Analysis of Available oneM2M Certification Models TST 15.3 Source: JaeSeung Song (WG6 Chair, Sookhyun Jeon (TTA,

Slides:



Advertisements
Similar presentations
Armand Racine Consultant Chemicals Branch
Advertisements

Transport Study to support an impact assessment of the Urban Mobility Package on SUMPs CoR Meeting June 13 DG MOVE.
Compliance Testing Program TST (WG6) Source: Seon, Dt&C (TTA), Meeting Date: TST WG6_Compliance Testing.
Compliance Testing Program
Analysis of oneM2M Certification Model TST 15 Source: Sookhyun Jeon, TTA, Meeting Date:
Test WG (WG6) 2015 Planning TST 15 Source: JaeSeung Song, TST WG Convenor (TTA), Meeting Date: TST WG6_2015_planning.
TST WG Progress Report at TP 15 Group Name: TST WG Source: TST WG Chair, JaeSeung Song (KETI) Meeting Date: to , Miami, USA Agenda.
Delivering Service through Intermediaries. Service Provider Participants Service principal (originator) creates the service concept (like a manufacturer)
ANSI ISO ICCA Program. ISO Standards ISO sets an internationally recognized benchmark to assure that the certification organization meets the set.
EUROPEAN COMMISSION Objective 3 Territorial Co-operation Workshop 3: EUROPEAN GROUPING OF CROSS BORDER COOPERATION DG Regional Policy Brussels,
PROPOSALS THE REVIEW OF THE 1958 AGREEMENT AND THE INTRODUCTION OF INTERNATIONAL WHOLE VEHICLE TYPE APPROVAL (IWVTA) IWVTA Informal Group WP th Session.
ACCESSIBILITY IN POLICIES DOCUMENTS WORKING GROUP1 WP: 3 Author: Sashka Parvanova Place and date: Budapest 29 March 2012 Project partner: REGVRATSA BG.
TST WG Progress Report at TP 18 Group Name: TST WG Source: TST WG Chair, JaeSeung Song (KETI) Meeting Date: to Agenda Item: TP18,
Workshop: Public Employment Services  Organized by:  Inter-American Network for Labor Administration (RIAL)  Panama City  December 10 and 11, 2008.
Asta Sihvonen-Punkka Director General of EMA Vice-Chair of ERGEG Baltic Electricity Mini-Forum 24 th of April, 2009 Riga The 3 rd Package – implied changes.
Policy Council and Program Planning. The Head Start Program Planning Cycle National Center on Program Management and Fiscal Operations (PMFO)
Ravi Subramaniam – Technical Director, ICAP 22 September 2012 Geneva, Switzerland IEEE Conformity Assessment Program (ICAP) for SIEPON 22 September
Workshop on the Insurance Core Principles IV Conference on Insurance Regulation and Supervision in Latin America Punta Cana, May Makoto Okubo,
| 1 Guido de Wilt DG TREN D4 EUROPEAN POLICY REGARDING MICRO-CHP EUROPEAN COMMISSION.
Integration Development Programme in the Field of Statistics of the Eurasian Economic Union for EEC THE EURASIAN ECONOMIC COMMISSION.
Recognition: the national centre and the ENIC Network Seminar on the recognition of qualifications Baku, 22 April 2005 Gunnar Vaht Head of the Estonian.
Interoperability event proposal Group Name: WG TST Source: Sookhyun Jeon, TTA, Laurent Velez, ETSI, Meeting Date:
Summary of main questions on the Partnership Agreement and the secretariat support End of day 1.
Regulatory Institutions in Turkey. Regulatory Institutions Central Bank of Turkey Banking Supervision and Regulatory Institutions Capital Markets Board.
IAEA International Atomic Energy Agency School of Drafting Regulations – November 2014 Government and Regulatory Body Functions and Responsibilities IAEA.
The New Approach and GPSD. Council Resolution of 7 May 1985 on a new approach to technical harmonization and standards [OJ C136 of June 1985] New Approach.
16-17 November 2005 COSCAP – NA Project Steering Group Guangzhou, China 1 Co-operating with the European Aviation safety Agency.
Profiling exercise of internally displaced persons’ situations in_______ General presentation of the project Official project launch event Date.
Database Administration
Interoperability event Sept 2015 Group Name: WG TST Source: Sookhyun Jeon, TTA, Laurent Velez, ETSI, Meeting Date:
Technical questions on oneM2M certification Group Name: TST Source: JaeSeung Song KETI, TST WG Chair Meeting Date: Agenda.
TST WG Progress Report at TP 19 Group Name: TP Source: TST WG Chair, JaeSeung Song (KETI) Meeting Date: to Agenda Item: TP19, Item.
HIT Policy Committee NHIN Workgroup HIE Trust Framework: HIE Trust Framework: Essential Components for Trust April 21, 2010 David Lansky, Chair Farzad.
HIT Policy Committee Meeting Nationwide Health Information Network Governance June 25, 2010 Mary Jo Deering, PhD ONC, Office of Policy and Planning NHIN.
Planning for the test event Group Name: TST Source: Jiaxin Yin, Huawei Technologies Co., Ltd., Meeting Date: Agenda Item:
TST WG Progress Report at TP #20 Group Name: TP Source: TST WG Chair, JaeSeung Song (KETI) Meeting Date: to Agenda Item: TP20, Item.
EU Politics CHAPTER 13: Other Institutions. Outline 1) European Economic and Social Committee (EESC) 2) Committee of the Regions (CoR) 3) European Agencies.
Test environments serving device certification Group Name: WG6 (TST) Source: Denis Chabot, Sierra Wireless,
TST WG Progress Report at TP 18 Group Name: TP Source: TST WG Chair, JaeSeung Song (KETI) Meeting Date: to Agenda Item: TP18, Item.
Feedbacks on oneM2M certification Group Name: TP Source: JaeSeung Song KETI, TST WG Chair Meeting Date: Agenda Item:
Voluntary Standards and Government: Working Together A Positive Collaboration Benefits Both the Public and Private Sectors Presentation by Mary C. McKiel,
M O N T E N E G R O Negotiating Team for the Accession of Montenegro to the European Union Working Group for Chapter 28 – Consumer and Health Protection.
Medical Device Regulations in Canada; Key Challenges and International Initiatives.
Discussion on Certification Group Name: TST WG Source: JaeSeung Song, WG6 Chair, Meeting Date: TST #21.
CLAUDIA PANAIT TAIEX Expert – European Commission Legal Adviser Ministry of Health, ROMANIA.
2 nd oneM2M Interoperability Event Prof. Song JaeSeung (KETI, TST WG Chair) TST Introduction-to-2 nd -interop-event.
Discussion for Testing related Activities Group Name: TP Source: JaeSeung Song, KETI, Meeting Date: Agenda.
ASSESSING POSSIBLE INCENTIVES TO ENCOURAGE THE PRIVATE SECTOR TO INVEST IN ENVIRONMENTALLY SOUND MANAGEMENT Dr. Leila Devia, BCRC Argentina Ross Bartley,
TST TTCN-3_development_plan TTCN-3 development plan Group Name: TST WG Source: Easy Global Market (EGM) Meeting Date:
Presentation Title Presenter Session Document Name/Version Submission/Revision date: XX April 2016.
Introduction of TTA Verified Program for oneM2M TP #23 Closing Session(20 th, May 2016) Source : Kanghae Lee,
Are You Ready? SSH Accreditation and Certification
Development of Sustainable Smart Cities based on IoT
Issues on TST #28 (Overview)
ISO/IEC
Global Solar Certification Network
GUIDELINES Evaluation of National Rural Networks
Data Accessibility, Confidentiality and Copyright United Nations Statistics Division Demographic Statistics Section.
Area Retail Manager Manager Purpose
Launch of oneM2M Certification Program
New challenges for archives in Iceland
Co-operating with the European Aviation safety Agency
Gunnar Vaht Head of the Estonian ENIC/NARI Baku, 2017
Построение культуры integrity в компании Aнар Каримов партнёр «ЭКВИТА»
Area Retail Manager Manager Purpose
Institutional Framework, Resources and Management
General tripartite board composition and selection information
LIVING AND WORKING TOGETHER: INTEGRATING SYRIANS UNDER TEMPORARY PROTECTION (SuTPs) TO TURKISH ECONOMY European Union Regional Trust Fund (in Response.
Community Investment Grant
Development of Sustainable Smart Cities based on IoT
Presentation transcript:

Analysis of Available oneM2M Certification Models TST 15.3 Source: JaeSeung Song (WG6 Chair, Sookhyun Jeon (TTA, Meeting Date: TST Analysis_of_Available_oneM2M_Certification_Models

Certification Management Program Why does oneM2M need certification management program? – Certification management program provides the consistency in the behavior of compliant devices and services, – Thereby, it can provide an assurance of interoperability between various manufacturers’ devices and services – Certification is granted through a testing process compliant to oneM2M specification and requirements Goals of Certification Management Program – Improving interoperability – Shortening the product adoption process – Lowering adoption costs and time – Making product implementations easier to integrate – Providing Confidence & Assurance to Regulators, Manufacturers, Retailers & Consumers © 2014 oneM2M Partners 2

Certification Management Program Elements © 2014 oneM2M Partners 3 Certification Management Program is administrated by Certification Entity and comprises as follows: I. Certification Policy and Requirements II. Certification Process III. Role of Certification Body IV. Testing Methodology and Scope V. Test Tool and Test Case Management VI. Certification(Logo) Marketing and Enforcement VII. OneM2M Test Events VIII. Authorized Test Lab Requirements ** Certification Management Program does not include tasks for conducting test ** Testing can be performed by member using self-testing tool or by authorized 3 rd party test lab according to the testing scope and methodology ** Certification Entity can designate the 3 rd party test lab through considering market demand and regional allocation

Available Certification Management Program Options Option 1 – oneM2M takes in charge of certification through creating a legal framework for certification & labelling by one or more of our Partners Option 2 – Having an independent Certification Entity outside of oneM2M (e.g., GCF) Option3 – Self-certification with self-declaration © 2014 oneM2M Partners 4

Certification Management Program - Option 1 Manage certification process and income budget effectively Develop Test Specs. expeditiously and accurately by WG6 and Certification Entity Reflect certification and testing issues instantly for member requests Strengths Partner type 1 members don’t have enough experience and resources for certification management It takes longer time to set-up and launch the certification program Weakness Multiple Partner Type 1 members are collaborating to run oneM2M Certification Body Concatenate the best certification consulting agency that has full experiences to establish and manage Certification Entity Test WG should support and collaborate to develop test specs. and certification management program with recognized Certification Entity Strategy

Certification Management Program - Option 2 Enforce the brand power for oneM2M logo through 3 rd Organizations e.g. GCF Set-up and establish suitable certification program professionally Strengths No control for certification process. Possibly end-up with high-cost and duplicate certifications (e.g., certifications for common service layer and verticals) Some works such as test spec. development and testing event from Test WG could be conflict to independent certification entity Weakness Negotiate with 3rd certification entity for establishing certification ecosystem (invest certification profits to the ecosystem, etc.) Have authority for certification works such as making program management policy, developing test specifications, management of testing lab, testing tools and test events, etc. Strategy

Need to Cooperate oneM2M and Certification Body – Option 1: oneM2M has internal Certification Body – Option 2: oneM2M has an independent certification Body outside Strategy for Option 1 & 2 7 TST Certification Entity TP SC Mutual Cooperation TST Certification Entity TP SC Approval for certification works ** **certification works: making program management policy, developing test specifications and management of testing lab, testing tools and test events controls, authorize exchanges test specifications and processes

Certification Management Program - Option 3 (Self-certification with self-declaration) No Certification fee, minimize cost and time Easily adopt oneM2M technology to products without barrier Strengths Limited scope of guarantees and assurance for interoperability between various manufacturers Weakness Provide self testing tool to check minimum testing requirement Strategy