Oil Spillage Contingency Plan – County Kerry Mick Boyce, S.E.E., Environment Department, Kerry County Council.

Slides:



Advertisements
Similar presentations
DISASTER PLANNING: Do it Before Disaster Strikes Community Issues Satellite Workshops Department of Commerce & Economic Opportunity.
Advertisements

Shoreline Response Centre (SRC)
[Organisation’s Title] Environmental Management System
Managing Marine Emergencies High Level Management.
Irish Coast Guard Local Authority oil spill Contingency Plans.
Environmental Management System (EMS)
Join the conference call by dialing the conference number in your Invitation or Reminder s. Please put your phone on mute. Please stand by! The webinar.
Records Emergency Planning and Response Webinar Session 2 Join the conference call by dialing the conference number in your Invitation or Reminder s.
Records Emergency Planning and Response. Overview of Emergency Planning and the REAP.
Contractor Safety Management
Alexander Brandl ERHS 561 Emergency Response Environmental and Radiological Health Sciences.
© 2005 Notification and Reporting on Food Incidents: Irish Approach Food & Drugs Authority Bangkok Thailand Dorothy Guina-Dornan.
ISO General Awareness Training
ATC/EMSA/F2 Research&InnovationVertimar Vigo - Spain 1 EMSA: Its role in preventing accidental marine pollution and improving response systems Ana.
Regulatory Body MODIFIED Day 8 – Lecture 3.
Corporate Ethics Compliance *
What Is It And How Will We Measure It?
Business Continuity Check List PageOne. - Why Does Your Business Need A Continuity Checklist? Should the unexpected occur, your business will be able.
EPR-Public Communications L-05
Greg Carter GoA Partnership Symposium. Format AENV role in emergency management AENV role in emergency management AENV role in the field AENV role in.
Rapid Response Network External Agencies Workshop 26 th January 2011 Middleton Railway Paul Armitage Tony Firth.
Protection Against Occupational Exposure
EASTERN MICHIGAN UNIVERSITY Continuity of Operations Planning (COOP)
Appendix 8.1 – Waste Management Plan Oil Spill Contingency Plan – Land Document Number: KOC.SA.020 Incident Name: Incident Date/Time: Incident Location:
Ship Recycling Facility Management System IMO Guideline A.962
Occupational Health and Safety
Module 3 Develop the Plan Planning for Emergencies – For Small Business –
Records Managers’ Forum 28 February Draft standard on the appraisal and disposal of State records Catherine Robinson Senior Project Officer, Government.
Organization and Implementation of a National Regulatory Program for the Control of Radiation Sources Staffing and Training.
Unit 8:COOP Plan and Procedures  Explain purpose of a COOP plan  Propose an outline for a COOP plan  Identify procedures that can effectively support.
The Policy Company Limited © Control of Infection.
DPG HEALTH MEETING USAID CONFERENCE ROOM 6 NOVEMBER 2013 International Health Regulation (2005)
Presented by: Meg Boyd The Blue Mountains Drinking Water System: DWQMS Overview.
Clare County Council Oil spill Contingency Plan Recent Major Exercises Paul Moroney BE (Civil), C. Eng. M.I.E.I. M.C.I.Arb. Head of the Environment Section.
The Emergency Operations Plan. Primary Reference Emergency Management Principles and Practices for Healthcare Systems, The Institute for Crisis, Disaster.
D1.HGE.CL7.01 D1.HGA.CL6.08 Slide 1. Introduction Design, prepare and present reports  Classroom schedule  Trainer contact details  Assessments  Resources:
Developing Plans and Procedures
Circuit Rider Training Program (CRTP) Circuit Rider Professional Association Annual General Meeting and Conference August 30, 2012.
Health & Safety Awareness - The basics. Sharon Currie Robert Fisher HWL Advisers (OH&S)
Organization and Implementation of a National Regulatory Program for the Control of Radiation Sources Regulatory Authority.
Staffing and training. Objectives To understand approaches to the development of strategies and policies for staffing of a Regulatory Authority including.
NFPA 1600 Disaster/Emergency Management and Business Continuity Programs.
SEA in the Czech Republic Prague, 24 September 2008.
International Atomic Energy Agency Roles and responsibilities for development of disposal facilities Phil Metcalf Workshop on Strategy and Methodologies.
Disaster Planning Workshop Hosted By: Pleasantview Fire Protection District.
Helen Johnson Head of Study Abroad, Office for Global Engagement Assessing and Managing Risk for Study Abroad.
1 Waste Discharge Authorization Application - British Columbia WG6 Application Process WG Document Review presented by Helga Harlander October x, 2008.
International Atomic Energy Agency Regulatory Review of Safety Cases for Radioactive Waste Disposal Facilities David G Bennett 7 April 2014.
MODULE 2 READNESS. OBJECTIVES Prioritize personal values and describe their relationship to incident management and firefighter safety Company Officer’s.
Report Performance Monitor & Control Risk Administer Procurement MONITORING & CONTROLLING PROCESS.
California Department of Public Health / 1 CALIFORNIA DEPARTMENT OF PUBLIC HEALTH Standards and Guidelines for Healthcare Surge during Emergencies How.
CBIZ RISK & ADVISORY SERVICES BUSINESS CONTINUITY PLANNING Developing a Readiness Strategy that Mitigates Risk and is Actionable and Easy to Implement.
RISK MANAGEMENT FOR COMMUNITY EVENTS. Today’s Session Risk Management – why is it important? Risk Management and Risk Assessment concepts Steps in the.
CDM Construction Design and Management
Environment Mick Borwell Environmental Issues Director.
2007 Office of Risk Management Annual Conference 2007 David M. Shapiro Disaster Planning & Recovery Consultants
Business Continuity Planning 101
ENVIRONMENTAL MANAGEMENT REQUIREMENTS. ISO GOU has obtained certification for ISO 14001:2004 All contractors to be ISO compliant.
OPRC Level 3 Spill Management Roles & Responsibilities.
EIAScreening6(Gajaseni, 2007)1 II. Scoping. EIAScreening6(Gajaseni, 2007)2 Scoping Definition: is a process of interaction between the interested public,
OPRC Level 3 The Contingency Planning Process. OPRC Level 3.
1 Emergency Management Overview Scott Ritzer Emergency Response and Security Enbridge Pipelines Inc.
Disaster and Emergency Planning
Facility Manager IPM PLAN and Policy
Emergency Operations Plan
Continuity of Operations Plan/Continuity of Government (COOP/COG)
Environmental Services Training Group
Facility Manager IPM PLAN and Policy
Marine Pollution Response Service
Contingency Planning for Accidental Surface Water Pollution​ GROUP HSE RULE (CR-GR-HSE-705) EXECUTIVE SUMMARY This rule sets specific requirements to be.
Presentation transcript:

Oil Spillage Contingency Plan – County Kerry Mick Boyce, S.E.E., Environment Department, Kerry County Council.

Thanks to : Conor Culloo; Vincent Hayes; SEA-PT (Hugh Conlon).

Incidents (Kerry) : Ranga (1980) – Slea Head; Celestial Dawn (2002) – Dingle Harbour; Fidelma (2002) – Inish na bro (Blaskets).

Purpose of the Plan : A guide to aid in the coordination of response to a marine-based Oil/HNS incident; To guide responders through the actions and decisions required to mount an effective response to a marine-based Oil/HNS incident; A guide to limit/mitigate the effects of such an event.

Background Context : Legal requirement to produce appropriate plan (Sea Pollution Act); Number of marine-based incidents around the coast of Kerry; SEA-PT and Harbour Board plans already in place.

Background Context (Contd.) : County Oil Pollution Officer [COPO] in place (me!) – appointed by Manager’s Order; Large KCC stock-pile built up over many years (TVH); Members of SEA-PT; In-house experience (previous incidents, training etc.)

Plan preparation options: Outsource; In-house. Decision criteria : Budgetary considerations; Data gathering/local knowledge; Availability of in-house knowledge and expertise; Use of standard IRCG format (generic format and data). Final Decision : In-house

Initial Stages of Plan preparation : Staff member assigned to prepare the plan; In-house group established to oversee the project ; Internal and external consultations (state agencies and departments, NGOs etc.) - limited response; Data gathering (assets at risk etc.); Literature review (availability of generic material).

Format : standard IRCG template; Coverage : coastline (seashore) within the functional area of Kerry County Council (excluding SEA-PT and Harbour Board areas); Preparation timeframe : approx. 3 months; On-going review by implementation group during period of preparation of plan;

Submission of various drafts to IRCG.; Approved by IRCG in May, 2012; Lifespan : 5 years; Annual up-date/review.

Main Elements of the Plan

Part 1 - Strategy

Relationship with other plans : SEA-PT & Harbour Plans; Major Emergency Plan etc. Roles & Responsibilities (including Internal command structure): Local Authority (Shoreline Response); IRCG etc.

Risk Assessment : Sensitive Coastline (SAC, SPA, Shellfish, Blue Flag...); Marine traffic (fishing, leisure, commercial traffic etc.); Wide variation in coastline types; Tourism reputation etc.

Response Strategies and Plans : What are we dealing with (classification : type of Oil/HNS)? How much (quantification)? How will it behave in the marine environment (fate and likely destination)? How might we deal with it (containment and recovery options)?

Tiered Response : Tier 1 : Background and minor operational spills resulting in shoreline pollution which can be dealt with by the relevant local authority or harbour authority.

Tier 2 : Small-scale incidents where local authority may require mutual aid in order to initiate and maintain a shoreline response

Tier 3 : A large spill where substantial further resources may be required and support from national government is necessary through the implementation of the National Contingency Plan (NCP).

Training & Exercise Policy : What training is to be undertaken (SEA-PT exercises, IRCG courses); Training records.

Scenarios

Part 2 - Actions

Response procedures : Plan activation; Notification formats (who to contact, when and how).

Health & Safety : Risk assessments; Safe work procedures, Safety Data Sheets etc.

Waste Management : Options for waste minimisation (eg. removal of debris etc.); Identification of potential temporary storage sites etc. (technical amendment to landfill licence.); Details of waste contractors etc.

Part 3 – Data Directory

Contact Directory : Current contact details for all relevant people and organisations etc. Resource Directory : Inventory of equipment etc.

Part 4 – Cost Recovery

Insurance Options : P & I Clubs, Standard Insurance Policies etc. Financial Control : Record keeping (what costs are being incurred and on what basis); Procurement procedures (eg. materials, plant & equipment etc.).

Part 5 – Annexes Includes : Copies of neighbouring plans; Shoreline Protection Strategy (1997) – site-specific booming plans etc.

Issues : Time-consuming; Approval by IRCG; On-going review (keep up-to-date); Designation of COPO & Deputy COPO. General Issues : Large document; Do neighbouring plans talk? One national plan versus plethora of county/harbour plans? 24-hour response? Training?

Inland incidents Regular occurrences; Separate (shorter) emergency response procedures.

o Short (16 pages); o Drinking Water Incident Response Plans; o “A Field Guide to Inland Oil-Spill Clean-up Techniques” – CONCAWE (1983); o Need for national guidance!

Thank You