Development through partnership Infrastructure Delivery Management Toolkit: 2010 Edition Delivery Process 3: Operations & Maintenance 1.

Slides:



Advertisements
Similar presentations
Introduction to our Facilities Management Services
Advertisements

Bridge Owners Forum Code of Practice for Bridge Management Research Opportunities Graham Cole s.
Long Term Capital Works Planning - An Evidenced Based Process Vivek Kangesu BSc Eng (Hons), MBA, MIEAust, CPEng, RPEQ.
ACES Presidential Conference 2011 Turning Data into Wisdom Terry Pitt MSc FRICS MIAM © Atrium Software Ltd 2011.
Effectively Integrating Information Technology (IT) Security into the Acquisition Process Section 4: Effective Integration.
Developing & operating a corporate landlord model
HB1438 Update & Statewide Capital Planning Initiative Office of State Finance Department of Central Services November 8, 2011.
Software Engineering CSE470: Process 15 Software Engineering Phases Definition: What? Development: How? Maintenance: Managing change Umbrella Activities:
ITIL: Service Transition
Capital Projects What is a Capital Project? What is a Public Works Project? State of Louisiana Facility Planning & Control.
Application of Asset Management Principles During Asset Creation and Design Presented By Pervaiz Anwar at: CWEA, San Francisco Bay Section Asset Management.
Electricity Meter Installation QC and Audit Total Geo-spatial Information Solutions Johann Engelbrecht Director.
Experience, Technology and Focus in Mid Market CRM Soffront Asset management: An Overview.
Chapter 3 Asset Management. 2 Asset management Asset management = infrastructure management Infrastructure management = Capital management = Asset management.
Asset Management Data & Systems Jim Wilkin. Asset management a corporate function Asset Management group Centralised asset management database, Asset.
R R R CSE870: Advanced Software Engineering (Cheng): Intro to Software Engineering1 Advanced Software Engineering Dr. Cheng Overview of Software Engineering.
NGEC - SFTF Structure and Finance Task Force Eric Curtit, MODOT Section 6 Project Update.
Presentation Roadmap Maintenance Contract Model Options
Introduction to Facilities Management (FM). Facilities Management Benefits of FM for BSF Maximum benefits can be achieved by transferring all FM services.
DOE OFFICE OF INDIAN ENERGY Renewable Energy Project Development and Finance Framework: The 5 Step Process 1.
Federal Property Management Professor Andrew Baum September 19th 2014.
Comparison of International P3 Model, Corp and Hybrid Lease The Great Debate:
Accounting systems design & evaluation
Manage the Facility Condition Index (FCI)
Standard WBS Version 1.0 WBS2-3.pptPage 1 Standard Work Breakdown Structure Legend = Decomposes to lower level WBS elements 4.0 Implementation 4.0 Implementation.
Dillon: CSE470: SE, Process1 Software Engineering Phases l Definition: What? l Development: How? l Maintenance: Managing change l Umbrella Activities:
Development through partnership Infrastructure Delivery Management Toolkit: 2010 Edition Delivery Process 1: Portfolio Management Infrastructure Planning:
SA Local Government Procurement Forum “Value for Money” Amendments to the Local Government Act….. what does it mean?, how do you manage it? how do you.
SESSION 10 ASSET SEGMENT PRESENTED BY: NATIONAL TREASURY.
Maximising Investment Opportunities: releasing value from estates Barclays Private Equity 15 th May 2008.
American Model. Public-Private Partnerships Public Development Private Development Public-Private Partnerships PrivatizationSubsidization.
Reserve Study A Short and Long Term Budgetary Planning Vehicle
Physical Building Audit Physical Building Audit By; Engr.Dr.Attaullah Shah PhD ( Civil) Engg, MSc Engg ( Strs), BSc Engg ( Gold Medalist),), MBA, MA (
1 Infrastructure Blue Ribbon Commission November 18, 2010 July 18, 2011 December 22, 2011 Council Work Session July 18, 2011 City of Palo Alto.
BTEC National Diploma – IT Practitioners Unit 16 - Maintaining Computer Systems.
MAINTENANCE, REPAIR, REHABILATATION, REFRUBISHMENT, UPGRADE AND ADDITION National/Provincial Road shows July/ August
Presentation on Preventive Maintenance
KS3 Phase4 Client Server Monitoring System October 1, 2008 by Stephen, Seema, Kam, Shpetim.
RFP for Public-Private Partnerships JULY 20th, 2015.
ASSOCIATED BENEFITS OF mSCOA IN THE ASSET LIFE CYCLE
CHAPTER#17 ENGINEERING MAINTENANCE MANAGEMENT Lecture No. 16Course: Engineering Management MED DEPARTMENT, U.E.T TAXILA COURSE INSTRUCTOR : PROF. DR. SHAHAB.
2014 NPMA Spring Seminar Value Through Professional Asset Management Property 101 Basic Property Tara Miller PMP, CPPM, CF Beth Green CPPM, CF Consultant.
2013 NPMA Fall Conference Value Through Professional Asset Management Property 101 Basic Property Tara Miller PMP, CPPM, CF Beth Green CPPM, CF Consultant.
Criminal Justice System Modernization Project: DPW’s Infrastructure Projects 24 June
International Security Management Standards. BS ISO/IEC 17799:2005 BS ISO/IEC 27001:2005 First edition – ISO/IEC 17799:2000 Second edition ISO/IEC 17799:2005.
Development through partnership Infrastructure Delivery Management Toolkit: 2010 Edition Delivery Process 2: Project Management 1.
PRESENTATION TO THE PORTFOLIO COMMITTEE ON CORRECTIONAL SERVICES SERVICE LEVEL AGREEMENT 02 June 2010.
Mobile GIS in Local Government to enhance Service Delivery Total Geo-spatial Information Solutions Johann Engelbrecht Director.
 1984 Oklahoma State Legislature Study ◦ Broad discrepancies among agencies on rental rates and lease rental contracts. ◦ Legislative Directive to create.
A Risk Based Approach to Asset Management of Alcoa’s Civil Infrastructure in WA Presented by DENNIS FOO, Industrial Maintenance Roundtable ( IMRt )
Copyright © 2006 WBF. All rights reserved. Jean Vieille - Psynapses1 Industrial Information Systems ISA88/95 based Functional Definition Jean Vieille,
Development through partnership Infrastructure Delivery Management Toolkit: 2010 Edition Delivery Process 1: Portfolio Management Introduction Sonny Schmidt.
The BIM Toolkit – An introduction. Overview UK Government Level-2 BIM BIM Toolkit – Technical content BIM Toolkit - Functionality.
Long Term Capital Works Planning - An Evidenced Based Process
Asset Management Data & Systems
Infrastructure Delivery Management Toolkit: 2010 Edition
Infrastructure Delivery Management Toolkit: 2010 Edition
Infrastructure Delivery Management Toolkit: 2010 Edition
Changes and Benefits brought from Modern Procurement to Bridge the Infrastructure Gap Remo Bucci, P.Eng Infrastructure and Capital Projects October 27,
Galt WWTP Clarifier Renewal Program
City Owned Land And Building Review
Overview of City Wide Core Service on Assets/Facilities
Infrastructure Delivery Management Toolkit:
Infrastructure Delivery Management Toolkit: 2010 Edition
HSE Case: Risk Based Approach.
Asset Management Data & Systems
Long Term Capital Works Planning - An Evidenced Based Process
P3 for Small and Midsize Governments
BASICS OF PUBLIC PRIVATE PARTNERSHIPS
Presentation to the Portfolio Committee 20 November 2018
Presentation transcript:

development through partnership Infrastructure Delivery Management Toolkit: 2010 Edition Delivery Process 3: Operations & Maintenance 1

development through partnership 2 Context within the Delivery Processes Summary of contents of DP3 module Contents of this presentation

3 Context within the Delivery Processes Operations and maintenance

Summary of contents of this module Summary of O&M module contents –Process diagram –Process and sub-process explanation –Asset management team general O&M activities –Acquisition of assets –Disposal of assets –Asset hierarchy –Technical condition assessment surveys –Asset management: O&M Facilities Management ‘Engineering Infrastructure Management, Property Management, Asset Register –Maintenance –Remaining life-cycle costing –Risks

Summary of contents of this module The O&M Process –Asset recognition –Mobilisation for Facilities Management –Asset operations, which include Facilities management Engineering infrastructure management Property management Condition assessment surveys and Remaining life-cycle costing –Maintain assets –The demobilisation of Facilities Management

Summary of contents of this module General O&M information –Asset Management team general activities Planning of tasks/activities Execution of tasks/activities Logging of performance and task results Analysis of data Corrective action and improvement Feedback –Acquisition of assets Acquisition of land Acquisition of assets other than land –Disposal of assets –Asset hierarchy An engineering asset/system –Engineering asset: pump room »Engineering system: pump system »Engineering subsystem: a pump »Engineering component: a flange A building asset –A building: office block »A building system: The fire system »A building subsystem: fire detection »Component: a sensor

Summary of contents of this module General O&M information (continue) –Asset Management: O&M Facilities Management (FM) –FM: soft services –FM: hard services (MEP) –Building repairs and preventative maintenance –O&M Planning –Procurement Infrastructure (Engineering) Management –Engineering infrastructure –Infrastructure repairs and preventative maintenance –Planning –Procurement Property Management –Acquisition of property –Managing rates and municipal services payments –Lease management –General advice on property management, e.g. valuations –State Land Management Asset Register –Ownership of Asset Register –Purpose of Asset Register –Typical Information Captured in Asset Register –Users of Asset Register

Summary of contents of this module General O&M information (continue) –Maintenance Maintenance process Definition of Maintenance Maintenance activities –Condition assessments –Inspections –Servicing –Repair Type of maintenance –Preventative maintenance –Essential maintenance, and –Condition-based works (of capital nature) –Remaining life-cycle costing Remaining life-cycle costing elements Time-value of money Costing of Asset Management: Operations –Utility costs, rates and taxes –Facilities Management: Soft Services –Hard services and maintenance –Major upgrades, refurbishments and renovations –Disposal

Conclusion and questions 10 Thank you