Close Call System 2.2 Webinar Jennifer Fox CCS Trainer RSSB
Reporting a Close Call Event CCS 2.2 Project Network Rail’s Life Saving Rules Requesting System Enhancements Overview of System Changes Start Centre Close Call Event screen Responsible Manager responsibilities
Use of Close Call system for Network Rail / Contractors Report via the Network Rail Close Call process. Call: Log via NR Close Call app (not currently available to contractors) Report via the contractor Close Call process Details should be given in site induction – if in doubt, speak to your supervisor I’m working on railway infrastructure, in a Network Rail building, or travelling on Network Rail business. I’m working on railway infrastructure managed by a Principal Contractor.
Changes made under CCS 2.2 Project Start Centre Portlets Additional tick box in the Close Call Event Description field New tab – Network Rails Lifesaving Rules RM review notification content Bulk Upload Spreadsheet
Life Saving Rules
Contact for user enhancement requests Ongoing programme of work for system enhancements.