SAP Costing Procedure Montaser Daoud
SAP System application and product data processing (SAP) it was founded in Germany 1975 SAP software help organizations to manage business operation and customer relations
SAP Organizational Structure
In SAP the material are always valuated at the valuation area level. And the costing should be performed only at the plant level.
SAP Organizational Structure Clint is a self contained unit in the system with separate master record Controlling Area which represents a system that used for cost accounting purposes Company Code it’s an entity that differentiate its self from others for tax purposes.
SAP Organizational Structure Valuation Area is defined based on the valuation level of material stuck. Plant is an organizational unit that defined it based on the production, location, maintenance and material planning
I 7 I 7 PROPOSED STRUCTURE Purch. Org. Plant Valuation. Code C. Code T56M13 JP06 P ZVACVCCPVBCPVJPN SY02 Sales Org. FEM plants abc KU01 ZVCCVCPOVBPOPO16PO90 OCJ3OCJ1OCJ2 OCJ5 OCJ4 T36M96 E34 T35H68
Master Material Data Master Data is where the part are created and controlled Master data have different controlling areas which are controlled by finance, logistic, and engineer.
Master Material Data
Controlling and finance Work center is the organization unit where an operation is done. A work center indicates precisely one cost center and different action types, or a business process. Cost Centers gather costs for areas with overhead expenses.
Bill of material (BOM) BOM is a list of the raw materials, sub-assemblies, parts and the quantities of each needed to manufacture an end product.
Rate / Routing
Costing CK11N
Costing Release
Plant Costing For costing a plant or multiple materials costing the user should use transaction CK40N which will allow him to chose the plant or multiple plants in the same company code, or the different type of component like FING for finish good parts or COMP for component
CK40N Costing
ZC13
ZC14