Hydraulic Screening and Analysis Needed for USACE Review

Slides:



Advertisements
Similar presentations
Flood Risk Analysis – the USACE Approach
Advertisements

Understanding Active and Passive Floodproofing Options for Non-Residential Buildings in a Special Flood Hazard Area Course Number: SV003 Learning Units:
Effective Contract Management Planning
BUILDING STRONG ® Do not include this Slide. This template is a guide for preparing power points presentations. The information requested is important.
Hazard Mitigation Planning I Session Name: Hazard Mitigation Planning I Coastal Hazards Management Course Signed by the President on October 30, 2000 Amends.
May 22, 2012 Charlotte-Mecklenburg Flood Risk Assessment and Risk Reduction Plan ASFPM 2012 Annual Conference Timothy J. Trautman, P.E., CFM Flood Mitigation.
Need For Updating Alluvial Fan Floodplain Delineation Guidelines: An ASFPM Discussion Paper ASFPM National Conference Louisville, Kentucky May 19, 2011.
US Army Corps of Engineers BUILDING STRONG ® Methods for Determining Maximum Flood Elevations Landward of Failed Levees: An Example from the Great Missouri.
City of Fargo Meadow Creek Area Flood Risk Management – Project 5944 Public Information Meeting June 21, 2010.
Design of Hydraulic Controls & Structures
Agenda Item 9 Sutter Bypass CVFPB Meeting April 17, 2009.
Risk Map Early Demonstration Project Lackawanna County, PA CCO Meeting September 13, 2011.
US Army Corps of Engineers BUILDING STRONG ® Overview of Public Law (PL) Advanced Measures Contingency Operations Directorate.
HEC-RAS US Army Corps of Engineers Hydrologic Engineering Center
COMPREHENSIVE FLOODPLAIN MANAGEMENT : Promoting Wise Uses of Floodplains CA Department of Water Resources/ CIFMCG Workshop July 2006.
HEC-RAS.
Kansas City Industrial Council Hydrology and Hydraulics
US Army Corps of Engineers BUILDING STRONG ® Missouri River Flood Task Force (MRFTF) Concept Briefing
Flood Risk Review Meeting: [Watershed Name] [LOCATION] [DATE]
Flood Risk Management Program Rolf Olsen Institute for Water Resources U.S. Army Corps of Engineers.
COMPREHENSIVE FLOODPLAIN MANAGEMENT : Promoting Wise Uses of Floodplains CA Department of Water Resources/ CIFMCG Workshop July 2006.
Acquisition of Flood Control Easements Triangle High-Ground Area City of West Sacramento, Yolo Co. Meeting of the Central Valley Flood Protection Board.
US Army Corps of Engineers BUILDING STRONG ® Consequence Assessment for Dam Failure Simulations Kurt Buchanan, CFM Economist Mapping, Modeling, and Consequences.
ASFPM – May 24, 2012 CASE STUDY – 408 PERMITTING AND LEVEE ACCREDITATION FOR WATERLOO, NEBRASKA ASFPM MAY 24, 2012 Presented by Randy Behm, PE, CFM Lalit.
US Army Corps of Engineers BUILDING STRONG ® Prioritizing Investments within the USACE Levee Safety Program Process and Methodology Overview Jason Needham,
Proposed Benefit Assessment District Overview Three Rivers Levee Improvement Authority (TRLIA) TRLIA.ORG March 10,
US Army Corps of Engineers Coastal and Hydraulics Laboratory Engineer Research and Development Center Lower Susquehanna River Watershed Assessment Two.
Beargrass Creek Case Study Description of the Study Area Hydrology & Hydraulics Economic Analysis Project Planning Assessment of the Risk Based Analysis.
An update from the National Committee on Levee Safety Presented to the TWCA by Karin M. Jacoby, PE, Esq. June 17, of 14An Involved Public and Reliable.
1 Flood Hazard Analysis Session 1 Dr. Heiko Apel Risk Analysis Flood Hazard Assessment.
BUILDING STRONG ® Do not include this Slide. This template is a guide for preparing power points presentations. The information requested is important.
Advances in Alluvial Fan Floodplain Delineation & Modeling A Call For Action ASFPM Arid Regions Committee May 2010.
Unimpaired connectivity between active channel and floodplain Eliminated connectivity between active channel and floodplain Impaired connectivity between.
Hazard Mitigation Planning and Project Funding. Agenda Objectives Overview of Hazard Mitigation Hazard Mitigation Planning Mitigation Project Funding.
Corps of Engineers Levee Safety Program Levee Safety Program Manager
Ventura County Levee Systems Levee Certification Compliance Efforts Presentation to the Ventura County Watershed Protection District Board of Supervisors.
FEMA FLOOD INSURANCE STUDY UPDATES City Council Workshop July 7, 2008.
Integrated Risk Management Charles Yoe, PhD Institute for Water Resources 2009.
Our Mission MITIGATIONS. MEANING OF MITIGATION MITIGATION IS THE PERMANENT REDUCTION OF THE RISK OF DISASTER MITIGATION IS THE PERMANENT REDUCTION OF.
Responses to Levee Certification Requests 1.Closures 2.Maintenance Plans 3.U/S and D/S Levee Tie-ins.
Three Rivers Levee Improvement Authority June 8, 2007 Presentation to the State Reclamation Board Proposed Feather River Setback Levee.
Prepared by: Burnham – Floodplain Study October 23, 2009 Presented by: Marty Spongberg, PhD, PE, PG AMEC Geomatrix, Inc.
U.S. Department of the Interior U.S. Geological Survey Marie C. Peppler USGS FIM Program Liaison Flood Inundation Mapping Program Project needs overview.
Pathogen Reduction Dialogue Panel 3 Microbial Testing for Control Verification Robert L. Buchanan U.S. Food and Drug Administration Center for Food Safety.
Central Valley Flood Protection Board Meeting – Agenda Item No. 6B APPLICATION NO
September 23, 2010 Overview of DWR’s Flood Management Activities Related to the Delta A Briefing to the Delta Stewardship Council 1.
Melinda Terry, Executive Director CA Central Valley Flood Control Association 1.
US Army Corps of Engineers BUILDING STRONG ® Boise River Feasibility Study Ellen Berggren, PMP Outreach Coordinator/ Project Manager Idaho Governor’s Roadless.
1 An Approach to Levee Assessment and Contingency Planning Presentation to the National Waterways Conference 7 September 2006 Portland, Oregon By Rob Vining.
Presented to: Central Valley Flood Protection Board August 23, 2013 Sacramento Area Levee Accreditation Key Results from Encroachment Analysis.
Central Valley Flood Protection Board Meeting – Agenda Item No. 9A CVFPB MEETING – October 25, 2013.
Life-Cycle Flood Risk Management
US Army Corps of Engineers BUILDING STRONG ® Emergency Response Policy Revision Update ( ER & EP ) Jeffrey Jensen CECW-HS USACE Flood Risk Management.
Sally McConkey, P.E., D.WRE., CFM Illinois State Water Survey ASFPM Chair USACE Silver Jackets Workshop – August 2012.
David Moser USACE Chief Economist
Flood Inundation Mapping Program
Central Valley Flood Protection Board Meeting – Agenda Item No. 8A Informational Briefing Presented By Board Staff and CH2MHill Consultants Model Funded.
2 West Sacramento, California Project General Reevaluation Report Letter of Support for the West Sacramento General Reevaluation Report Agenda Item 4G:
4.0 Unit 4: BFE Considerations. 4.1 Objectives At the end of this unit, you should be able to:  List potential data sources for determining BFEs in A.
2 American River Common Features General Re-evaluation Report Request for Board Approval of Letter Requesting Consideration of Locally Preferred Plan (LPP)
US Army Corps of Engineers BUILDING STRONG ® Name of Levee Segment Presenter Name Presenter Title Duty Location Date of Presentation.
BUILDING STRONG ® 1 Risk Management Center Silver Jackets Program Overview Jennifer Dunn USACE, Institute for Water Resources Silver Jackets Program Manager.
GETTING CLIMATE CHANGE INTO TRANSPORT CBAS Mberande River Crossing Case Study Craig Lawrence Advisor - Infrastructure Economics CPIU – MID 17 February.
West Sacramento Area Flood Control Agency November 10, 2011 Update on Current Levee Construction Projects and on the Southport Sacramento River Levee Early.
Preliminary Engineering Analysis and Design Foxcroft Colony and Mosby Woods Condominiums Prepared for: City Council Work Session November 3, 2015.
Yolo Bypass Salmonid Habitat Restoration & Fish Passage Environmental Impact Statement Environmental Impact Report Information Presentation to YBFEPT July.
US Army Corps of Engineers BUILDING STRONG ® Miles City, Montana Section 205 Gwyn M. Jarrett - Project Manager Omaha District April 27, 2016.
IT Infrastructure Amna Riaz007 Tayaba Ashraf008.
May, 1999 Bridges This module will cover bridges and how they are input into HEC-RAS. 9/21/2018.
FEMA FLOOD INSURANCE STUDY UPDATES
Presentation transcript:

Hydraulic Screening and Analysis Needed for USACE Review Greg Kukas, P.E. Chief, Hydrology and Hydraulics Branch U.S. Army Corps of Engineers (USACE), Sacramento District July 25, 2014

Overview USACE role Encroachment permit review process Hydraulic analysis review Risk impact assessment Thresholds used Screening-level analysis approach Additional analysis requirements Concerns and challenges

USACE Role Why does USACE review CVFPB permits? As a requirement of: Project Partnership Agreements & O&M manuals 33 USC 408 33 CFR 208.10 To assure ongoing performance of a federal project – i.e. acceptable flood risk impacts of proposed ‘encroachments’

Encroachment Review Process How does USACE fulfill its role? Geotechnical engineering review – assures the integrity of effected levees Assess flood risk impacts of the encroachment Hydraulic analysis review: verify the hydraulic changes expected to result from an encroachment Flood risk impact assessment: evaluate the acceptability of those changes from flood risk perspective

Hydraulic Analysis Review Fundamental concerns: Representative flow condition considered? Appropriate modeling tool and approach applied for the encroachment scenario? Sufficient detail used? Results accurate?

Hydraulic Analysis Review Representative flow conditions: Required: Original 1955/57 project design flows or O&M Manual specified flow Supplemental: Published 1/100 and/or 1/200 annual chance exceedance flows (i.e. “100-yr” or “200-yr” floods) USACE hydrology study FEMA base flood

Hydraulic Analysis Review Standard hydraulic modeling procedures: Select appropriate, relatively current model* Multiple sources: Corps, DWR, Consultants Multiple platforms: HEC-RAS, RMA2, FLO-2D, TuFlow Multiple versions accepted Refine model in vicinity of the proposed encroachment represent current condition Revise model to reflect ‘encroached’ conditions Physical obstructions: geometry changes Vegetative conditions: roughness coefficients Operational assumptions: debris loading Compare results * - Key assumption: current conditions used as a baseline

Hydraulic Analysis Review Key hydraulic results: Water surface elevations (i.e. flood stages) Flow velocities and shear stress (relates to erosive force) At locations of maximum increase Usually located just upstream of the project Diminish in upstream direction Adjacent to levees or floodwalls Highway traffic analogy

Flood Risk Impact Assessment How do hydraulic changes effect flood risk in the federal/state system? Risk = probability x consequences Flooding probability factors: Hydrology & hydraulics – frequency of flows with flooding potential Levee performance – factors: slope/stability, seepage, erosion, maintenance, flood fighting, visibility, etc. Flooding consequence factors: Population & damageable property Critical infrastructure and egress routes Floodplain depths & warning times Available freeboard Answer: it varies depending on setting-specific factors Models available to more completely assess flood risk are cost-prohibitive and have their own limits. USACE risk analysis requirement imposed on Section 408 permit situations is not applied.

Flood Risk Impact Assessment How do we assess how hydraulic changes affect flood risk associated with the federal/state system? Recognize the reliability of computed hydraulic effects Treat all settings as equal Apply professional judgment Adopt a prudent threshold criteria to account for the uncertainties and simplifying assumptions involved Assume negligible increase in flood risk if maximum increase in flood stage < 0.1’

Flood Risk Impact Assessment Why does USACE use 0.1’ as its acceptance threshold? It’s significantly less than the levee freeboard values incorporated into the design of the system It mitigates the potential for significant cumulative effects It’s comparable to the effects of the natural and dynamic characteristics of our system Because greater flood stage increases may be determined acceptable on a case by case basis with additional analysis and/or evaluation

Screening-level Analysis Simplified approach developed by USACE: For physical obstructions, if blocked area is < 1% of total cross-sectional area: Negligible flood risk increase is assumed No hydraulic analysis is required Supported by USACE-conducted hydraulic analysis Allows most truly minor encroachments to pass a “common sense”-type test with little less effort

Additional Analysis Requirements Detailed in USACE July 21, 2014 letter to CVFPB Closely coordinated with CVFPB staff Formalizes screening process and criteria Establishes 30-day window for USACE to request additional info Specifies debris loading assumptions for vertical blockage elements (e.g. bridge and dock piers)

Additional Analysis Requirements Debris loading assumptions:

Concerns & Challenges Cumulative impacts When additional info needed Borderline results: slightly > 1% blockage slightly > 0.1’ stage increase Unique physical situations Staff turnover and other resourcing demands Constrained funding DWR-developed library of models concept.