Implementation of IED Implications for industry, particularly those involved in waste management, and the influences it has on permitting Dynes Solicitors.

Slides:



Advertisements
Similar presentations
Best Available Techniques (BAT)
Advertisements

ADBA PERMITTING WORKSHOP 27 March 2013 Stephen Barnes, Technical Director, Wardell Armstrong.
1 VALENCIA FEBRUARY 2008 STUDY VISIT ON BEST PRACTICES IN WASTE MANAGEMENT INFRA VALENCIA FEBRUARY 2008 Incineration of Waste.
Industrial Emissions Directive Overview. Purpose Update IPPC Directive Update IPPC Directive Combine sectoral directives into a single text Combine sectoral.
The Industrial Emissions Directive (IED) 2010/75/EU
29/04/04 Landfill Directive 1999/31/EC Colin Gray 29 April 2004.
Anaerobic Digestion (AD) A sustainable energy production and waste management solution for your business Robert Crow 30 September 2014.
Waste Derived Fuels NERF, 6 th June 2013 Kirk Bridgewood Derwentside Environmental Testing Services.
Consultant: CMDC Joint Venture Application of BAT in IPPC/EIA Experience in EU Member States Per Ponsaing COWI.
Evaluating if a site requires single collections – applying the TEEP test.
MF Regulations & Separate Collections Linda Crichton.
SWWMG: MARCH 2013 LEGISLATION UPDATE. UPDATES  Industrial Emissions Directive  Waste Carrier/Brokers and Dealers (reminder)  The Packaging Regulations:
Law approximation and implementation in Hungary Ministry for Environment Department of Integrated Pollution Control Nicosia, May 2001 Andrea Nám, desk.
Biofuels and (Waste) Legislation- Presentation to Funding and Legislation Workshop 29 th March 2011 Dave Gorman Head of Environmental Strategy Scottish.
Grupowa Oczyszczalnia Ścieków Łódzkiej Aglomeracji Miejskiej Fot: U. Czapla Practical aspects of compliance with the Integrated Permit requirements based.
Environmental Permitting Regulations Tom Fowler – Environment Officer
Annual Conference 2008 Future Challenges for the Waste Management Industry Waste Framework Directive - Impact on the European Waste Management Industry.
The Scottish Pollutant Release Inventory (SPRI) Bob Boyce - SEPA Senior Environmental Assessment Officer.
Legislation Update Mark Stouph Director of Risk Management.
The Waste (England and Wales) Regulations 2011 Came into force on 29 th March 2011 Update some aspects of waste controls Regulations implement the revised.
The Environment Agency Alasdair McKellar – PPC/COMAH Regulatory Officer.
Industrial Emissions Licensing (IEL) Registration Web-form Stuart Huskisson Inspector Environmental Licensing Programme Horse & Jockey 14 th August 2013.
CENTRALIZED WASTE TREATMENT 40 CFR 437 Lessons Learned.
1 Inspection of LCPs: System for Inspection. ECENA Training Workshop Bristol, March 2008.
An overview of the industrial emissions Directive Richard Vincent Head of Industrial Pollution Control Department for Environment, Food and Rural Affairs.
Proposed Regulated Waste Framework Julian Chan - EHP.
Workshop, 12/3/2004 Banska Bystrica – SLOVAC REPUBLIC “INTEGRATED LICENCE PROCEDURE (Greek case)” Katerina Iakovidou-Anastasiadou Hellenic Ministry for.
Site visit COVEX Site visit Visit to COVEX, S.A Comunidad de Madrid CONSEJERIA DE MEDIO AMBIENTE, VIVIENDA Y ORDENACIÓN DEL TERRITORIO.
IPPC Directive state of play and future developements
Fichtner Consulting Engineers UK Covanta Energy Ltd Content of Environmental Permit Application Nick Gamble.
Review of practice of ELVs and other conditions setting in EU member states for non-Annex I installations Valts Vilnītis.
TRANSPOSITION AND IMPLEMENTATION OF THE IPPC, LCP, SEVESO II, VOC DIRECTIVES – EXPERIENCE AND LESSONS LEARNT Kalin Iliev Nikolay Savov Ministry of Environment.
The IPPC Directive and its implementation Alexandre Paquot European Commission Environment Directorate-General Phare Capacity.
Main Requirements on Different Stages of the Licensing Process for New Nuclear Facilities Module 4.1 Steps in the Licensing Process Geoff Vaughan University.
1IndustrialEmissionsDirective. 2 The European Parliament is discussing the Industrial Emissions Directive as adopted by the Council for the second reading.
IPPC vs Emissions Trading Lesley James Friends of the Earth (England, Wales & N.Ireland) and the European Environmental Bureau.
ENVIRONMENTAL PERMITTING 1 Environmental Law. Environmental Permitting 2 Environmental Permitting (England and Wales) Regulations 2007 introduced a new.
Legislation Update : SWWMG March HAZARDOUS WASTE REGULATIONS Changes to commence in June 2015 Risk phrases and danger categories will be replaced.
Priority Environmental Investment Programme National Workshop Serbia Overview Of EU Waste Policy Belgrade, 8 th May 2008 Ruslan Zhechkov, REC
REVISION OF THE IPPC DIRECTIVE  DIRECTIVE ON INDUSTRIAL EMISSIONS.
Recommendation of the European Parliament and of the Council of 4 April 2001 providing for Minimum Criteria for Environmental Inspections in the Member.
Exemptions Review Tessa Bowering Senior Environment Officer.
The Permitting Process under the Pollution Prevention and Control (Scotland) Regulations Ian Halliday Senior Policy Officer.
IED, BAT and Derogations Richard Wood URS Leeds 22 nd May 2013.
1 Short overview of the implementation of IPPC, LCP, Seveso II, Waste Landfill and Incineration directives Short overview of the implementation of IPPC,
SWWMG: September 2015 LEGISLATION UPDATE. UPDATES  Hazardous waste  Duty of Care  Fire Prevention Plans.
Manure Wastewater Handling & Storage Summary CNMP Core Curriculum Section 4 – Manure Wastewater Storage and Handling.
Creating the environment for business Streamlining industrial emissions legislation Caspar Corden (Entec) Andrew Farmer (IEEP) IPPC Review Advisory Group.
The current legal situation
1 Review of the IPPC Directive and related legislation Second Meeting Of Working Group E On Priority Substances 17 October 2007 Filip FRANCOIS – DG ENV.
Creating the environment for business Assessment of the Implementation by the Member States of the IPPC Directive Advisory Group Meeting Friday 13 th January.
25 September 2008 Risk Communication New and Emerging Waste Treatment Technologies – A Risk Communication Challenge Mike Studden Regional Head of Environmental.
Paul Fernee - Technical Advisor Industry and Waste Tech Services National Operations Technical Services Management of Air Pollution Control Residues from.
Workshop on Introducing integrated pollution control system – Kiev, 25 – 26 January, European IPPC Bureau Main conditions for forming the integrated.
Introduction to new projects relevant for the IPPC review - Advisory Group 26 October.
IPPC A general overview Nigel Barraclough Policy Adviser Industrial Pollution Control Branch Air and Environment Quality Division. Taiwanese Environmental.
Environmental Permitting legal requirements
Ascending to IED compliance
MJAC Founded 1928 December 2016
EU draft Community Guide to Good Hygiene Practice for the use of animal feed in primary production « Workshop on feed safety, marketing and use of feed.
First position of the Belgian industry about the
Ascending to IED compliance
IPPC and refineries: England and Wales
Georgia Update Jeff Cown Land Protection Branch
The IED: Industrial Emissions Directive DG ENV. C
Karl Vrancken – VITO Advisory Group Meeting 8 December 2006
IPPC Review Stakeholder Hearing
Reduction of total releases from unintentional production of POPs
DG ENV C3 Industrial Emissions, Air Quality and Noise 20 January 2012
Data specifications for IED Annex II Module 4
Presentation transcript:

Implementation of IED Implications for industry, particularly those involved in waste management, and the influences it has on permitting Dynes Solicitors - Consultancies Meeting 11 th September 2014 Martin Jenkins Permit Review Lead National Permitting Service, part of National Services E&B

What are we going to cover What is IED? How is it implemented in England and Wales What might this mean for those treating or storing waste What should they do to remain compliant with the Regulations What does the future look like? 2 'Implementation of Dynes Solicitors Consultancies Meeting, 9th September 2014

What is IED? Industrial Emissions Directive (2010/75/EU) Brings together and updates 7 older pieces of EU legislation integrated pollution prevention and control (IPPC), large combustion plants, waste incineration, activities using organic solvents and three on titanium dioxide production More prescriptive about technical standards, about openness and about reporting decisions Joins other EU Directives as a central plank to consistent control of environmental risk and related waste markets across Europe that we see driving our regulatory controls 3'Implementation of Dynes Solicitors Consultancies Meeting, 9th September 2014

Implementation in England & Wales Amendment to the Environmental Permitting (England and Wales) Regulations 2010 {SI 2010 No. 675} The Environmental Permitting (England and Wales) (Amendment) Regulations 2013 – {SI 2013 No. 390} Unofficial consolidated version Unofficial consolidated version of EPR available Installation activities reference descriptions & capacities in Schedule 1 to EPR; anyone treating, storing or disposing of waste; discharges to water environment Existing regulatory guidance notes, technical guidance notes, application forms, charging mechanisms and interpretation documents remain largely unchanged 4'Implementation of Dynes Solicitors Consultancies Meeting, 9th September 2014

Key Dates for Implementation New Installations needed to be compliant on 7 th January 2013 Existing Installations came under the scope of IED on 7 th January 2014 Some existing waste operations now defined as Installations need to be compliant by 7 th July 2015 If the waste facility wasn’t in operation on 7 th January 2013 it needs to be permitted as an installation before it starts processing waste 5'Implementation of Dynes Solicitors Consultancies Meeting, 9th September 2014

Which waste operations? ActivityDescription 5.3recovery of hazardous waste in an installation with a capacity over 10 tonnes per day by biological (R3) or physico-chemical treatment (R3, R5-R8), blending, mixing or repackaging, or surface impoundment 5.4 a)disposal of non-hazardous waste in an installation with a capacity over 50 tonnes per day by biological (D8) or physico-chemical treatment(D9), pre-treatment for incineration or co- incineration (D8 or D9), treatment of slags and ashes (D9) or treatment in shredders of metal waste(D9). This daily capacity threshold is increased to 100 tonnes per day if the only waste treatment activity is anaerobic digestion 5.4 b)paragraph (b) of section 5.4 in relation to the recovery or a mix of recovery and disposal of non- hazardous waste in an installation with a capacity over 75 tonnes per day by biological treatment (R3), pre-treatment for incineration or co-incineration(R3, R5), treatment of slags and ashes (R4, R5) or treatment in shredders of metal waste (R4). This daily capacity threshold is increased to 100 tonnes per day if the only waste treatment activity is anaerobic digestion 5.6section 5.6 in relation to the temporary or underground storage of hazardous waste with a capacity over 50 tonnes (R13, D15); 6.8 paragraph (d) in relation to the treatment and processing of animal and vegetable raw materials for food and feed 6'Implementation of Dynes Solicitors Consultancies Meeting, 9th September 2014

What do some of these words mean? Recovery vs. Disposal Focus on the intent of the treatment process Capacity If the site has either the legal or physical capacity it needs re-permitting For bio-waste treatment this is the maximum tonnage of waste on site at any one time divided by the minimum retention time Pre-treatment of waste for incineration Unfortunately this remains unclear. We await the outcome of an on-going discussions with DEFRA around the intentions of the Directive We are not seeking applications for this activity until clarity is provided Haz waste storage ‘pending any of the activities listed in Sections 5.1, 5.2, 5.3 and paragraph (b) of this Section’ 7'Implementation of Dynes Solicitors Consultancies Meeting, 9th September 2014

To remain compliant Submit a duly made application by the relevant date for your existing activity 30th September 2014 for Section 5.4 b) - recovery or a mix of recovery and disposal of non-hazardous waste 31st December 2014 for Section recovery of hazardous waste & Section 5.4 a) - disposal of non-hazardous waste 31st March 2015 for Section temporary or underground storage of hazardous waste & Section 6.8 d) - treatment and processing of animal and vegetable raw materials for food and feed Age of your existing permit dictates costs & information No technical assessment for permits issued since 2007 hence free admin Normal variation for older permits Use the Duly Made Checklist to guide what info is needed 8'Implementation of Dynes Solicitors Consultancies Meeting, 9th September 2014

Key points of the checklist Use questionnaire to see if you are caught All facilities need to: Ask for a new activity to be added to their permit define ‘the installation’, it’s capacity, what is related and dependant on that element of the facility The waste types accepted (by EWC code) Plans showing emission points Normal variations need to demonstrate they protect the environment by using modern standards Appropriate measures for waste activities ≈ BAT Application fee For normal variations is Waste Opra x £140 9'Implementation of Dynes Solicitors Consultancies Meeting, 9th September 2014

What does the future hold? Much greater reliance on operators management systems to define and control activities at the facility Subsistence costs for installation facilities generally higher than subsistence for waste facilities Plans being developed for sector based reviews of existing permits 10'Implementation of Dynes Solicitors Consultancies Meeting, 9th September 2014

Any Questions? Martin Jenkins IED & Permit Review Lead National Permitting Service, part of National Services E&B