Refining a Theory of Change 1 Barbara Reed & Dan Houston November 2014.

Slides:



Advertisements
Similar presentations
- Results-based Management - Monitoring & Evaluation An overview.
Advertisements

Continuous Improvement in the Classroom -Professional Learning Communities.
Evaluation Capacity Building Identifying and Addressing the Fields Needs.
The concepts/mechanisms/tools for developing a Joint Programme: Critical issues and UNDG Joint Programme Guidance and formats.
Prepared by BSP/PMR Results-Based Programming, Management and Monitoring Presentation to Geneva Group - Paris Hans d’Orville Director, Bureau of Strategic.
Food and Nutrition Technical Assistance III Project (FANTA) FHI Connecticut Ave., NW Washington, DC Tel: Fax:
Theory of Change, Impact Monitoring, and Most Significant Change EWB-UK Away Weekend – March 23, 2013.
1 Theory of Change Chesapeake Bay Funders Network Program Evaluation Training Workshop OMG Center for Collaborative Learning January 9-10, 2008.
Green Recovery And Reconstruction: Training Toolkit For Humanitarian Aid Project Design, Monitoring and Evaluation Session 2: Environmental Monitoring.
IFRC Shelter Technical Training Yverdon-Les-Bains, Switzerland | 3 rd – 7 th March 2008 This session describes the benefits of developing a strategic plan.
Action Logic Modelling Logic Models communicate a vision for an intervention as a solution to a public health nutrition (PHN) problem to:  funding agencies,
Program framework 1.Articulate program goals 2.Develop system level model for goal attainment 3.Assess current management efforts – identify gaps 4.Develop.
The Lumina Center Grantseeking Workshop Series Presents Outcomes & Evaluations April 20, 2006.
INSTRUCTIONAL LEADERSHIP FOR DIVERSE LEARNERS Susan Brody Hasazi Katharine S. Furney National Institute of Leadership, Disability, and Students Placed.
UNHCR/e-Centre/InterWorks - Emergency Management Training Session Emergency Operations Planning.
1 CASE STUDIES IN PROJECT MANAGEMENT Lecture 3 Project management methodologies.
Introduction to ISO New and modified requirements.
Results-Based Management
May 12 th Monitoring and Project Control. Objectives Anticipated Outcomes Express why Monitoring and Controlling are Important. Differentiate between.
Washington State Teacher and Principal Evaluation 1.
Shelter Training 08b – Belgium, 16 th –18 th November, 2008 based on content developed by p This session describes the benefits of developing a strategic.
Indicators of Success -- Applying the TOC What will change? You must be able to test your theory!
Ten years of Evaluability at the IDB Yuri Soares, Alejandro Pardo, Veronica Gonzalez and Sixto Aquino Paris, 16 November, 2010.
Green Recovery And Reconstruction: Training Toolkit For Humanitarian Aid Project Design, Monitoring and Evaluation Session 3: SMART Environmental Indicators.
Logic Models and Theory of Change Models: Defining and Telling Apart
Theory of Change. TOC is an overarching theoretical framework on “how and why something works” A theory of change explains a process to reach a long-
Development Hypothesis or Theory of Change M&E Capacity Strengthening Workshop, Maputo 19 and 20 September 2011 Arif Rashid, TOPS.
Building and Recognizing Quality School Systems DISTRICT ACCREDITATION © 2010 AdvancED.
PAT Market Information for Food Security Analysis Session 1.3 WFP Markets Learning Programme Price Analysis Training.
Community Planning 101 Disability Preparedness Summit Nebraska Volunteer Service Commission Laurie Barger Sutter November 5, 2007.
Evaluation design and implementation Puja Myles
Theory of Change Models Outcomes-Based Program Design Models.
Prepared by: Forging a Comprehensive Initiative to Improve Birth Outcomes and Reduce Infant Mortality in [State] Adapted from AMCHP Birth Outcomes Compendium.
Outcomes Thinking* Christine Jost Linking Knowledge with Action Research Theme KMC4CRP2 workshop, Addis Ababa, 4 December 2013 * Drawing from the presentation.
TST Market Information for Food Security Analysis Session 1.3 WFP Markets Learning Programme Trader Survey Training V2.
Open Forum: Scaling Up and Sustaining Interventions Moderator: Carol O'Donnell, NCER
Theory of Change Articulating your project’s design theory.
Chapter Two Copyright © 2006 McGraw-Hill/Irwin The Marketing Research Process.
Session 2: Developing a Comprehensive M&E Work Plan.
Capacity Building in: GEO Strategic Plan 2016 – 2025 and Work Programme 2016 Andiswa Mlisa GEO Secretariat Workshop on Capacity Building and Developing.
Stages of Research and Development
Monitoring and Evaluation (M&E) Plan
Monitoring and Evaluation Systems for NARS Organisations in Papua New Guinea Day 2. Session 5. Review of the organizational strategy.
Translating ideas into proposals for action programmes
Workshop to develop theories of change
Managing for Results Capacity in Higher Education Institutions
Monitoring and Evaluation Systems for NARS Organisations in Papua New Guinea Day 2. Session 6. Developing indicators.
FY 16 Refine and Implement
HEALTH IN POLICIES TRAINING
Developing & Refining a Theory of Action
program framework Articulate program goals
5.2 TOC Complementary Documentation
Session 4: SDG follow-up and review mechanisms
What do we need to learn about the Key Element?
4.1 Selecting Project Purposes and Outcomes
Theory of Change 1.1 Overview.
4.2 Identify intervention outputs
CATHCA National Conference 2018
5.1 TOC Transfer to Logframe & Indicators
4.3 Refining the TOC Diagram
Developing a shelter strategy
THEORY OF CHANGE VS. LOGICAL FRAMEWORK
Results Based Management for Monitoring & Evaluation
OGB Partner Advocacy Workshop 18th & 19th March 2010
Theory of Change 1.1 Overview.
Translating ideas into proposals for action programmes
Integrating Gender into Rural Development M&E in Projects and Programs
Project Logic, Indicators & ToC Group Exercise
Root Cause Analysis Identifying critical campaign challenges and diagnosing bottlenecks.
Presentation transcript:

Refining a Theory of Change 1 Barbara Reed & Dan Houston November 2014

Session Objectives: By the end of the sessions, participants will have validated and refined the project’s Theory of Change (ToC)’s Purpose Level diagrams. 2

Elements of a ToC: Diagrams Project Level Goal Diagram Project Level Goal Pathways of change that include all outcomes down to the immediate outcome level Outcomes that are critical to achieve the goal but will be produced by other actors Purpose Level Outcome Diagrams Purpose Level Outcome Pathways of change that include all outcomes and outputs Outcomes that are critical to achieve the goal but will be produced by other actors Assumptions 3

Part 1: Validating and Refining the Goal Program Goal: To reduce chronic malnutrition and food insecurity and build resilience among vulnerable populations in the districts of …... What is the evidence supports the need for the goal? Does the goal have any of the following logic pitfalls? Unclear wording Causality vs. Definition Two levels in one outcome How will the goal be measured? 4

Part 2: Validating and Refining the Outcomes Step 1: Based on evidence and your problem analysis; validate, refine and identify the outcomes that are necessary for the higher level outcome to be achieved  Review the higher level outcome and ask “how” the higher result will be achieved. Keep going until all of the outcomes that are necessary and sufficient to achieve the higher level outcome have been identified. 5

Part 2: Validating and Refining the Outcomes Step 2: Confirm and refine how the project outcomes contribute to the higher level outcome  Is the achievement of the project’s outcomes alone sufficient to achieve the higher level outcome?  How will other actors contribute to these outcomes?  If gaps remain, how will the necessary outcomes be achieved?  Do you have the necessary and sufficient resources in order to achieve the outcome? 6

Step 3: Ensure that there are the no logic pitfalls:  Unclear wording  Not using “if…then” logic (asking “how” going down and why going up the pathways)  Causality vs. Definition  Duplication of outcomes at different levels  Two levels in one outcome  Using “capacity building” in result  Not integrating gender and environment into logic 7 Part 2: Validating and Refining the Outcomes

Step 4: Validate, refine and measure the assumptions:  Rationales: Description of why the outcome is necessary for the achievement of the higher level outcome. What is the evidence that supports the validity of the assumption? What will happen if the assumptions fail? How can the project measure the assumptions?  Global assumptions: The contextual or environmental conditions that are out of the control of the project but which must exist for the outcome to produce the link to the higher level outcome. What is the evidence that supports the validity of the assumption? What will happen if the assumptions fail? How can the project measure the assumptions? 8 Part 2: Validating and Refining the Outcomes

Step 5: Identify how the project will measure the outcome (indicators):  Are there FFP or other standard indicators that would apply?  Is/Are the indicator(s) SMART? Specific Measurable Achievable Relevant Timely 9 Part 2: Validating and Refining the Outcomes

Sample Process Tracking Form Outcome / Output Rationale (why needed to reach higher outcome) w/ evidence Assumption (Contextual or Environment Preconditions) w/ evidence IndicatorsNotes/Follow -up Increased Access to Irrigation Irrigation facilitated multiple cropping seasons - Final Evaluation Cyclones will not damage the irrigation schemes more than once during the course of the project – NOAA Number of hectares under improved technologies or management practices as a result of USG (FFP) assistance 10

Identify outcomes or outputs that lead to multiple outcomes and organize accordingly Use color, shapes, fonts to clearly distinguish:  Purposes  Outcomes and pathways (arrows) addressed by the project  Outcomes and pathways addressed only by other actors  Project outputs  Other actors’ outputs  Assumptions or associated references* 11 Part 3: Organize and Develop the Purpose Level Diagram

Identify outcomes that lead to multiple outcomes and organize accordingly Use color, shapes, fonts to clearly distinguish:  Goal  Purposes  Outcomes and pathways (arrows) addressed by the project  Outcomes and pathways addressed only by other actors  Project outputs  Other actors’ outputs  Assumptions or associated references* 12 Part 4: Organize and Develop the Project Level Diagram

Identify outcomes that lead to multiple outcomes across different purposes & organize accordingly Use color, shapes, fonts to clearly distinguish:  Goal  Purposes  Outcomes and pathways (arrows) addressed by the project  Outcomes and pathways addressed only by other actors  Project outputs  Other actors’ outputs  Assumptions or associated references* 13 Part 5: Organize and Develop the Project Level Diagram

Part 6: Write the narrative Summarize the major elements of the ToC Describe and provide evidence on how the problem analysis, assumptions, rationales relate to the long-term goal, outcomes (especially for non-project implementers), pathways and interventions, on what is not readily absorbed from the diagram Describe collaboration with other actors, including how their necessary outputs will be monitored Assess the risks that assumptions may fail 14