1 NORTHWEST ENERGY EFFICIENCY ALLIANCE NEEA Long-Term Monitoring and Tracking Distribution Efficiency (DE) Study RTF – January 21, 2015 Christopher Frye.

Slides:



Advertisements
Similar presentations
Mobius Risk Group Three Riverway Suite 1700 Houston, TX MOBIUS1 Houston Los Angeles Phoenix Las Vegas IPAA Private Capital Conference January.
Advertisements

Rebuild Massachusetts and PHEEP Energy Information Services Project Presentation to DCAM, EOEA, HUD January 4, 2006.
Introduction Build and impact metric data provided by the SGIG recipients convey the type and extent of technology deployment, as well as its effect on.
Test Automation Success: Choosing the Right People & Process
Regional Technical Forum Funding Discussion February 14, 2014 RTF PAC Presentation.
DISTRIBUTION EFFICIENCY UPDATE 1. Distribution Efficiency – Quick Review Tier 1 study (19 circuits) completed in 2011 – Four circuits identified for pilot.
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Energy Efficiency at BPA Northwest Clean & Affordable Energy Conference Josh Warner May 31, 2013.
Workshop for Proposed EPIC Triennial Plans Investor Owned Utility Programs July 31, 2014.
1 Measuring What Matters – Looking ahead, what data must we have to succeed? NEET Workgroup #1 Report Co-Chairs: Massoud Jourabch and Mary Smith Executive.
Chapter 6: Database Evolution Title: AutoAdmin “What-if” Index Analysis Utility Authors: Surajit Chaudhuri, Vivek Narasayya ACM SIGMOD 1998.
J.B. Speed School of Engineering University of Louisville KEEPS Energy Management Toolkit Step 4: Create an Action Plan Toolkit 4: Create an Energy Management.
Distribution Measures: Voltage Reduction and Optimization Josh Rushton CVR/VO Subcommittee May 8, 2015.
Importance of Health Information Systems Information explosion during 1990s  It is estimated that in the next 50 years, the amount of knowledge currently.
1 Proposed IOU Statewide Implementation Plan of Continuous Energy Improvement (CEI) June 18, 2009 Angie Ong-Carrillo.
Measuring What Matters November 7 th Agenda Review and update of tasks and timeline Review and update of tasks and timeline Role of RTF Role of.
EvergreenEcon.com Heat Pump Water Heater Model Validation, Market Progress Assessment, and Process Evaluation RTF HPWH Sub-Committee Meeting October 15,
PTCS Service Provider Review 0 Background RTF assumed responsibility for maintaining PTCS specifications in March 2003  Developed PTCS Service Provider.
RTF Small / Rural Subcommittee Quarterly Meeting Wednesday, February 4, :00 am – 10:30 am 1.
1 SIMPLIFIED VOLTAGE OPTIMIZATION M&V PROTOCOLS Regional Technical Forum August 4, 2009.
Demand Response Research and Capabilities at LBNL Chuck Goldman Lawrence Berkeley National Laboratory Midwest Demand Response Initiative.
Industrial Engineering Roles In Industry
Copyright © 2007 Pearson Education Canada 3-1 Marketing Research Marketing research serves many roles. It can: 1.Link companies with customers via information.
1 NORTHWEST ENERGY EFFICIENCY ALLIANCE Northwest Ductless Heat Pump Pilot Project Impact & Process Evaluation: Billing Analysis Ecotope, Inc. February.
Proprietary CVR as an Energy Efficiency Resource Prepared for: National Summit on Integrating Energy Efficiency and Smart Grid Prepared by: Applied Energy.
Guide for Conducting Energy Efficiency Potential Studies A Resource of the National Action Plan for Energy Efficiency Presented by Jeff Loiter, Optimal.
UNDP Handbook for conducting technology needs assessments and Preliminary analysis of countries’ TNAs UNFCCC Seminar on the development and transfer on.
BPA M&V Protocols Overview of BPA M&V Protocols and Relationship to RTF Guidelines for Savings and Standard Savings Estimation Protocols.
1 Distribution Efficiency Conservation Voltage Regulation (CVR) Jillianne Welker 4/21/2009.
Experience you can trust. Phase 1: Cataloguing Available End-Use and Efficiency Load Data September 15, 2009 End-Use Load Data Update Project.
Northwest Power and Conservation Council Action Plan Summary.
DRAFT Preliminary: BPA Summary of 6 th Plan Supply Curves May 15, 2009 Lauren Gage
+ Websites California Measurement Advisory Council Collaborative for Energy Efficiency 1 Kentucky PSC 9/11/09 Schiller Consulting, Inc.
Overview of Real Time Grid Reliability Management Carl Imhoff Pacific Northwest National Laboratory January 27-29, 2004 Washington, D.C. Transmission Reliability.
Regional Technical Forum Automated Conservation Voltage Reduction Protocol.
Emerging Technologies Presented by Mark Rehley, Emerging Technology Operations Manager Northwest Energy Efficiency Alliance.
Electric / Gas / Water MAESTRO Evaluation Showcase July 26-27, 2006 Project Manager: Pierre Landry, SCE Lead Consultants: Mike Rufo, Itron; Keith Rothenburg,
+ Transactive Energy – Business Models and Value Realization Session Transactive Energy Conference and Workshop 2013 Portland, Oregon May 23, 2013 Dian.
Northwest Power and Conservation Council 1 Distribution System Efficiency Potential & Conservation Voltage Reduction Power Committee April 2009.
June 17, 2009 Michael W. Howard, Ph.D. Sr. Vice President The Interoperable Smart Grid Evolving.
Revisions Proposed to the CIS Plan by the Global Office Misha V. Belkindas Budapest, July 3-4, 2013.
Presentation of Capabilities contact information Kevin Monte de Ramos (888)
United Nations Oslo City Group on Energy Statistics OG7, Helsinki, Finland October 2012 ESCM Chapter 8: Data Quality and Meta Data 1.
Electric / Gas / Water Summary of Final Evaluation Report Prepared by: Rafael Friedmann, PG&E Kris Bradley & Christie Torok, Quantum Consulting 2003 Statewide.
Canadian Marketing in Action, 6 th ed. Keith J. Tuckwell ©2004 Pearson Education Canada Inc. 3-1 Marketing Research Marketing research serves many roles.
Slide 1 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Presented by: Todd Amundson, BPA Jane Peters, research into action Ryan Fedie, BPA Update.
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Behavior Based Energy Efficiency (BBEE) October 2011.
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Developed by Navigant Research Team Final: 11/22/15 Agricultural Programs’ Logic Model.
Sixth Power Plan A Public Utility Point of View Bill Gaines, Director, Tacoma Public Utilities Craig Smith, Assistant General Manager, Snohomish PUD Northwest.
Process for Review of 6 th Plan Supply Curves June 19, 2009 Lauren Gage
Barriers to Implementing Energy Efficiency at Small and Rural Utilities Jennifer Anziano and Ryan Firestone August 19, 2015.
Performance Measurement: How Is Data Used in Quality Improvement ? Title I Mental Health Providers Quality Learning Network Quality Learning Network Johanna.
Northwest Wind Integration Forum Technical Work Group Meeting October 29, 2009.
G UIDELINE R EVISIONS – R ELEASE February 1, 2011 Regional Technical Forum Presented by: Michael Baker.
Draft Seventh Power Plan Meets RTF. Key Finding: Least Cost Resource Strategies Rely on Conservation and Demand Response to Meet Nearly All Forecast Growth.
1 1 DISTRIBUTION EFFICIENCY INITIATIVE (DEI) Benefits on Both Sides of the Meter RTF MEETING February 5, 2008.
Progress Toward the Sixth Plan’s Regional Conservation Goals 2014 Achievements November
Institutional Support Vladimir Koritarov Argonne National Laboratory April 2016.
1 NORTHWEST ENERGY EFFICIENCY ALLIANCE IFSA Monthly Update Meeting January 3, 2014 NEEA Market Research & Evaluation.
Frankfurt Intelligent Buildings and Big Data Greg Walker, Research Director CABA (Continental Automated Buildings.
1 NORTHWEST ENERGY EFFICIENCY ALLIANCE TV Initiative Transition to Long-Term Monitoring and Tracking Ty Stober April 8, 2014.
1 NORTHWEST ENERGY EFFICIENCY ALLIANCE 2015 Operations Plan Efficient Homes (NWESH)/Next Step Home.
Marjorie McRae, Ph.D., Principal Jane S. Peters, Ph.D., President Research Into Action, Inc.,
1 Michael Poplawski Pacific Northwest National Laboratory Internet of Things: Impacts of the Connected Home on EE, from a Lighting perspective April 22,
Presentation to the Energy Data Summit Part 1
New Homes/ Manufactured Homes Work Group

How can metros and municipalities operate to ensure that revenue generated from electricity sales is sustainable? by Dr Minnesh Bipath and Dr Willie de.
“RENEWABLE GENERATION PLANT COMMUNICATIONS”
How NEEA Estimates Energy Savings from Market Transformation
EM&V Planning and EM&V Issues
Presentation transcript:

1 NORTHWEST ENERGY EFFICIENCY ALLIANCE NEEA Long-Term Monitoring and Tracking Distribution Efficiency (DE) Study RTF – January 21, 2015 Christopher Frye – NEEA; (Jeff Harris - NEEA presenting)

2 Distribution Efficiency Study  Part of NEEA’s Long Term Monitoring and Tracking of previously funded MT Programs (Distribution Efficiency Initiative )  Market Characterization conducted in 2013; Avista DE Impact Evaluation 2014  Study conducted by Navigant Consulting, Inc.  Final Report, June 2014 here: and-tracking-distribution-efficiency.pdf?sfvrsn=5

3 Study Focused on Two Main Areas:  Current State of the Market:  Current rate of adoption  Awareness, understanding  Attitudes/barriers and drivers  Evaluation practices and progress  Future Plans  DE Evaluation Tool Assessment:  Utility CVR Program Review  Existing Tool Assessment

4 Case Study: Avista DE Impact Evaluation  Avista DE Program Characterization  Comparison of methods:  RTF CVR Protocol #1  WSU VO Validation Methodology  Navigant Regression

5 DE Market Characterization Sample DEI Sample Stratum DE Sample Completed

6 Market Characterization Findings: Active utilities participated in ESUE program or have regulatory/legislative (e.g. I-937) directives; Awareness/understanding of DE efforts is fairly high (all IOUs and Active Publics) but not always the case at smaller, more rural utilities; Respondents overwhelmingly believe that there are opportunities for efficiency improvements on their distribution systems, and that utilities should be investing in those opportunities, though many caution that the cost-effectiveness of such investment is not always clear. Two biggest barriers noted were capital availability and cost-effectiveness – others included low priority for DE, knowledge about opportunities, personnel constraints, system constraints, and regulatory constraints.

7 Market Characterization Findings: (cont’d)

8 DE Tools Evaluation Findings:  Many tools available; ranging from system simulation tools to statistical regression  Simulation tools/engineering assessment used primarily for project feasibility C/E evaluation  Some utility experience with RTF Protocol #1 but not many meeting exact requirements  Several cited use of RTF Simplified VO M&V Protocol to estimate/report savings.  AMI integration provides new, less expensive data collection / VO opportunities  CVR integration with Distr. Management Systems (DMS) now on the market.

9 DE Tools Evaluation: Fully Integrated Solution

10 Avista Impact Evaluation:  Smart Grid 2.0 project. Two locations:  Spokane: 14 Substations; 58 feeders  Pullman: 3 Substations; 13 feeders  AMI enabled Integrated volt/VAR controls  Implemented in 2013, commissioning completed Dec 2013  CVR data collection January–April 2014

11 Avista Impact Evaluation: Approach Savings Estimate (MWh) RTF Automated CVR Protocol #1 42,292 Navigant Regression Methodology 42,374