PSA Wells, Allocation Wells and Stacked Laterals Permitting and Completion Lorenzo Garza & Joe Stasulli.

Slides:



Advertisements
Similar presentations
Field Orders on Construction Contracts Guidance Document CLC-8 May 13, 2013.
Advertisements

Statewide Rule 10 : Downhole Commingling
How to Submit Oil Online Completions – (Form W-2)
RAILROAD COMMISSION OF TEXAS WEBSITE QUERIES FOR PRORATION HOW TO STAY IN COMPLIANCE Pamela Thompson, Well Compliance.
Surface Cleanup Requirements (Form W-3C)
Drilling Permits Statewide Rule 37 & 38 Exceptions Lorenzo Garza
U.S. Department of Veterans Affairs Veterans Health Administration Supportive Services for Veteran Families (SSVF) Program SSVF Grantee Uniform Monitoring.
Top Problems That Can Delay A Completion Packets Final Approval 1.
NARUC/NIGERIA REGULATORY PARTNERSHIP Peer Review Presented by Elijah Abinah Assistant Director Public Utilities Division Arizona Corporation Commission.
By Law Offices of Wayne D. Gerhold One Gateway Center, 18 th Floor Pittsburgh, PA (412)
To Begin The Discussion Remember The Rule Of Capture.
EVOLUTION OF SPACING AND POOLING IN COLORADO Denver Association of Division Order Analysts July 21, 2014 Denver, Colorado Steve Sullivan Welborn Sullivan.
FORM 1073 – TRANSFER OF OPERATOR. This presentation will assist you in the completion of the Form The transfer of operator. Date of Last Revision:
FORM 1000 – APPLICATION TO DRILL, RECOMPLETE OR REENTER.
UIC Completion Reporting Guidance
Plugging Extension Applications (Form W-3X)
Railroad Commission of Texas Skim Oil/Condensate Report P-18 Kierra Pimpton.
Partnership Agreements Delegation of SBA’s Contract Execution Authority to other Federal Government Agencies.
Page 1 of 8 To the Assignments - Overview Online Training Course The Assignments program is an online service that will enable clients to submit the assignment.
RAILROAD COMMISSION OF TEXAS BACK TO THE BASICS : WELL COMPLIANCE FORMS AND PROCEDURES 1.
U.S. Small Business Administration
RAILROAD COMMISSION OF TEXAS Horizontal Drilling Permit Applications Lorenzo Garza.
RAILROAD COMMISSION OF TEXAS Regulatory Conference San Antonio 2014 Drilling Permits and Online Filings Advanced Valerie Atkins-Team Leader.
PLYMOUTH STATE UNIVERSITY Purchasing Card Program Department Card Training Revised February 2012.
Financial Resource Management Recommended Best Practices Training for Volunteers and Support Groups.
© Copyright 2013 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without notice. Job Request System v3.0.
RAILROAD COMMISSION OF TEXAS Regulatory Conference San Antonio 2014 Introduction to Drilling Permits and Online Filing Valerie Atkins-Team Leader.
RAILROAD COMMISSION OF TEXAS WELL COMPLIANCE FORMS AND PROCEDURES Austin Regulatory Conference September
Railroad Commission of Texas Surface Commingling P-17 Applications Darlene Williams 1.
Welcome Document Imaging System Training Dial in number: (559) Participant Access Code: #
1. Proposal deadline 2. Timeline  A grant opportunity announcement will include a sponsor deadline for receipt of the proposal.  The instructions will.
UFT Rule ProposalS Adopting statewide Horizontal rules in texas
RAILROAD COMMISSION OF TEXAS Completion Guidance Oil and Gas Regulatory Conference September 25, 2013 Speaker - Jim Moore.
Class Description In the class today we will be discussing how to properly file the P-17 report. The P-17 form is used by an operator when they are surface.
Oil and Gas Well Completions Advanced Regulatory Seminar – Midland 2013 Pamela Thompson Katie McNally.
Class Description In the class today we will be discussing how to properly file the PR report. The PR report is a monthly report that is filed by the.
RAILROAD COMMISSION OF TEXAS Regulatory Conference San Antonio 2014 Drilling Permits and Online Filings Advanced Valerie Atkins-Team Leader.
Form H-10 Annual Injection/Disposal Well Monitoring Report
THE CHILD AND ADULT CARE FOOD PROGRAM playing a vital and integral role in improving the overall quality of care and daily nutritional health of participants.
Student Accounting Department Card Training Revised February 2012.
THE CHILD AND ADULT CARE FOOD PROGRAM playing a vital and integral role in improving the overall quality of care and daily nutritional health of participants.
Environmental Justice & Air Permitting Training - August 15, 2012 EPA Region IV – Atlanta, Georgia.
Contract Training Class I
Dealing with Missing Persons and Holdouts: Using Rule 37 and MIPA for Urban Gas Development Presented By: Eric C. Camp W HITAKER, C HALK, S WINDLE & S.
RAILROAD COMMISSION OF TEXAS Lorenzo Garza Drilling Permits and Online Filing – Advanced Topics to be discussed: Stacked Laterals, Allocation and PSA wells,
RAILROAD COMMISSION OF TEXAS How To Submit Gas Online Completions Pamela Thompson, Well Compliance.
Class Description In the class today we will be discussing how to properly file the PR report. The PR report is a monthly report that is filed by the operator.
Location Exception Increased Density Eric R. King Week Five September 30, 2010.
Class Description In the class today we will be discussing how to properly file the P-17 report. The P-17 form is used by an operator when they are surface.
Reimbursement Process Michigan State Police Emergency Management and Homeland Security Division June Martin, Analyst Carla Richardson, Analyst.
Drilling Permits Statewide Rule 37 & 38 Exceptions Lorenzo Garza
Mrs. Sills, Placement Specialist Holland Public Schools Please sign in and write down your address (clearly) so that I can contact you easier (won’t.
RAILROAD COMMISSION OF TEXAS Regulatory Conference San Antonio 2014 Introduction to Drilling Permits and Online Filing Valerie Atkins-Team Leader.
February 12, 2013 Alachua County Board of County Commissioners.
SPACING Vertical Horizontal Eric R. King Week Three September 8, 2011.
RAILROAD COMMISSION OF TEXAS How to Submit Oil Online Completions – Online (Form W-2) Austin Regulatory Conference September 2013 Katie McNally 1.
1 Summary of TAC Procedures – RMS, ROS, WMS May 9, 2005.
1 Summary of TAC Procedures for COPS & PRS May 17, 2005.
1 Summary of TAC Procedures May 5, Revision of TAC Procedures Project began in October 2004 to incorporate the Commercial Operations Subcommittee.
Woodford Horizontal Wells June 30, 2005
RAILROAD COMMISSION OF TEXAS How To Submit Gas Online Completions Austin Regulatory Conference September
Class Synopsis This presentation will summarize the oil and gas well supplements, proration schedule, and online research queries associated with the Well.
Directional Surveys and Associated Issues
PSA WELLS, ALLOCATION WELLS,
Content of Tender Dossier - Instructions to Tenderers - Tenders
Financial Training Module # 2 Purchase Procedures
Drilling Permits Statewide Rule
AMERICAN ASSOCIATION OF PETROLEUM LANDMEN
Financial Training Module # 2 Purchase Procedures
Using the AIM Alternative Testing Module (for Students)
Presentation transcript:

PSA Wells, Allocation Wells and Stacked Laterals Permitting and Completion Lorenzo Garza & Joe Stasulli

How to qualify for Stacked Lateral status Presentation Overview How to qualify for Stacked Lateral status Requirements for PSA and Allocation wells Filing completions for these types of applications

Drilling Permits and Well Compliance– Advanced

Drilling Permits and Well Compliance– Advanced Stacked Laterals- how to qualify 2 or more horizontal drainhole wells within lease/pooled unit in the correlative interval. Horizontal drainholes are drilled from different surface locations. The first well drilled establishes the parameters that the subsequent wells will be tested against. Make sure your field rules allow for Stacked Laterals and if so what well spacing is required.

Drilling Permits and Well Compliance– Advanced Stacked Laterals- how to qualify cont. Each surface location must be permitted separately and assigned its own API number. Plat must clearly show all wellbores attempting to qualify for Stacked Lateral status. To be considered a “regular location” each well must comply to any minimum lease or between well spacing rules

Drilling Permits and Well Compliance– Advanced Stacked Laterals why all the fuss? For each well that qualifies as a Stacked Lateral well your overall well count will not increase when the RRC tests your lease for density exceptions. Remember that the wells must be completed in the same regulatory field to qualify as a stacked lateral.

Drilling Permits and Well Compliance– Advanced Stacked Laterals potential problem? If your well, when completed, does not remain within the established parameters of the “record well” then you will be required to amend the permit to reflect its new status and count this well against your total well count. If you exceed density then an exception to SWR 38 will be needed.

Drilling Permits and Well Compliance– Advanced

Drilling Permits and Well Compliance– Advanced

Drilling Permits and Well Compliance– Advanced PRODUCTION SHARING AGREEMENTS Supporting Documentation: Authorization letter to include % of participation PSA-12 form showing acreage to be assigned to proposed well Plat showing the external boundary of all tracts contributing acreage to the proposed well Well allocation worksheet

Drilling Permits and Well Compliance– Advanced PRODUCTION SHARING AGREEMENTS Supporting Documentation: Authorization letter Contractual right to develop all proposed tracts To be approved administratively minimum of 65% of mineral and working interest owners must be signed to agreement If less than 65% sign-up then request to set up application for hearing

PSA/ALLOCATION AUTHORITY LETTER

Drilling Permits and Well Compliance– Advanced PRODUCTION SHARING AGREEMENTS Supporting Documentation: PSA-12 and Plat PSA-12 form filled out showing all tracts and acreage involved Plat that shows the entire boundary of all contributing tracts All supporting lease/unit line calls should be to exterior boundary of the contributing tracts Any un-leased tracts within contributing tracts should be identified

Drilling Permits and Online Filing - Advanced

Drilling Permits and Well Compliance– Advanced PRODUCTION SHARING AGREEMENTS Supporting Documentation: Acreage allocation work sheet Breakdown of activity for each contributing lease/pooled unit If any contributing lease/pooled unit is over assigned then a statement as to how the deficiency will be resolved If SWR 38 density exception is required then application must follow procedures set forth in the rule

W-1 ACREAGE ALLOCATION WORK SHEET

Drilling Permits and Well Compliance– Advanced

Drilling Permits and Well Compliance– Advanced

Drilling Permits and Well Compliance– Advanced What is the difference between a “PSA” well and an “Allocation” well? On tracts that you have a valid lease in place an “Allocation” well permit will allow you to get a drilling permit application without the qualifier that you have to provide for a “PSA” well that 65% of both mineral and working interest owners have signed an agreement as to how production proceeds will be divided. 2. What it doesn’t allow you to do is incorporate tracts into your “Allocation” unit that the wellbore does not traverse.

Drilling Permits and Well Compliance– Advanced PSA or ALLOCATION WELLS SWR Exceptions: Lease line Allocation well application will always require an exception PSA application will require an exception if there is less than 100% participation Between Well Normal notification procedures will be followed Density Exception Unless specified in the field rules normal notification and data requirements will be followed

Drilling Permits and Well Compliance– Advanced PSA or ALLOCATION WELLS -Example TRACT A TRACT B

Drilling Permits and Well Compliance– Advanced PSA or ALLOCATION WELLS -Example

Drilling Permits and Well Compliance– Advanced PSA or ALLOCATION WELLS -Example

Drilling Permits and Well Compliance– Advanced PSA or ALLOCATION WELLS -Example

Drilling Permits and Well Compliance– Advanced PSA or ALLOCATION WELLS -Example

Drilling Permits and Well Compliance– Advanced PSA or ALLOCATION WELLS -Example

Drilling Permits and Well Compliance– Advanced PSA or ALLOCATION WELLS -Example

Drilling Permits and Well Compliance– Advanced Would you like to make your life a little easier and help decrease the processing time of both your drilling permits and completions?

Drilling Permits and Well Compliance– Advanced

For further questions concerning Drilling Permits please contact: Contact Information For further questions concerning Drilling Permits please contact: Lorenzo Garza Phone: 512-463-2184 Email: Lorenzo.Garza@rrc.state.tx.us Valerie Atkins Phone: 512-463-6979 Email: Valerie.Atkins@rrc.state.tx.us

Drilling Permits and Well Compliance– Advanced Now Presenting Mr. Joe Stasulli

Railroad Commission of Texas Operator Procedures for PSA and Allocation Wells

Drilling Permits and Well Compliance– Advanced Completion Report (G1/W2) must include: (SA) does NOT need to be included in the lease name. Sharing Agreement information must be referenced in the G1/W2 remarks. Detailed Sharing Agreement information must be attached to the completion packet.

Drilling Permits and Well Compliance– Advanced

Drilling Permits and Well Compliance– Advanced

Drilling Permits and Well Compliance– Advanced

Drilling Permits and Well Compliance– Advanced

Railroad Commission of Texas Operator Procedures for Stacked Laterals

Drilling Permits and Well Compliance– Advanced The first well of a stacked lateral is set up and processed in the same manner as any regular producing well. SL is NOT required to be part of the lease name. All the standard information should be filed for this well, drilling permit, completion, and associated forms.

Drilling Permits and Well Compliance– Advanced

Drilling Permits and Well Compliance– Advanced Any additional lateral wells (2nd, 3rd, 4th) must have an approved drilling permit and completions filed. The letters SL (Stacked Lateral) should be included in the well number if feasible. The drilling permit (W-1) and completion (G-1/W-2) remarks should reference that this is a stacked lateral and report all Railroad Commission identification numbers associated with all wells that are part of the stacked lateral. Use the drilling permit numbers if an RRC ID has not been assigned.

Drilling Permits and Well Compliance– Advanced

Drilling Permits and Well Compliance– Advanced

Drilling Permits and Well Compliance– Advanced