priority in APAC
Airtel Virtual Number Service:
Workshop on preparations for ANConf/12 − ASBU methodology
RASMAG STUDY ON THE EFFECT OF AIDC AND APANPIRG CONCLUSIONS
AMHS/SWIM Seminar Chiang Mai, Thailand 5-6 March 2012
Exchange of information between Member States
INDIA AIDC IMPLEMENTATION STATUS AND ISSUES
IP and AMHS TRIALS- PLANIFICATION STRATEGY
AIDC Implementation in Hong Kong, China
INDIA AIDC IMPLEMENTATION STATUS AND ISSUES
AEROTHAI AIDC Implementation Status
WMO Integrated Global Observing System (WIGOS) 16-RA VI Side Event Helsinki, Finland, 11 September 2013 Dr Miroslav Ondráš, Dr Wenjian Zhang (WMO) Dr.
Wheelchair Dealers in Kolkata Wheelchair Dealers in Kolkata.
ATFM IMPLEMENATION IN INDIA – FUTURE PLANS
Send rakhi in India and it’s all cities with express delivery service via Sendrakhi.comSendrakhi.com.
A model to link them all IFLA-LRM as a driver for harmonization of cataloguing standards related to serials and other continuing resources Gordon Dunsire.
Statistical Cooperation with ENP-East
بسمه تعالی کارگاه ارزشیابی پیشرفت تحصیلی
Multi-beneficiary IPA programmes – state of play and lessons learnt
LoA Project Highlights លទ្ធផលនៃការអនុវត្តគម្រោង
Free Indian Business Directory, Business Listing Site - Pinmarq List your local business for free on top business listing site in India. Find latest reviews.
Presentation transcript:

INDIA AIDC IMPLEMENTATION STATUS AND ISSUES Presented by Airports Authority of India

AIDC in India India initiated AIDC operational trials after commissioning of automation systems at major ATS units in India. Successful testing has been carried out between major ATC centres in India and plans are now underway to operationalize AIDC in a phased manner. Extensive trials have been carried out between dissimilar automations systems available at various ATS units India has also drawn up plans to establish AIDC with adjacent ATS Units of neighboring states in the sub- region. In some cases, successful trials underway. Currently using APAC AIDC ICD version 3.0

ATM Automation systems in India Raytheon (AT3) Delhi, Mumbai Raytheon (AT3+) Chennai Indra (iCOM) at Kolkata Indra (Aircon2100) at 38 mid/small sized airports Selex ATM System at Bengaluru and Hyderabad New Indra system is upcoming at Delhi as replacement

AIDC Status (International) Delhi (AT3) AIDC with Lahore Karachi Under testing. Working one sided in favour of Delhi Varanasi Kathmandu Readiness at Kathmandu end awaited Mumbai (AT3) AIDC with Muscat Muscat using OLDI. Karachi Initial testing carried out. Seychelles Sanaa Planned Mauritius Mogadishu Chennai (AT3+) AIDC with Kuala Lumpur Successful trials carried out. Male(Maldives) Ready for testing. Colombo Initial Testing in March13. To start again after adaptation changes Jakarta, Yangon Not ready for AIDC testing

AIDC Status (International) Kolkata Kathmandu Dhaka No Automation system at other end. Yangon Ahmedabad Karachi Successful trials carried out.

Chennai – Kuala Lumpur During initial testing, it was observed that ABI messages sent from Chennai were rejected by Kuala Lumpur system citing CRC errors. After detailed analysis at Chennai, it was determined that the rejection was due to incorrect calculation of checksum by the Kuala Lumpur system. Kuala Lumpur Automation system was replacing the alignment characters with space characters prior to CRC calculation leading to discrepancy in the CRC checksum. After sorting out the CRC errors by Kuala Lumpur, the AIDC message exchange was successful. Both the States are working together to operationalize AIDC at the earliest after addressing a few minor issues. LOA expected in December 2014.

Ahmedabad - Karachi Trial operations commenced on 05.06.2014. During the initial phase of testing, it was observed that messages were rejected due to route errors and mismatch in the coordination timing. Coordination protocol dialogue time out was observed. After synchronizing Karachi AMSS/AFTN system time with India’s AMSS/ AFTN system time, the AIDC messages could be successfully exchanged between the two systems. Further trial of AIDC for limited hours is in progress between Karachi and Ahmedabad. Lessons learnt for implementation of AIDC with other ATSUs.

AIDC Status (National) Delhi (AT3) AIDC with Ahmedabad (Aircon2100) Nagpur (Aircon2100) Implemented Varanasi (Aircon2100) Mumbai (AT3) AIDC with Chennai (AT3+) Under trial operation Suspended due to adaptation changes Chennai (AT3+) AIDC with Mumbai (AT3+) Under trial operation Bengaluru (Selex) Hyderabad (Selex) Under trial operation Trivandrum (Aircon2100) Kolkata (Aircon Icon) AIDC with Varanasi (Aircon2100) Planned

AIDC Status (National) Bangaluru (BIAL) (Selex) Hyderabad (HIAL) (Selex) Under trial operations. Mangalore (Aircon2100) Chennai (AT3+)

Challenges in AIDC Implementation Interoperability between diverse ATM Systems. Implementation and system design issues attributed to revision of AIDC ICD versions. Need for close bilateral cooperation between the concerned States for expeditious and successful implementation of AIDC Bi-lateral agreements must be in place through MOUs or LOAs between the member states and may be reviewed to meet the intended objectives. Compatibility with existing Automation system using OLDI, replacement of OLDI with PAN Regional ICD or co-existence of OLDI and AIDC applications are key issues that may have to be addressed by some of the states for harmonized AIDC implementation. PAN regional ICD shall require synchronization of technology refresh cycles and maintaining backward compatibility of the automation systems for smooth exchange of AIDC messages.

Thanks for Kind Attention