ERCOT PUBLIC 10/21/2014 1 2014 LTSA Update October 21, 2014.

Slides:



Advertisements
Similar presentations
October 16, 2009 RPG Meeting ERCOT RPG Project Review Update Jeff Billo.
Advertisements

2015 RTP Update January, 2015.
KURTEN SWITCH PROJECT (BRYAN/ COLLEGE STATION AREA UPGRADES) Technical Advisory Committee December 1, 2005 Transmission Services.
January 5, 2012 TAC Cross Valley 345 kV Project Jeff Billo Manager, Mid-Term Planning.
ERCOT PUBLIC 10/21/ RTP Update October 21, 2014.
Valley Import Overview Jeff Billo Regional Planning Group Meeting July 22, 2014 Preliminary1.
ERCOT PUBLIC 5/20/ RTP July 22, ERCOT PUBLIC 5/20/ Outline  Updates to 2014 RTP  RTP Next steps.
ERCOT PUBLIC 8/19/ LTSA Scenario Results Updates August, 2014.
2011 Long-Term Load Forecast Review ERCOT Calvin Opheim June 17, 2011.
ERCOT PUBLIC 4/22/2014 Updates for 2014 LTSA Scenario and Data Assumptions 4/22/2014.
RTP Update RPG Meeting July 21, RTP update  Reliability analysis for the contingencies where load shed is not allowed is complete.
PLWG Report to ROS July 9, PGRRs needing vote PGRR043 – FIS Scoping Amendment – PGRR043 moves the Subsynchronous Resonance (SSR) Study out of the.
ERCOT PUBLIC 4/21/ Loss of Load Probability Assessment for NERC April, 2015.
JACKSBORO TO WEST DENTON 345-kV PROJECT Presentation to Technical Advisory Committee April 8, 2004 Transmission Services Operations.
Long Term Study Scenarios and Generation Expansion Update December 7, 2012.
2006 Reliability Study Scope Name Date. DRAFT 2 Purpose of Study Assess the PEC and Duke transmission systems’ reliability Develop a single reliability.
Long Term Study Task Force Update Transmission Study Practices and Methodologies April 5th,2011 LTS.
NRG Comments/Concerns with HIP Assumptions January 21, 2014 RPG Meeting NRG Comments/Concerns with HIP Assumptions - January 21, 2014.
10/03/ Report on Existing and Potential Electric System Constraints and Needs Within the ERCOT Region October 3, 2002.
2015 RTP – Study Scope of Short Circuit Analysis RPG Meeting May 19,
Jenell Katheiser Doug Murray Long Term Study Scenarios and Generation Expansion Update January 22, 2013.
ERCOT SCENARIO DEVELOPMENT STAKEHOLDER WORKSHOP CNP Discussion Points for Long-Term Scenarios ( ) January 23, 2014.
ERCOT PUBLIC LTSA Introduction. ERCOT PUBLIC 2 Outline  Background  2016 LTSA Process  Summary of first LTSA Workshop  Topics and Speakers.
ERCOT PUBLIC 5/20/ RTP Inputs and Assumptions-Updated April 22, 2014.
John Dumas Director of Wholesale Market Operations Jeff Billo Manager of Mid Term Planning Dan Jones Director with Potomac Economics, the ERCOT IMM Board.
ERCOT PUBLIC 5/20/ RTP Inputs and Assumptions May 20, 2014.
June 19, 2009 RPG Meeting ERCOT System Development Update Jeff Billo.
October 16, 2009 RPG Meeting ERCOT 2009 Five-Year Transmission Plan Update Jeff Billo.
ERCOT PUBLIC 4/22/ RTP Inputs and Assumptions April 22, 2014.
December 7, 2012 Transmission Needs Analysis Scenario 5/7 Update.
MISO Northwest Exploratory Study Presented to National Wind Coordinating Committee Participants in study – MISO, Various utilities in Minnesota, North.
ERCOT PUBLIC 6/17/ LTSA Load Distribution Methodology June 17, 2014.
November 12, 2010 Regional Planning Group Long-Term System Assessment Project Update Warren Lasher Manager, Long-Term Planning and Policy Jonathan Rose.
2016 Long-Term Load Forecast
ERCOT PUBLIC 10/7/ Load Forecasting Process Review Calvin Opheim Generation Adequacy Task Force October 7, 2013.
JACKSBORO TO WEST DENTON and WEST LEVEE TO NORWOOD 345-kV PROJECTS April 20, 2004 Transmission Services Operations.
May 11, 2012 RPG meeting YTP Scope and Process – RPG Comments.
TAC02/01/2007 DW 1 TAC Briefing on: - Report on Constraints and Needs: Five Year Plan Development - Long Term System Assessment (LTSA) - Entergy Integration.
February 13, 2009 RPG Meeting ERCOT System Development Update Jeff Billo.
Current Operational Challenges Computing the West – North Limits Potential IROLs Local Voltage & Thermal issue (OOME) High Voltage Outages.
Long Term Study Resource Expansion Process: Study Findings and Lessons Learned Jenell Katheiser Doug Murray RPG May 21, 2013.
ERCOT PUBLIC November RPG Meeting RTP – Study Scope November 20, 2015.
RPG: September 24, Long-Term System Assessment Introduction Jeff Billo, Manager, Transmission Planning September 2013 Regional Planning Group.
September 1, 2011 TAC Lower Rio Grande Valley Regional Planning Group Project Jeff Billo Manager, Mid-Term Planning.
OPSTF – Issue 7 Long-term unavailability of autotransformers.
Panhandle Renewable Energy Zone (PREZ) Study
May14, 2010 RPG Meeting Houston Import Study Update Jeff Billo.
2006 Report on the Capacity, Demand, & Resources for the ERCOT Region Technical Advisory Committee June 1, 2006 Kenneth A. Donohoo. P.E. Manager, Transmission.
Transmission Services Report: North and West RPG Projects Bill Bojorquez TAC July 7, 2005.
ERCOT PUBLIC 3/25/ RTP Inputs and Assumptions March 25, 2014.
ERCOT PUBLIC 5/20/ LTSA Current Trends Scenario Results May 20,2014.
ERCOT PUBLIC LTSA Introduction. ERCOT PUBLIC 2 Outline  Background  2016 LTSA Process  2016 Scenario Development Process  2016 LTSA Schedule.
ERCOT – MISO DC Tie Study Regional Planning Group November 20, 2015.
April 13, 2007 Regional Planning Group Meeting Wind Impact/Integration Analysis Warren Lasher Regional Planning.
03/06/2008 TAC CREZ Transmission Optimization (CTO) Study Update Dan Woodfin Director, System Planning.
2016 LTSA Update Doug Murray 6/21/2016. Agenda Introduction Scenario Retirement Process Scenario Summary Results Appendix.
1 ERCOT 2015 West Texas Study November 18, 2014 Jeff Billo.
LTSA Scenario Development Workshop
Economic Forecast Review
Freeport Area Master Plan Project -
2018 LTSA Workshop August 2017 RPG Meeting Welcome to.
Transmission Planning in ERCOT- Overview
2016 RTP Update November, 2016 RPG Meeting.
Barrilla Junction Area Transmission Improvements Project
ERCOT 2011 Five-Year Transmission Plan Update
ERCOT 2009 Five-Year Transmission Plan Update
Director, Transmission Services
Load Scaling PGRR042.
TAS Quarterly Meeting November 2-3, 2016 Michael Bailey, P.E. WECC
TAS Quarterly Meeting November 2-3, 2016 Michael Bailey, P.E. WECC
Presentation transcript:

ERCOT PUBLIC 10/21/ LTSA Update October 21, 2014

ERCOT PUBLIC 10/21/ Outline  LTSA update  Case summary  Reliability analysis results  Next steps

ERCOT PUBLIC 10/21/ LTSA Update  Four scenarios were shortlisted for transmission analysis based on stakeholder feedback  Current Trends (CT)  High Economic Growth (HEG)  Stringent Environmental (SE)  Global Recession (GR)  Reliability cases were prepared per the LTSA scope  Final 2013 RTP case for the year 2018 was used as a start case  90 th percentile load forecast by weather zone was used for the cases  Additional generation was added based on the outcome of generation expansion analysis  Generation siting methodology was used to keep siting consistent across scenarios

ERCOT PUBLIC 10/21/ Case Summary: 2029 Reliability Case (summer peak) ScenarioLoadGeneration*SolarWind CT HEG GR SE *Total generation available for reliability analysis under summer peak condition per the LTSA scope

ERCOT PUBLIC 10/21/ Impact of solar adds  The LTSA scenario assumptions lead to significant solar additions in the next decade  Amount of utility solar increases from 150 MW to about 10,000 MW  Solar output is known to be co-incident with the demand

ERCOT PUBLIC 10/21/ Impact of solar adds on the load shape

ERCOT PUBLIC 10/21/ Reliability Analysis Summary (Preliminary Results) Study Region Constrained Element Scenarios Where Violated Years Where Violated CTSEGR Coast Surfsi – Quintana – Freeport 138-kV Line X XX X X Jordan – Cities – Winfree – Brine – Langston – Mont Belvieu 138-kV Line X X X X Greenbelt – Tejas – Comanche 138-kV Line X X X X Dow 345/138-kV Autotransformers A1 and A2 X X X South Texas – Dow 345-kV Lines X X Peters – Foster – Flewellen 138-kV Line X X East Mt Enterprise – Trinidad 345-kV Line X X Richland – Big Brown 345-kV Line X X

ERCOT PUBLIC 10/21/ Reliability Analysis Summary (Preliminary Results) Study Region Constrained Element Scenarios Where Violated Years Where Violated CTSEGR North Central Hicks Switch – Alliance / Roanoke 345-kV double circuit line XX- - X Benbrook 345/138-kV autotransformers XXX -X Collin Switch 345/138-kV autotransformer #1 XX- XX Northwest Carrollton 345/138-kV autotransformer X - - X Eagle Mountain SES 345/138-kV autotransformers XX- -X Hicks Switch 345/138-kV autotransformer XXXXX Roanoke Switch 345/138-kV autotransformers XXX X Royse Switch 345/138-kV autotransformers X- - X- West Uvalde – W. Batesville 138 kV line XXX Brackettville – Hamilton 138-kV line XX

ERCOT PUBLIC 10/21/ Reliability Analysis Summary (Preliminary Results) Study Region Constrained Element Scenarios Where Violated Years Where Violated CT HE SEGR South La Palma 345/138-kV autotransformer and surrounding 138-kV lines XX XX Loma Alta 345/138-kV autotransformer and surrounding 138-kV lines XX XX South Central Clear Springs - Marion - Skyline 345-kV lineXX Bracken 345/138-kV autotransformerXX

ERCOT PUBLIC 10/21/ Next steps  Complete N-1, G-1 + N-1 and X-1 + N-1 reliability analysis  Compile list of reliability projects for different scenarios  Complete economic analysis  Summarize results in the 2014 LTSA