Prof. Awad Hanna Precedence Diagram Advantages of using Precedence Diagram: 1. No dummy activity are required. 2. A single number can be assigned to identify.

Slides:



Advertisements
Similar presentations
Work Breakdown Structure WBS
Advertisements

Spring 2008, King Saud University Arrow Diagramming Dr. Khalid Al-Gahtani 1 Network Schedule Predominant Network Scheduling Techniques: –Critical Path.
PROJECT BREAKDOWN Construction stages can be broken down into many operations that define the major elements to be performed The Single Relationship Finish.
Prof Awad S. Hanna Concrete Structures Concrete Structures.
Case Study By: The South Group
Project Scheduling Tools As part of CSA3040 © 2003, 2004 – Dr. Ernest Cachia.
CONSTRUCTION SCHEDULING. steps to effective time management Examine the Contract List Major Contractual Obligations Divide Project into Major Work Areas.
Scheduling. Putting the activities in chronological order –Chicken or the egg Allows the PM to determine the time required to complete a project.
BA 333 Operations Management
CEM 510 Construction Planning and Scheduling Detailed Course Outline Dr Soliman Almohawis.
Insert A tree starts with the dummy node D D 200 D 7 Insert D
Time Management Ahmed Awad, Ph.D., PMP. Time Management It includes the processes required to ensure timely completion of the project. b Activity Definition.
Scheduling Computations for Precedence Networks. Prof. Awad Hanna Tabular Format (Precedence Diagram)  Can be carried out on the tabular form without.
CEM 510 Construction Planning & Scheduling Dr Almohawis
Scheduling CTC-415. Activity Network Development Network Models Activity on Node Precedence Diagram Method Activity on Arrow Network Characteristics Discrete.
Prof. Awad Hanna Estimating Activity Duration Time Interval  Time Interval is selected according to the nature of the activity (seconds - minutes…) 
1 5. P RECEDENCE N ETWORK D EVELOPMENT AND A NALYSIS Objective: To understand the principles of developing precedence networks and using them as the basis.
Network Scheduling : Precedence Diagram Method
YUSUF OZ FATIH BOLUKBAS HUSEYIN ANIL KARABULUT NETWORK AND BLOCK DIAGRAMS.
BAR CHART Develop by Henry Gantt. Definitions Activity
Project Management Chapter Unique, one-time operations designed to accomplish a specific set of objectives in a limited time frame. Build A A.
Network Analysis Terminology
Flowcharting A Quality Improvement Tool. Quality = Inspection Statistical methods assisted in prevention of defects – The need for inspection declined.
8-1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall Project Management Chapter 8.
1. Production Activities Those that can be taken directly from plans and specifications 2. Procurement Activities procurement of material and equipment.
Estimating Activity Duration Time Interval –Time Interval is selected according to the nature of the activity (seconds - minutes …) –It is common practice.
Project Management Part 5 Project Scheduling. Topic Outline: Project Scheduling Identifying relationships among activities Project network diagrams Identifying.
Prof Awad S. Hanna Equipment Costs and Sources of E QUIPMENT C OST.
Adding SubtractingMultiplyingDividingMiscellaneous.
University of Sunderland CIFM02 Unit 2 COMM02 Activity Planning Unit 2.
1 EASTERN MEDITERRANEAN UNIVERSITY FACULTY OF ENGINEERING DEPARTMENT OF CIVIL ENGINEERING CIVL 493 Construction Management Assoc. Prof. Dr. Ibrahim YITMEN.
Prof Awad S. Hanna Project : Student Residence  New Project  Desired Capacity = 750,000 sq. ft  Expected Completion = End of 1998  Location = St. Louis,
Q1) A precedes C. B precedes D & E. C precedes F & G. D precedes G.
Prof. Awad Hanna Project Control  Major objectives for a good control plan. 1.Should accurately represent the work. 2.Permit deviations to be detected,
Prof. Awad Hanna ij Activity Event (a) Basic Activity Basic Logic Patterns for Arrow Diagrams.
1© Awad S. Hanna, PhD, P.E.1 Estimating and Scheduling CEE 492 Lecture 10 Basic Principles and Practices of Project Scheduling.
Project Management What are businesses trying to achieve by using Operations Management? (done on AS) EFFICIENCY.
Estimating and Scheduling CEE 492
Project Planning 1. Statement of work: written description of what is to be done 2. All activities are identified. Activity = job that requires labor,
Multiplication Timed Tests.
Activity Planning. Effort estimation – For whole project – For individual activity Detailed plan – Starting of each activity – End of each activity –
PROJECT MANAGEMENT.
36 x 2 = ? A) 36 B) 72 C) 48 D) 76.
Chapter 5: Project Time Management Doddy Prayogo, Ph.D.
1. Draw the precedence diagram.
Operations Research Lecture 5.
Project scheduling Chapter 10 Copyright ©2016 Pearson Education, Inc.
Resource Leveling Advantages/Applications of Resource Leveling
Projects: Critical Paths
PLANNING RESOURCES 1. Materials Need to determine 2. Equipment
Weather and Contingency Allowance
Project Management CPM Method Tutorial-p1
THE HIERARCHY OF SCHEDULES
CEM 510 Construction Planning & Scheduling Dr Almohawis
Solving Linear Equations
Project Planning By Phaik San Liew.
Project Management (lecture)
Chapter 6 Activity Planning.
Planning assignment in MS-Project

Project Management (lecture)
Adding with 9’s.
Adding with 10’s.
Chapter 6 Activity Planning.
Adding ____ + 10.
Warmup Chapter P Review
A feasible solution for problem 2.
CHAPTER ONE: RESOURCE ALLOCATION AND SCHEDULING
Solving Linear Equations
Scheduling.
Presentation transcript:

Prof. Awad Hanna Precedence Diagram Advantages of using Precedence Diagram: 1. No dummy activity are required. 2. A single number can be assigned to identify each activity. 3. Analytical solution is simpler.

Prof. Awad Hanna Redundant Linkages 20 A 30 B 30 C 20 A 30 B 40 C (a) Incorrect Representation (b) Correct Representation

Prof. Awad Hanna Closing the network to give Single Beginning and Ending Nodes AD CE B (a) Incorrect Representation AD CE (b) Correct Representation Starting DummyFinish Dummy B

Prof. Awad Hanna Retaining Wall Precedence Diagram Wall 1 Wall 2 Footing 1 Footing 2 10 Footing 1 40 Wall 2 20 Footing 2 30 Wall 1

Prof. Awad Hanna Precedence Diagram - Sequence Stepped and Numbered 10 A 25 E 20 C 30 F 2 5 Start 35 Finish 15 D 31 4

Prof. Awad Hanna Constructing the Precedence Diagram 1.Create Activity list and eliminate redundancies. 2.Construct precedence diagram  Activities with no dependency arranged at the left  Create dummy start if you have more than one start “Contract Award” 3.Arrange activities in a sequential order