Doc.: IEEE 802.11-15/0173r0 Submission January 2015 Edward Au (Marvell Semiconductor)Slide 1 NG60 SG January 2015 Closing Report Date: 2015-01-15 Authors:

Slides:



Advertisements
Similar presentations
Doc.: IEEE /1510r0 Submission November 2014 Edward Au (Marvell Semiconductor)Slide 1 Summary of PAR and CSD Discussion Date: Authors:
Advertisements

Doc.: IEEE /1091r4 Submission May 2015 TGaj Editor Report for CC20 Jiamin Chen, HuaweiSlide 1 Date: Author:
Doc.: IEEE /0699r0 Submission May 2015 Jonathan Segev (Intel Corporation)Slide 1 NGP SG May 2015 Closing Report Date: Authors:
Doc.: IEEE /0217r2 Submission March 2015 Edward Au (Marvell Semiconductor)Slide 1 NG60 SG March 2015 Agenda Date: Authors:
Doc.: IEEE /0217r0 Submission March 2015 Edward Au (Marvell Semiconductor)Slide 1 NG60 SG March 2015 Agenda Date: Authors:
Doc.: IEEE /01552r1 Submission January 2015 Edward Au (Marvell Semiconductor)Slide 1 NG60 SG January 2015 Agenda Date: Authors:
Doc.: IEEE /01552r0 Submission January 2015 Edward Au (Marvell Semiconductor)Slide 1 NG60 SG January 2015 Agenda Date: Authors:
Doc.: IEEE /1514r0 Submission November 2014 Edward Au (Marvell Semiconductor)Slide 1 NG60 SG November 2014 Closing Report Date: Authors:
Doc.: IEEE /1301r0 Submission September 2014 Edward Au (Marvell Semiconductor)Slide 1 NG60 SG September 2014 Closing Report Date: Authors:
Doc.: IEEE /0677r0 Submission May 2015 Slide 1 IEEE ah Closing Report for May 2015 Date: Authors: Yongho Seok (NEWRACOM)
Doc.: IEEE /0015r0 Submission January January 2015 WG Motions Date: Authors: Dorothy Stanley, Aruba Networks.
Doc.: IEEE /01313r5 Submission November 2014 Edward Au (Marvell Semiconductor)Slide 1 NG60 SG November 2014 Agenda Date: Authors:
Doc.: IEEE /0217r9 Submission March 2015 Edward Au (Marvell Semiconductor)Slide 1 NG60 SG March 2015 Agenda Date: Authors:
Doc.: IEEE /01552r5 Submission January 2015 Edward Au (Marvell Semiconductor)Slide 1 NG60 SG January 2015 Agenda Date: Authors:
Doc.: IEEE /0696r0 Submission May 2014 Slide 1 IEEE ah Closing Report for May 2014 Date: Authors: Yongho Seok (LG Electronics)
Doc.: IEEE /0053r0 Submission aa – Robust Audio Video Transport Streaming Los Angeles, California Opening Report Date: Authors:
Doc.: IEEE /0887r0 Submission July 2012 Eldad Perahia, Xiaoming PengSlide 1 Date: Authors: China MM-Wave (CMMW) Study Group July 2012.
Doc.: IEEE /0547r0 Submission May 2009 Menzo Wentink, QualcommSlide 1 IEEE TGz Montreal Agenda Date: May 10, 2009 Authors:
Doc.: IEEE /0333r1 Submission May 2014 TGaj Editor Report Jiamin Chen, HuaweiSlide 1 Date: Author:
Doc.: IEEE /1583r1 Submission November 2011 Osama Aboul-Magd (Huawei Technologies)Slide 1 TGac November 2011 Closing Report Date: Authors:
Doc.: IEEE /0217r9 Submission March 2015 Edward Au (Marvell Semiconductor)Slide 1 NG60 SG March 2015 Agenda Date: Authors:
IEEE aj January 2016 Closing Report
IEEE TGa Project Timeline
Light Communications Topic Interest Group March 2017 Closing Report
Light Communications Topic Interest Group March 2017 Closing Report
NG60 SG March 2015 Agenda Date: Authors: March 2015
SG4a Project Timeline January 2003 doc.: IEEE /056r0
NGV SG Closing Report – Hawaii, USA
PAD SG Closing Report Date: Authors: November 2012
March 2016 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG4s Closing Report for March 2016] Date.
Light Communications Task Group BB Progress Document
May 2013 doc.: IEEE /xxxxr0 January 2015 Motion #8: PAR
TGae Closing Report – May 2010
<month year> doc.: IEEE < e> <January 2018>
Light Communications Study Group March 2018 Closing Report
Mar Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [SG4w March 2018 Plenary Closing Report] Date.
SG4a Project Timeline January 2003 doc.: IEEE /056r0
TGaf Indian Wells Closing Report
SG4a Project Timeline January 2003 doc.: IEEE /056r0
SG4a Project Timeline Interest Group ‘a’ Activities Aug 03
Wake-up Radio (WUR) SG November 2016 Closing Report
<month year> doc.: IEEE < e> <January 2018>
Proposed work items and timeline for the LC SG
Light Communications Study Group teleconference February 2018 Agenda
PICS PC items Date: Author: April 2019 May 2015
VHT SG November 2008 Closing Report
IEEE SGa Project Timeline
Light Communications Study Group May 2018 Closing Report
TGad March 2011 Closing Report
Light Communications Topic Interest Group January 2017 Closing Report
MArch 2019 doc.: IEEE /r0 March 2019
TGba January 2018 Closing Report
Timeline for the Light Communications TG
Light Communications Topic Interest Group May 2017 Closing Report
2019 March TGba Closing Report
TGba November 2017 Closing Report
TGba September 2017 Closing Report
Task Group AY September 2017 Closing Report
May 2015 doc.: IEEE /0496r1 March 2019 IEEE TG13 Multi-Gbit/s Optical Wireless Communication Agenda for the Atlanta Session Date:
Task Group AY May 2016 Closing Report
TGax September 2017 Closing Report
Task Group BA - January 2017 Since the last (November) F2F meeting
NG60 SG November 2014 Agenda Date: Authors: November 2014
IEEE aj March Closing Report
BCS SG Closing Report Date: Authors: September 2018
IEEE aj May Closing Report
Closing Report Date: Authors: January 2010 January 2010
TGbb September 2018 Closing Report
TGaq Closing Report Date: Authors: March 2015 March 2015
IEEE TGaf Beijing Closing Report
Presentation transcript:

doc.: IEEE /0173r0 Submission January 2015 Edward Au (Marvell Semiconductor)Slide 1 NG60 SG January 2015 Closing Report Date: Authors:

doc.: IEEE /0173r0 SubmissionSlide 2 Abstract This document is the closing report for NG60 SG for the January 2015 session. Edward Au (Marvell Semiconductor) January 2015

doc.: IEEE /0173r0 SubmissionSlide 3Edward Au (Marvell Semiconductor) Work Completed 6 submissions were covered during the meeting covering areas related to: –Technical –Draft PAR and CSD proposals Reviewed the Study Group timeline. Approved motions on PAR and CSD. January 2015

doc.: IEEE /0173r0 SubmissionSlide 4 March 2015 Goals Edward Au (Marvell Semiconductor) Resolve comments expected from IEEE 802 EC members and other IEEE 802 Working Groups. Continue with presentations that are relevant to the Study Group topics. Study Group Extension. January 2015

doc.: IEEE /0173r0 SubmissionSlide 5 Conference Call Times March 3, 2015 (Tuesday), 10am ET – 11am ET Edward Au (Marvell Semiconductor) January 2015