1-1.

Slides:



Advertisements
Similar presentations
With Microsoft Excel 2010 © 2011 Pearson Education, Inc. Publishing as Prentice Hall1 PowerPoint Presentation to Accompany GO! with Microsoft ® Excel 2010.
Advertisements

©2002 Prentice Hall Business Publishing, Introduction to Management Accounting 12/e, Horngren/Sundem/Stratton Chapter 15 Overhead Application: Variable.
Chapter 11 Flexible Budgeting and the Management of Overhead and Support Activity Costs Chapter 11: Flexible Budgeting and the Management of Overhead and.
Chapter 15 Fundamentals of Variance Analysis Learning Objectives 4.Prepare and use a profit variance analysis. 2.Develop and use flexible budgets.
Copyright © 2014 Pearson Education, Inc. publishing as Prentice Hall
Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall. Chapter 23 1.
Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall. Chapter 23 1.
Standard Costing and Variances
Flexible Budgets and Performance Analysis Chapter 10 McGraw-Hill/Irwin Copyright © 2010 by The McGraw-Hill Companies, Inc. All rights reserved.
7 - 1 ©2003 Prentice Hall Business Publishing, Cost Accounting 11/e, Horngren/Datar/Foster Flexible Budgets, Variances, and Management Control: I Budgeting.
©2005 Prentice Hall Business Publishing, Introduction to Management Accounting 13/e, Horngren/Sundem/Stratton Copyright © 2014 Pearson Education,
CHAPTER 15 Cost Analysis for Control. McGraw-Hill/Irwin © 2004 The McGraw-Hill Companies, Inc., All Rights Reserved Decision Making Strategic, Operational,
Budgetary Control and Responsibility Accounting
Cost Analysis for Control
©2002 Prentice Hall Business Publishing, Introduction to Management Accounting 12/e, Horngren/Sundem/Stratton Flexible Budgets Distinguish between.
Hilton Maher Selto. 17 Flexible Budgets, Overhead Cost Management, and Activity-Based Budgeting McGraw-Hill/Irwin © 2003 The McGraw-Hill Companies, Inc.,
©2008 Prentice Hall Business Publishing, Introduction to Management Accounting 14/e, Horngren/Sundem/Stratton/Schatzberg/Burgstahler Introduction.
Cost Accounting Horngreen, Datar, Foster Flexible Budgets, Variances, and Management Control: I Session 7.
7 - 1 ©2003 Prentice Hall Business Publishing, Cost Accounting 11/e, Horngren/Datar/Foster Flexible Budgets, Variances, and Management Control: I Chapter.
©2008 Prentice Hall Business Publishing, Introduction to Management Accounting 14/e, Horngren/Sundem/Stratton/Schatzberg/Burgstahler Introduction.
2009 Foster School of Business Cost Accounting L.DuCharme 1 Direct Input Variances, and Management Control: I Chapter 7.
The Islamic University –Gaza
© 2014 by McGraw-Hill Education. This is proprietary material solely for authorized instructor use. Not authorized for sale or distribution in any manner.
© 2014 by McGraw-Hill Education. This is proprietary material solely for authorized instructor use. Not authorized for sale or distribution in any manner.
Copyright © 2014 Pearson Education, Inc. publishing as Prentice Hall
Copyright © 2014 Pearson Education, Inc. publishing as Prentice Hall
Fundamentals of Variance Analysis Chapter 16 Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
Flexible Budgets and Variance Analysis JOIN KHALID AZIZ ECONOMICS OF ICMAP, ICAP, MA-ECONOMICS, B.COM. FINANCIAL ACCOUNTING OF ICMAP STAGE 1,3,4 ICAP.
Copyright © 2003 Pearson Education Canada Inc. Slide 7-76 Chapter 7 Flexible Budgets, Variances and Management Control: I.
Chapter Fifteen Performance Evaluation © 2015 McGraw-Hill Education.
23 Performance Evaluation Using Variances from Standard Costs
© 2012 Pearson Prentice Hall. All rights reserved. Flexible Budgets, Direct-Cost Variances, and Management Control.
Budgeting and Standard Cost Systems Chapter 13. Budgeting A budget is a financial and quantitative plan for the acquisition and use of resources Use for.
Chapter 10 The Use of Budgets for Cost Control and Performance Evaluation.
©2002 Prentice Hall Business Publishing, Introduction to Management Accounting 12/e, Horngren/Sundem/Stratton Chapter 8 - Flexible Budgets and Variance.
Copyright © 2008 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin 17 Flexible Budgets, Overhead Cost Management, and Activity-Based.
8-1 Fundamental Managerial Accounting Concepts Thomas P. Edmonds Bor-Yi Tsay Philip R. Olds Copyright © 2009 by The McGraw-Hill Companies, Inc. All rights.
McGraw-Hill/IrwinCopyright ©2008 The McGraw-Hill Companies, Inc. All rights reserved. Fundamentals of Variance Analysis Chapter 16.
CHAPTER 8 Performance Evaluation. The McGraw-Hill Companies, Inc. 2008McGraw-Hill/Irwin 8-2 Learning Objective LO1 To describe flexible and static budgets.
Chapter 23 Flexible Budgets and Standard Cost Systems
Chapter 21 Flexible Budgets and Standard Costing.
Copyright © 2015 Pearson Education, Inc., All Rights Reserved Flexible Budgets, Direct-Cost Variances, and Management Control.
Performance Evaluation Through Standard Costs
Do other companies like BMW Group use manufacturing standards to guide performance at their plants? 1.Yes 2.No.
Variances Short summary. Static Budgets A static budget ( master budget) is prepared for only one level of a given type of activity. All actual results.
1 Chapter Eleven Standard Costs and Variance Analysis.
McGraw-Hill/Irwin Copyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved.
1 Budgeting as a control mechanism 1. Budgeted levels are the standards to follow in operation 2. Variance evaluation for performance measurement A variance.
ACC3200 STANDARD COSTING.
© 2012 Pearson Prentice Hall. All rights reserved. Using Budgets for Planning and Coordination Chapter 10.
©2005 Prentice Hall Business Publishing, Introduction to Management Accounting 13/e, Horngren/Sundem/Stratton Flexible Budgets and Variance Analysis.
24 - 1©2002 Prentice Hall, Inc. Business Publishing Accounting, 5/E Horngren/Harrison/Bamber Flexible Budgets and Standard Costs Chapter 24.
The Islamic University –Gaza
1 Chapter 10. Standard Costs. M11-Chp-10-1-Standard-Costs Edited May 24, Copyright © 2011, Dr. Howard Godfrey This file contains illustrative.
Accounting Principles Using Excel for Success PowerPoint Presentation by: Douglas Cloud, Professor Emeritus Accounting, Pepperdine University.
Chapter 23 Flexible Budgets and Standard Cost Systems.
Flexible Budgets and Standard Costs Chapter 24. Objective 1 Prepare a Flexible Budget for the Income Statement.
Chapter Fifteen Performance Evaluation © 2015 McGraw-Hill Education.
Chapter Two Marketing Performance and Marketing Profitability.
Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall. Chapter 23 1.
COST ANALYSIS FOR CONTROL
17 Flexible Budgets, Overhead Cost Management, and Activity-Based Budgeting.
© 2008 The McGraw-Hill Companies, Inc., All Rights Reserved.
Performance Evaluation Using Variances from Standard Costs
Flexible Budgets and Variance Analysis.
© 2017 by McGraw-Hill Education
Variance Analysis–A Tool for Cost Control and Performance Evaluation
© 2017 by McGraw-Hill Education
Flexible Budgets, Variances, and Management Control: I
Presentation transcript:

1-1

Chapter 8 Flexible Budgets and Variance Analysis

Chapter 8 Learning Objectives When you have finished studying this chapter, you should be able to: Identify variances and label them as favorable or unfavorable. Distinguish between flexible budgets and static budgets. 3. Use flexible-budget formulas to construct a flexible budget. 4. Compute and interpret static-budget variances, flexible-budget variances, and sales-activity variances. Copyright 2003 Prentice Hall Publishing

Chapter 8 Learning Objectives 5. Understand how the setting of standards affects the computation and interpretation of variances. 6. Compute and interpret price and quantity variances for materials and labor. 7. Compute variable overhead spending and efficiency variances. 8. Compute the fixed-overhead spending variance. Copyright 2003 Prentice Hall Publishing

Favorable and Unfavorable Variances Learning Objective 1 Favorable and Unfavorable Variances Favorable variances arise when actual results exceed budgeted. Unfavorable variances arise when actual results fall below budgeted. Favorable (F) versus Unfavorable (U) Variances Profits Revenue Costs Actual > Expected F F U Actual < Expected U U F

Types of Favorable and Unfavorable Variances Favorable profit variances arise when actual profits exceed budgeted profits. Unfavorable profit variance occurs when actual profit falls below budgeted profit. Actual revenues that exceed budgeted revenues result in favorable revenue variances, and actual revenues that fall short of budgeted revenues result in unfavorable revenue variances.

Types of Favorable and Unfavorable Variances When actual costs exceed budgeted costs, we have unfavorable cost variances; when actual costs are less than budgeted costs, we have favorable cost variances. The favorable and unfavorable labels indicate only the directional relationships summarized in the charts—they do not indicate that the explanation for the variance is necessarily good or bad.

Favorable or Unfavorable Variance? To determine whether a variance is favorable or unfavorable, use logic rather than memorizing a formula. A price variance is favorable if the actual price is less than the standard. A quantity variance is favorable if the actual quantity used is less than the standard quantity allowed.

Static and Flexible Budgets Learning Objective 2 Static and Flexible Budgets A static budget is prepared for only one expected level of activity. A budget that adjusts to different levels of activity is a flexible budget (sometimes called a variable budget).

Flexible Budget Formulas Learning Objective 3 Flexible Budget Formulas To develop a flexible budget, managers determine revenue and cost behavior (within the relevant range) with respect to cost drivers. Note that the static budget is just the flexible budget for a single assumed level of activity.

Activity-Based Flexible Budget An activity-based flexible budget is based on budgeted costs for each activity and related cost driver. For each activity, costs depend on a different cost driver.

Activity-Based Flexible Budget

Static-Budget Variances and Flexible-Budget Variances Learning Objective 4 Static-Budget Variances and Flexible-Budget Variances Differences between actual results and the static budget for the original planned level of output are static-budget variances. Differences between actual results and the flexible budget for the actual level of output achieved are flexible-budget variances. Flexible budget variances reflect how actual results deviate from what was expected, given the achieved activity level.

Static-Budget Variances and Flexible-Budget Variances Actual results may differ from the master budget because... sales and other cost-driver activities were not the same as originally forecasted Or . . . revenue or variable costs per unit of activity and fixed costs per period were not as expected.

Evaluation of Financial Performance Actual results at actual activity level* (1) Flexible budget for actual sales activity (3) Sales - Activity Variance (4) = (3)–(5) Flexible-budget variances (2) = (1)-(3) Static Budget (5) Units 7,000 – 7,000 2,000U 9,000 Sales $217,000 – $217,000 $62,000 U $279,000 Variable costs 158,200 5,670 U 152,600 43,600 F 196,200 Contribution margin $ 58,730 $ 5,670 U $ 64,400 $18,400 U $ 82,800 Fixed costs 70,300 300 U 70,000 – 70,000 Operating income $ (11,570) $5,970 U $(5,600) $18,400 U $ 12,800

Flexible-Budget Variances = Actual results – Flexible-budget Activity-level variances: The differences between the static budget amounts and the flexible budget amounts. Sales-activity variances: The activity-level variances when sales is used as the cost driver.

Sales-Activity Variances income variance = X Actual unit - Static budget units Contribution margin per unit X = (9,000 – 7,000) $9.20 = $18,400 Unfavorable Falling short of the sales target by 2,000 units explains $18,400 of the shortfall of income relative to the amount initially budgeted.

Role of Standards in Determining Variances Learning Objective 5 Role of Standards in Determining Variances Static-budget variances and flexible- budget variances depend on the costs used in the budget formulas. Budget formula costs are standard costs—costs that should be achieved. Standard costs are defined in different ways by different companies. The level at which standards are set will affect the variances generated and the incentives created.

Setting Standards An expected cost is the A standard cost is a carefully developed cost per unit that should be attained. An expected cost is the cost that is most likely to be attained. Perfection (ideal) standards are expressions of the Most efficient performance possible under the best conceivable conditions, using existing specifications and equipment. No provision is made for waste, spoilage, machine breakdowns, and the like.

Currently Attainable Standards are levels of performance that managers can achieve by realistic levels of effort. They make allowances for normal defects, spoilage, waste, and nonproductive time.

Trade-Offs Among Variances Improvements in one area could lead to improvements in others and vice versa. Likewise, substandard performance in one area may be balanced by superior performance in others.

When to Investigate Variances When should management investigate a variance? Many organizations have developed such rules of thumb as “investigate all variances exceeding either $5,000 or 15% of expected cost.”

Isolating the Causes of Variances Effectiveness is the degree to which a goal, objective, or target is met. Efficiency is the degree to which inputs are used in relation to a given level of outputs. Performance may be effective, efficient, both, or neither.

Comparison with Prior Periods Some organizations compare the most recent budget period’s actual results with last year’s results for the same period. Even comparisons with the prior month’s actual results may not be as useful as comparisons with an up-to-date flexible budget.

Flexible-Budget Variance in Detail Flexible-budget amounts based on $10 per unit of output for direct materials and $8 per unit for direct labor. Standard per unit of output: Std. inputs Flexible expected Budget Amount Direct Material 5 pounds $ 2 /pound $10 Direct Labor ½ hour $16/hour $ 8 Std. price expected

Variances for Material and Labor Standards Standard Costs Allowed: Direct material Cost allowed 7,000 units X 5 pounds X $2.00 per pound = $70,000 Direct labor Cost allowed 7,000 units X 1/2 hour X $16.00 per hour = $56,000

Variances for Material and Labor Standards Actual results for 7,000 units produced: Direct material Pounds purchased and used: 36,800 Price/pound X $1.90 = Total actual cost $69,920 Direct labor Hours used: 3,750 X Actual price (rate) X $16.40 = Total actual cost $61,500

Variances for Material and Labor Standards Flexible Budget or Total Standard Cost Allowed = Units of good output achieved × Input allowed per unit of output × Standard unit price of input

Variances for Material and Labor Standards Flexible-budget cost is the standard quantity allowed for the actual level of activity multiplied by the standard price per unit. Flexible-budget variances for direct material and direct labor: $80 F and $5,500 U, respectively. (1) (2) (3) Flexible Actual Flexible Budget Costs Budget Variance Direct Materials $69,920 *$70,000 $ 80 F Direct Labor 61,500 **$56,000 $5,500 U

Price and Quantity Variances Learning Objective 6 Price and Quantity Variances Price variance: (Applied to labor is called a rate variance) (Actual price – Standard Price) × Actual quantity used Quantity variance: (Often called usage or efficiency variance) (Actual quantity used – standard quantity allowed for actual output) × Standard price

Quantity (Usage) Variance Computations Direct-materials quantity variance: [36,800 – (7,000 × 5)] pounds × $2 per pound = $3,600 U Direct-labor quantity variance: [3,750 – (7,000 × ½)] hours × $16 per hour = $4,000 U

Price Variance Computations Direct materials price variance: ($1.90 – $2.00) per pound × 36,800 pounds = $3,680 F Direct labor price (rate) variance: ($16.40 – $16.00) per hour × 3,750 hours = $1,500 U

Direct Materials Flexible Budget Variance The sum of the direct-labor price and quantity variances equals the direct-labor flexible-budget variance. Similarly, the sum of the direct-materials price and quantity variances equals the total direct-materials flexible-budget variance. Direct-Labor Flexible-budget variance: Direct-Materials Flexible-budget variance: $1,500 unfavorable + $4,000 unfavorable = $5,500 unfavorable $3,680 favorable + $3,600 unfavorable = $80 favorable

Interpretation of Price and Quantity Variances By dividing flexible-budget variances into price and quantity variances, managers can be better evaluated on variances that they can control. Price and quantity variances are helpful because they provide feedback to those responsible for managing inputs. Managers should not use these variances alone for decision making, control, or evaluation.

Variable-Overhead Spending and Efficiency Variances Learning Objective 7 Variable-Overhead Spending and Efficiency Variances A variable-overhead efficiency variance occurs when actual cost-driver activity differs from the standard amount allowed for the actual output achieved. A variable-overhead spending variance occurs when the difference between the actual variable overhead and the amount of variable overhead budgeted for the actual level of cost-driver activity.

Variable-Overhead Variances variable- actual standard standard overhead cost-driver cost-driver variable-overhead efficiency activity activity rate per variance allowed cost-driver unit - X = variable- actual standard actual overhead variable variable-overhead cost-driver spending overhead rate per unit activity variance of cost-driver used - = X

Fixed Overhead Spending Variance Learning Objective 8 Fixed Overhead Spending Variance The flexible budget based on actual use of the cost driver and the flexible budget based on standard use of the cost driver are always the same because fixed overhead does not vary with the level of use of the cost driver. Therefore . . . The difference between actual fixed overhead and budgeted fixed overhead is the fixed overhead spending variance.

All rights reserved. No part of this publication may be reproduced, stored in a retrieval system, or transmitted, in any form or by any means, electronic, mechanical, photocopying, recording, or otherwise, without the prior written permission of the publisher. Printed in the United States of America.