CSEP Transportation Charges 11 th August 2014. Background Action NEX0604 from 18 th June PN UNC requested Xoserve to provide a presentation on how Supply.

Slides:



Advertisements
Similar presentations
PN UNC Workgroup (Settlement topic) Allocations Overview 4 th December 2012.
Advertisements

Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Application of User Pays Principles to Existing Service Lines 22nd November 2006.
SPA Enquiry Process - Additional Requirements for AMR sites ICoSS Presentation.
1 Project Nexus Market Differentiation Topic Workgroup 14 th & 15 th July 2009.
Project Nexus Workgroup 9 th September Background During detailed design a number of areas have been identified that require clarification with.
Project Nexus Workgroup Unique Sites 4 th November 2014.
UNC Urgent Modification Proposal 0275 Supplemental Analysis and Timeline.
Credit Scenarios – Modification 0335 Joanna Ferguson.
DN Update 24 th May 2007 LDZ System Charges Capacity/Commodity Split and Interruptible Discounts.
UNC G7.3.7 Invoicing Read Estimation Proposal Requirement for Read Estimation & Proposed Methodology Dean Johnson Distribution Workstream – 25 th August.
Project Nexus Workgroup Read Validation following Transfer of Ownership 13 th October
Nexus Workgroup CSEP Transition Topic June
IGT Single Service Provision Requirements Update – 27 th March 2013.
Performance Assurance 21 st May Value Chain. Value Chain Xoserve would like to propose an approach to further aid the development of the Performance Assurance.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
LDZ System Charges – Structure Methodology 26 April 2010.
DNPC06 LDZ NEC Charges Denis Aitchison 25 th January 2010.
11 User Pays User Committee 12th November Agenda  Minutes & Actions from previous meeting  Agency Charging Statement Update  Change Management.
Meter Read Validation 11 th August Background The meter read validation principles were developed under ‘The Settlement’ BRD and formed part of.
Presented by : Steven J Edwards, Head of Income and Pricing, Wales & West Utilities GDN Allowed and collected revenue awareness presentation for Shippers.
PN UNC Workgroup iGT Services 7 th February 2012.
Mod 270 Potential Options Rob Hill 15/02/2009. Six potential options following discussion at last months Development Workgroup OptionNameDescription 1Elective.
Distribution Network Interruption - Initialisation 28 September 2010.
Allocation of Unidentified Gas Statement 2013/14 6 th February 2012.
Billing Operations Forum 24 July 2007 RbD Overview Billing Operations Forum 24 July 2007 RbD Overview Fiona Cottam.
1 v1 iGT CSEP Billing Solution ScottishPower Proposals April 08.
Gas Distribution Transportation Charging What are the Risks to Pricing predictability? Stephen Marland Pricing Manager
The calculation of the NTS Optional Commodity tariff (NTS Shorthaul) in the Enduring Exit Period Richard Hounslea/Debra Hawkin National Grid NTS, Gas Charging.
1 Review Group 264 Rules & Options Analysis for BSSOQ Methodology Changes Post MOD th September 2009.
1 Mod Review Group 126 Apr 2007 slides 126 Review Group – Restriction of Invoice Billing Period  These slides describe the business rules for the treatment.
PN UNC 4 th September 2012 Reconciliation Issues (Action: NEX06/02)
ALLOCATION OF RbD ACROSS RELEVANT PERIOD DNOs’ comments on previous Workstream discussion ALLOCATION OF RbD ACROSS RELEVANT PERIOD DNOs’ comments on previous.
Development Workgroup 0282 Action 018 – impact on RbD 13 September 2010.
Impacts of Mod 244 Steve Nunnington xoserve. Background  96.5% of transportation charges based on capacity.  These are dependent on historical throughput.
MOD0164 Bi-Directional Connection Point Overrun Charge Calculation Stuart Waudby (Centrica Storage Ltd.)
1 UNC Review Group 175 – Encouraging Participation in the Elective Daily Metered Regime 26 th June 2008.
UNC Modification Proposal 0380 Periodic Annual Quantity Calculation Calculation of Daily Supply Point Capacity Alan Raper – DNCMF 26 th September 2011.
UNC0376A - Increased Choice when applying for NTS Exit Capacity – User Pays initial thoughts Review Group August 2010 Transmission Workstream 01.
PN UNC Workgroup Invoicing 10 th January Objectives of the Workgroups To determine business principles for future Invoicing processes –Consider/review.
DN Interruption Reform Transmission Workstream Mark Freeman 5 th April 2007.
EU Phase 2 Delivery & UK Link Programme; Impacts on Gemini Process European Workgroup 1 st May 2014.
IGT and Shipper Workgroup meeting 28 th February 2011.
User Pays User Committee 12th November 2013
Background Current balance of LDZ System and Customer charges
FGO: ASA Service Line Review
Review of Demand Estimation Times for Modification Proposal 461
Modifications iGT 039 and GT 0440 re iGT Agency Services background
Modification th July 2008.
Reduction of Exit Capacity at DM Supply Points
DNPC06 From 1 October 2012 the DNs will pay the NTS Exit Capacity charges to the NTS and recover the cost from shippers DNPC06 put forward for consultation.
CSEPs Reconciliation Proposals
Project Nexus Workgroup
MOD 258A Demand Estimation Sample Point – Shipper Report.
UNC Modification Proposal 0362
June 2019 Release Scope DSC Change Management Committee
DNPC07 Proposal DNPC07 proposed that Capacity/Commodity split of the LDZ System Charges should be changed to 100/0 The percentage of the Firm Capacity.
PN UNC AMR Topic Workgroup
Connected System Exit Points - Update
Project Nexus Workgroup
Impact of SOQ Reduction
PN UNC AMR Topic Workgroup
CSEPs SPA Rejections November 2007 update
AQ BTU Form – Process & Timeline 29th September 2009
Overview of RbD Risk Modelling 31 March 2008
DN Interruption Phase II
Invoicing Proposals 20th May 2013
CSEPs SPA Rejections December 2007 update
Modification 440 Project Nexus iGT Single Service Provision
CSEPs SPA Rejections January – August 2007
Presentation transcript:

CSEP Transportation Charges 11 th August 2014

Background Action NEX0604 from 18 th June PN UNC requested Xoserve to provide a presentation on how Supply Point aggregation is applied for a CSEP The following slides provides an overview of the CSEP hierarchy and how DN LDZ transportation charges are calculated –Does not include iGT transportation charges

CSEP Relationship Diagram Max AQ & SOQ for the CSEP

CSEP Data

CSEP DN Transportation Charges LDZ System charges for transportation to Connected System Exit Points (CSEPs) are identical to those for transportation to direct loads In the calculation of LDZ charges payable, the unit rate commodity and capacity charges are based on the supply point capacity equal to the CSEP peak day load for the completed development irrespective of the actual stage of development. The SOQ used is therefore the estimated SOQ for the completed development Therefore, for any CSEP each Shipper will pay identical LDZ unit rates regardless of the proportion of gas shipped or capacity booked Rates are applied to deemed/measured energy and Nominated/derived SOQ

CSEP Transportation Charges DN LDZ Transportation charges for CSEP’s; –Capacity charge: Supply Meter Point SOQ x by the rate using the MAX SOQ for the CSEP –NDM LDZ Commodity charge: Deemed energy x by the rate using the MAX SOQ for the CSEP –DM Commodity charge: Measured energy (based on daily reads) x by the rate using the MAX CSEP SOQ