Copyright © 2014 Pearson Education, Inc. publishing as Prentice Hall 13 - 1.

Slides:



Advertisements
Similar presentations
Chapter 14 Measuring and Assigning Costs for Income Statements
Advertisements

©2002 Prentice Hall Business Publishing, Introduction to Management Accounting 12/e, Horngren/Sundem/Stratton Chapter 15 Overhead Application: Variable.
Copyright © 2014 Pearson Education, Inc. publishing as Prentice Hall
Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall. Chapter 23 1.
Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall. Chapter 23 1.
© John Wiley & Sons, 2005 Chapter 14: Measuring and Assigning Costs for Income Statements Eldenburg & Wolcott’s Cost Management, 1eSlide # 1 Cost Management.
Cost Management Session 7. Overview Theory Exercise: 10.33, 10.37, 10.56,
Overhead Application and Disposition Managerial Accounting Prepared by Diane Tanner University of North Florida Chapter 32.
©2002 Prentice Hall Business Publishing, Introduction to Management Accounting 12/e, Horngren/Sundem/Stratton Flexible Budgets Distinguish between.
CHAPTER 14: MEASURING AND ASSIGNING COSTS FOR INCOME STATEMENTS Cost Management, Canadian Edition © John Wiley & Sons, 2009 Chapter 14: Measuring and Assigning.
Inventory Costing and Capacity Analysis
Kinney ● Raiborn Cost Accounting: Foundations and Evolutions, 8e © 2011 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated,
©2003 Prentice Hall Business Publishing, Cost Accounting 11/e, Horngren/Datar/Foster Job Order Costing Chapter 4 2/14/05.
November 16, Part 4 The Value Chain Job Costing and Overhead Rates Actual versus Budgeted Amounts Levi Strauss Factory Example Absorption Costing and Variable.
Segment Reporting and Performance Evaluation
©2008 Prentice Hall Business Publishing, Introduction to Management Accounting 14/e, Horngren/Sundem/Stratton/Schatzberg/Burgstahler Introduction.
9 - 1 ©2003 Prentice Hall Business Publishing, Cost Accounting 11/e, Horngren/Datar/Foster Inventory Costing and Capacity Analysis Chapter 9.
Contemporary Engineering Economics, 4 th edition, © 2007 Estimating Profit from Production Lecture No. 31 Chapter 8 Contemporary Engineering Economics.
Copyright © 2012 Pearson Education Chapter Copyright © 2012 Pearson Education Develop activity-based costs (ABC)
1-1.
Copyright © 2014 Pearson Education, Inc. publishing as Prentice Hall.
Copyright © 2014 Pearson Education, Inc. publishing as Prentice Hall
©2003 Prentice Hall Business Publishing, Cost Accounting 11/e, Horngren/Datar/Foster An Introduction to Cost Terms and Purposes Chapter 2 1/31/05.
Accounting for Overhead .
Additional Topics in Variance Analysis Chapter 17 Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved.McGraw-Hill/Irwin.
Product Costing Systems
Fundamentals of Variance Analysis Chapter 16 Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
Chapter 9 Inventory Costing and Capacity Analysis.
23 Performance Evaluation Using Variances from Standard Costs
The Master Budget and Flexible Budgeting
©2003 Prentice Hall Business Publishing, Cost Accounting 11/e, Horngren/Datar/Foster Learning Objective 1 Define and illustrate a cost object. Chapter.
©2002 Prentice Hall Business Publishing, Introduction to Management Accounting 12/e, Horngren/Sundem/Stratton Chapter 13 Job Costing Systems.
1. Describe and illustrate income reporting under variable costing and absorption costing. 2. Describe and illustrate income analysis under variable costing.
©2002 Prentice Hall Business Publishing, Introduction to Management Accounting 12/e, Horngren/Sundem/Stratton Chapter 8 - Flexible Budgets and Variance.
Copyright © 2008 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin 17 Flexible Budgets, Overhead Cost Management, and Activity-Based.
Chapter 23 Flexible Budgets and Standard Cost Systems
Marketing by the Numbers
© 2013 Cengage Learning. All Rights Reserved. May not be scanned, copied, duplicated, or posted to a publicly accessible website, in whole or in part.
Job-Order Costing for Manufacturing & Service Companies
Absorption Cost Systems Chapter Nine Copyright © 2014 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
Chapter 21 Variable Costing
Factory Overhead Planned, Applied & Actual
Fixed Overhead Variance Spoilage, Rework and Scrap
CHAPTER NINE Absorption Cost Systems. McGraw-Hill/Irwin © 2003 The McGraw-Hill Companies, Inc., All Rights Reserved. 9-2 Outline of Chapter 9 Absorption.
©2003 Prentice Hall Business Publishing, Cost Accounting 11/e, Horngren/Datar/Foster An Introduction to Cost Terms and Purposes Chapter
Absorption Cost Systems Chapter Nine McGraw-Hill/Irwin Accounting for Decision Making and Control, 5/e © 2006 The McGraw-Hill Companies, Inc.,
©2005 Prentice Hall Business Publishing, Introduction to Management Accounting 13/e, Horngren/Sundem/Stratton Flexible Budgets and Variance Analysis.
24 - 1©2002 Prentice Hall, Inc. Business Publishing Accounting, 5/E Horngren/Harrison/Bamber Flexible Budgets and Standard Costs Chapter 24.
COST MANAGEMENT Accounting & Control Hansen▪Mowen▪Guan COPYRIGHT © 2009 South-Western Publishing, a division of Cengage Learning. Cengage Learning and.
Overhead Application: Variable and Absorption Costing.
Accounting for Overhead Costs Introduction to Management Accounting Chapter 6.
1 3 Standard Costing, Variable Costing, and Throughput Costing
Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Estimating Profit from Production.
©2003 Prentice Hall Business Publishing, Cost Accounting 11/e, Horngren/Datar/Foster Learning Objective Distinguish actual costing from normal costing.
12-1 Introduction to Product Costing Prepared by Douglas Cloud Pepperdine University Prepared by Douglas Cloud Pepperdine University 12.
Product Costing and Cost Accumulation in a Batch Production Environment Chapter 3 Copyright © 2014 McGraw-Hill Education. All rights reserved. No reproduction.
Chapter 23 Flexible Budgets and Standard Cost Systems.
Flexible Budgets and Standard Costs Chapter 24. Objective 1 Prepare a Flexible Budget for the Income Statement.
Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall. Chapter 23 1.
© John Wiley & Sons, 2011 Chapter 14: Measuring and Assigning Costs for Income Statements Eldenburg & Wolcott’s Cost Management, 2eSlide # 1 Cost Management.
Job costing  Several key points from prior chapters: ◦ Cost Objects – include responsibility centers, departments, customers, products, etc. ◦ Direct.
Prepared by Debby Bloom-Hill CMA, CFM
Financial & Managerial Accounting 2002e
Chapter 4 Chapter 3 Job Order Costing Job Order Costing.
17 Flexible Budgets, Overhead Cost Management, and Activity-Based Budgeting.
Chapter 3: Predetermined Overhead Rates, Flexible Budgets, and Absorption/ Variable Costing Cost Accounting Principles, 8e Raiborn and Kinney.
© 2011 Cengage Learning. All Rights Reserved
Overhead Allocation and Disposition
AMIS 3300 Chapter 9.
Presentation transcript:

Copyright © 2014 Pearson Education, Inc. publishing as Prentice Hall

Copyright © 2014 Pearson Education, Inc. publishing as Prentice Hall Chapter 13 Accounting for Overhead Costs

Copyright © 2014 Pearson Education, Inc. publishing as Prentice Hall Chapter 13 Learning Objectives 1. Compute budgeted factory-overhead rates and apply factory overhead to production. 2. Determine and use appropriate cost- allocation bases for overhead application to products and services. 3. Use normalized variable- and fixed-overhead application rates and explain the disposition of overhead variances.

Copyright © 2014 Pearson Education, Inc. publishing as Prentice Hall Compare variable- and absorption-costing systems Construct an income statement using the variable-costing approach Construct an income statement using the absorption-costing approach. Chapter 13 Learning Objectives

Copyright © 2014 Pearson Education, Inc. publishing as Prentice Hall Distinguish between product-costing and planning-and-control purposes in accounting for variable and fixed costs. 8. Compute the production-volume variance and show how it should appear in the income statement. 9. Reconcile variable- and absorption-costing operating income and explain why a company might prefer to use a variable-costing approach. Chapter 13 Learning Objectives

Copyright © 2014 Pearson Education, Inc. publishing as Prentice Hall Accounting for Factory Overhead Methods for assigning overhead costs to the products are an important part of accurately measuring product costs. Learning Objective 1 Years ago, direct materials and direct labor were the largest costs for most companies. Today, automated companies have lower direct labor costs but much larger overhead costs.

Copyright © 2014 Pearson Education, Inc. publishing as Prentice Hall Budgeted Overhead Application Rates 1. Select one or more cost-allocation bases. 2. Prepare a factory overhead budget. 3. Compute the factory overhead rate. 4. Obtain actual cost-allocation base data. 5.Apply the budgeted overhead to the products or services. 6. Account for any differences between the amount of overhead actually incurred and overhead applied.

Copyright © 2014 Pearson Education, Inc. publishing as Prentice Hall Total budgeted Amount of cost driver Budgeted Overhead Application Rates Overhead rates are budgeted; they are estimates. The budgeted rates are used to apply overhead based on actual events. Total budgeted Factory overhead Budgeted overhead application rate =

Copyright © 2014 Pearson Education, Inc. publishing as Prentice Hall Illustration of Overhead Application Enriquez Machine Parts Company selects a single cost-allocation in each department for applying overhead, machine hours in machining and direct-labor in assembly.

Copyright © 2014 Pearson Education, Inc. publishing as Prentice Hall Illustration of Overhead Application Thus, we would apply $44 of overhead to a product that uses 6 MH in machining and incurs direct-labor cost of $40 in assembly. Machining: 6 actual MH X $4 per MH= $24 Assembly: $40 of DL cost X 50% = 20 Total overhead $44 Total overhead applied to a particular product equals budgeted overhead rates multiplied by actual machine hours (MH) or labor cost (LC) used by that product.

Copyright © 2014 Pearson Education, Inc. publishing as Prentice Hall Illustration of Overhead Application Suppose that at the end of the year Enriquez had used 70,000 machine hours in Machining. How much overhead was applied to Machining?

Copyright © 2014 Pearson Education, Inc. publishing as Prentice Hall Illustration of Overhead Application Suppose that at the end of the year Enriquez had incurred $190,000 in direct labor cost. How much overhead was applied to Assembly?

Copyright © 2014 Pearson Education, Inc. publishing as Prentice Hall Illustration of Overhead Application Total factory overhead applied: Machining: $280,000 Assembly: 95,000 Total Factory Overhead Applied $375,000 The $375,000 is an estimate of Enriquez’s overhead for the year, and it will become part of the cost of goods sold expense on Enriquez’s income statement when the units produced are subsequently sold.

Copyright © 2014 Pearson Education, Inc. publishing as Prentice Hall Choice of Cost-Allocation Bases No one cost-allocation base is right for all situations. A separate cost pool should be identified for each cost-allocation base. The accountant’s goal is to find the cost- allocation base that best links cause and effect. Learning Objective 2 Base 1 Pool 1 Base 2 Pool 2

Copyright © 2014 Pearson Education, Inc. publishing as Prentice Hall Normalized Overhead Rates “Normal” product costs include an average or normalized chunk of overhead. Actual direct material + Actual direct labor + Normal applied overhead = Cost of manufactured product Learning Objective 3

Copyright © 2014 Pearson Education, Inc. publishing as Prentice Hall Disposing of Underapplied or Overapplied Overhead Recall that Enriquez applied $375,000 to its products, but... it incurred $392,000 of actual manufacturing overhead during the year. $392,000 actual overhead –375,000 applied overhead $ 17,000 underapplied overhead The $375,000 becomes part of Cost of Goods Sold when the product is sold, however...

Copyright © 2014 Pearson Education, Inc. publishing as Prentice Hall Disposing of Underapplied or Overapplied Overhead The applied overhead is $17,000 less than the amount incurred. It is: Overapplied overhead occurs when the amount applied exceeds the amount incurred. A company must report actual costs incurred in its financial statements.

Copyright © 2014 Pearson Education, Inc. publishing as Prentice Hall Disposing of Underapplied or Overapplied Overhead 1) Write-off to cost of goods sold 2) Proration, apportioning over- or underapplied overhead to cost of goods sold, work-in-process inventory, and finished-goods inventory in proportion to the ending balances of each account. Accountants uses two methods for the adjustment:

Copyright © 2014 Pearson Education, Inc. publishing as Prentice Hall Immediate Write-Off Manufacturing Overhead 392, ,000 = 17,000 Cost of Goods Sold Incurred Overhead (Actual) Applied Overhead (Budgeted) This method regards the $17,000 as a reduction in current income and adds it to Cost of Goods Sold.

Copyright © 2014 Pearson Education, Inc. publishing as Prentice Hall Prorating Among Inventories This method prorates the $17,000 of underapplied overhead to Work-In-Process (WIP), Finished Goods, and Cost of Goods Sold accounts. Companies generally prorate overhead variances only when material.

Copyright © 2014 Pearson Education, Inc. publishing as Prentice Hall Variable and Fixed Application Rates The presence of fixed costs is a major reason of costing difficulties. Some companies distinguish between variable overhead and fixed overhead for product costing.

Copyright © 2014 Pearson Education, Inc. publishing as Prentice Hall Variable Versus Absorption Costing Variable costing excludes fixed manufacturing overhead from the cost of products. Absorption costing includes fixed manufacturing overhead in the cost of products. Variable costing Absorption costing Learning Objective 4

Copyright © 2014 Pearson Education, Inc. publishing as Prentice Hall Variable Versus Absorption Costing

Copyright © 2014 Pearson Education, Inc. publishing as Prentice Hall Facts for Illustration Direct material $205 Direct labor 75 Variable manufacturing overhead 20 Standard variable costs per unit $300 Basic Production Data at Standard Cost

Copyright © 2014 Pearson Education, Inc. publishing as Prentice Hall Facts for Illustration The annual budget for fixed manufacturing overhead is $1,500,000 Budgeted production is 15,000 computers. Sales price = $500 per unit $20 per computer is variable overhead. Sales commissions = 5% of dollar sales Fixed S&A expenses = $650,000

Copyright © 2014 Pearson Education, Inc. publishing as Prentice Hall Facts for Illustration There are no variances from the standard variable manufacturing or selling and administrative costs, the actual fixed manufacturing overhead incurred is $1,500,000 each year, and the actual fixed selling and administrative cost is $650,000 each year. Actual product quantities are:

Copyright © 2014 Pearson Education, Inc. publishing as Prentice Hall Comparative Income Statement Using Variable-Costing Learning Objective 5 Desk PC Division: Comparative Income Statements

Copyright © 2014 Pearson Education, Inc. publishing as Prentice Hall Fixed-Overhead Rate The fixed-overhead rate is the amount of fixed manufacturing overhead applied to each unit of production. $1,500,000 ÷ 15,000 = $100 budgeted fixed manufacturing overhead expected volume of production Fixed overhead rate =

Copyright © 2014 Pearson Education, Inc. publishing as Prentice Hall Absorption-Costing Method Comparative Income Statement Desk PC Division: Comparative Income Statements Learning Objective 6

Copyright © 2014 Pearson Education, Inc. publishing as Prentice Hall Variable Costing vs. Absorption Costing On a variable-costing income statement, costs Are separated into the Major categories of fixed and variable. Revenue less all variable costs (both manufacturing and non- manufacturing) is the contribution margin.

Copyright © 2014 Pearson Education, Inc. publishing as Prentice Hall Variable Costing and Absorption Costing On an absorption-costing income statement, costs are separated into the major categories of manufacturing and non-manufacturing. Revenue less manufacturing costs (both fixed and variable) is gross profit or gross margin.

Copyright © 2014 Pearson Education, Inc. publishing as Prentice Hall Product-costing and planning-and- control purposes in accounting for variable and fixed costs. Variable and Fixed Unit Costs: To stress the basic assumptions behind absorption costing, split manufacturing overhead into variable and fixed components. Learning Objective 7 The differences between variable- and absorption-costing formats arise because the two formats treat fixed manufacturing overhead differently.

Copyright © 2014 Pearson Education, Inc. publishing as Prentice Hall Fixed Overhead and Absorption Costs of Product (2) the manufacturing overhead costs applied to products under an absorption-costing system (1) the manufacturing overhead costs in the flexible budget used for departmental budgeting and control purposes Compare With

Copyright © 2014 Pearson Education, Inc. publishing as Prentice Hall Variable Overhead Costs The expected variable-overhead costs from the flexible budget are the same as the variable- overhead costs applied to the products.

Copyright © 2014 Pearson Education, Inc. publishing as Prentice Hall Fixed Overhead Costs The graph for applied fixed-overhead costs differs from that for the flexible budget.

Copyright © 2014 Pearson Education, Inc. publishing as Prentice Hall Production-Volume Variance Production-volume variance = (actual volume – expected volume) X fixed overhead rate In practice, accountants often call the production-volume variance simply the volume variance. The difference between applied and budgeted fixed overhead is the production-volume variance. Learning Objective 8

Copyright © 2014 Pearson Education, Inc. publishing as Prentice Hall Production-Volume Variance 2. When actual volume is less than expected volume, the production-volume variance is unfavorable because usage of facilities is less than expected and fixed overhead is underapplied. 1. When expected production volume and actual production volume are identical, there is no production-volume variance. A production-volume variance arises when the actual production volume achieved does not coincide with the expected volume of production used as a denominator for computing the fixed- overhead rate for product-costing purposes:

Copyright © 2014 Pearson Education, Inc. publishing as Prentice Hall Reconciliation of Absorption- Costing and Variable-Costing The difference in variable-costing and absorption-costing operating income can be explained by multiplying the fixed-overhead product-costing rate by the change in the total units in the beginning and ending inventories. Consider 20X1: The change in inventory was 2,000 units, so the difference in net income would be 2,000 units × $100 = $200,000. Learning Objective 9

Copyright © 2014 Pearson Education, Inc. publishing as Prentice Hall Effects of Sales and Production on Reported Income The relationship between sales and production determines the difference between variable-costing and absorption-costing income. Whenever units sold are greater than (less than) units produced, variable-costing income is greater than (less than) absorption costing income. This means that when inventories decrease (increase), variable-costing income is greater than (less than) absorption-costing income.

Copyright © 2014 Pearson Education, Inc. publishing as Prentice Hall All rights reserved. No part of this publication may be reproduced, stored in a retrieval system, or transmitted, in any form or by any means, electronic, mechanical, photocopying, recording, or otherwise, without the prior written permission of the publisher. Printed in the United States of America.