LHCf 2015 Questions from LMC: – LHCf run scheduled shortly after initial commissioning – can it be delayed? – Present plan below. LHCf to removed at first.

Slides:



Advertisements
Similar presentations
HFT Technical Overview September 26, HFT 2013 TPC FGT 2011 STAR Detectors Fast and Full azimuthal particle identification EMC+EEMC+FMS (-1 ≤ 
Advertisements

LHCf: a LHC Detector for Astroparticle Physics LHCf: a LHC Detector for Astroparticle Physics Lorenzo Bonechi on behalf of the LHCf Collaboration * University.
Technical Coordinator’s Report (KL for PD) Solenoid problems & Schedule Actions on –KL/CN: plan for work to December shutdown –KL/CN: plan for work in.
Impact of LHCf on BRAN and beam monitoring Y.Itow, H.Menjo (Nagoya University) The 1 st TAN integration workshop Mar10, 2006.
02/10/2004 Minimum Bias Trigger Scintillator Counters (MBTS) for early ATLAS running M.Nessi ATLAS week, Freiburg.
CERN – March 10, 2006TAN Installation Workshop - The LHCf experimentOscar Adriani The LHCf experiment Measurement of Photons and Neutral Pions in the Very.
Luminosity Monitor MWPCs, commissioning. A.Kiselev OLYMPUS Collaboration Meeting DESY, Hamburg,
Status & Goals of LHC 1 1pb-1 of delivered and recorded luminosities reached! As of this morning: Delivered: 1420 nb-1 Recorded: 1245 nb-1 New record Inst.
The performance of LHCf calorimeter was tested at CERN SPS in For electron of GeV, the energy resolution is < 5% and the position resolution.
Status of IPBSM Improvement N. Terunuma, KEK 2012/July/13 ATF2 Weekly Meeting.
February 19th 2009AlbaNova Instrumentation Seminar1 Christian Bohm Instrumentation Physics, SU Upgrading the ATLAS detector Overview Motivation The current.
CMS FPIX Reinstallation/Commissioning Lorenzo Uplegger 4/20/091.
11/18/2003Haixin Huang1 RHIC Polarimeter Status All targets and Si detectors have been installed at the end of October. The targets survived the vacuum.
E. Todesco PROPOSAL OF APERTURE FOR THE INNER TRIPLET E. Todesco CERN, Geneva Switzerland With relevant inputs from colleagues F. Cerutti, S. Fartoukh,
2014 DVCS Run Preparations DVCS and GMP Symbiosis Charles Hyde.
LHCf Run status at 7TeV collisions Takashi Sako (Plots: K.Taki, H.Menjo) LPC meeting 12-Apr-2010.
M. Gilchriese ATLAS Upgrade Introduction January 2008.
FUNCTIONAL SPECIFICATION Dorothea Pfeiffer Dennis Haasler GIF++ User Meeting
Undulator Orientation & Electron Beam Spacing Should the undulator frames be toward the central aisle or the tunnel walls? What is the optimum spacing.
Linac-4 current situation and outlook U. Raich, F. Roncarolo, F. Zocca.
CERN, July 7 th, 2010 LHCf status report Oscar Adriani Università degli Studi di Firenze INFN Sezione di Firenze On behalf of the LHCf Collaboration.
GEM chambers for SoLID Nilanga Liyanage University of Virginia.
LHCf: installation & commissioning Measurement of Photons and Neutral Pions in the Very Forward Region of LHC Oscar Adriani INFN Sezione di Firenze - Dipartimento.
LHCf Report Takashi SAKO for the LHCf Collaboration 18-Dec-2009 CERN Main Auditorium.
VVS Prototype Construction at Fermilab Erik Ramberg 26 February,2002 Design issues for VVS Details of VVS prototype design Schedule and Budget Testing.
D0 Status: 01/14-01/28 u Integrated luminosity s delivered luminosity –week of 01/ pb-1 –week of 01/ pb-1 –luminosity to tape: 40% s major.
CALO Commissioning Plans Pascal Perret LPC Clermont 17 March 2008.
D0 Status: 04/01-04/08 u Week integrated luminosity –1.7pb -1 delivered –1.5pb -1 utilized (88%) –1.1pb -1 global runs u Data collection s global data.
US LHC Accelerator Research Program (LARP) Background  Proposed in 2003 to coordinate efforts at US labs related to the LHC accelerator (as opposed to.
Ideas for Super LHC tracking upgrades 3/11/04 Marc Weber We have been thinking and meeting to discuss SLHC tracking R&D for a while… Agenda  Introduction:
Bill Christie For the STAR Collaboration January 5, Outline Detector configuration for Run 16 Data set Goals Desired luminosity profile for Run.
Spanggaard BE-BI(1)RadWG Meeting 6/ Multi-Wire Proportional Chamber and Gas Electron Multiplier Electronics in TT83 Radiation issues.
LHCf Detectors Sampling Calorimeter W 44 r.l, 1.6λ I Scintilator x 16 Layers Position Detector Scifi x 4 (Arm#1) Scilicon Tracker x 4(Arm#2) Detector size.
17/6/2002Ivan Hruska,Francisca Calheiros,Bruno Allongue 1 Radiation test of PL500 in TCC2 Conclusion from last test in Louvain –All DCDC converters ran.
After LS1: wish list from LHCf Takashi SAKO for the LHCf Collaboration 11-Dec-2012LPC meeting1.
What canlearn from about Ken Livingston, University of Glasgow, Scotland.
R ADIATION P ROTECTION ASPECTS LSS1 - TAN REGION Cristina Adorisio (CERN - DGS/RP)
R ADIATION P ROTECTION ASPECTS LSS1 LHC f RE - INSTALLATION Cristina Adorisio (CERN - DGS/RP) LTEX Meeting – May 10 th, 2012.
1 LHCf RE - INSTALLATION – TS4 Operation Time (min) Required Personnel Position Individual Dose (  Sv) Collective Dose (  Sv) -2 Bring downstairs the.
D.Macina TS/LEATOTEM Meeting25/02/2004 Roman Pot test at the SPS Test of the Roman Pot prototype in the SPS proposed in December 2003 (CERN/LHCC ):
1 MICE PM Report Phase One installations to date Phase One remaining items Progress with Phase Two Worries Don’t have time for a detailed status report,
TDAQ and L1Calo and Chamonix (Personal Impressions) 3 Mar2010 Norman Gee.
… getting there … 112/02/2014A. Fabich, EN-MEF-LE.
AWAKE p+ beam line HWC C. Bracco, J. Schmidt Acknowledgment: MCS, EPC, MPE, SPS-OP, BI, ABP (survey),STI, EA, ACE, RP.
RICH Readout Plans F. Bucci, M. Piccini on behalf of the RICH WG.
LHCf: Integration and compatibility with the luminosity monitor
Luminosity monitor and LHC operation
Impact of running with LHCf and early Totem 90 m optics
LHC during week 45 LHC delivered ~0.837 fb-1 in week 45
HF Test station at P5 A.Mestvirishvili.
RHICf Japan meeting General status
Luminosity Monitor Status
PMD PMD Plans Detector Issues and solution Plans for LS1 29 June 2012.
CNRAD dosimetry and Summary of the TS
Baby MIND beam test status
10/month is the present production rate 2 FTE + sporadic contributions
Triple-GEM setup at the GIF++
Success is when preparation meets opportunity
LHC status Benoit Salvant (Beams department, Accelerator and Beam Physics group) for the LHC complex teams With many thanks for their inputs to J. Boyd,
during Fall GMp run (high current)
Summary of Week 26 Main aims: G. Arduini, B. Holzer, M. Lamont
Luminometer Integration at IR2
Summary Thursday h21: Stable beams fill #1303.
Possible parasitic measurement during Fall GMp run
WARNING WARNING WARNING WARNING WARNING WARNING WARNING WARNING
LHC LUMINOSITY (RATE) MONITORS
Experiment DAQ and trigger GMn SBS Collaboration Meeting
LS 1 start date 12th June Schedule Extension 2012 run Extension of 2012 run approved by the DG on 3rd July 2012.
CSC Electronics Installation and Commissioning Oct ‘06
Option 1: Reduced FF Quad Apertures
Presentation transcript:

LHCf 2015 Questions from LMC: – LHCf run scheduled shortly after initial commissioning – can it be delayed? – Present plan below. LHCf to removed at first opportunity after run – i.e. TS1 in present planning Following discussion with Hiroaki MENJO – 29 th August 2014

Requirements Pilot run to qualify DAQ sometime before main run (pile-up not an issue) 11 m is OK – unsqueeze not needed for LHCf 1.5e29 cm -2 s -1, mu = 0.01, Nb < 40, half crossing angle 140 microrad Integrated luminosity: 10 nb -1 Delivery rate about 0.5 nb -1 /hour – need 20 hours Stable Beams – say 2 days plus set-up

Note If LHCf is exposed to the high radiation levels in the TAN associated with high luminosity – it will be damaged – 2 weeks maximum at high luminosity Installation time: – 1 working week – 1 to 2 days physical installation plus cabling and electronics tests Removal time: – 1 to 2 days for both sides

Delay run? If the run is not performed initially, the detector will have to be installed and tested during a later technical stop The run will have to take place reasonably soon after the technical stop to avoid damage 1 – 2 days within 2 weeks of the run will be required to removed the detectors Both installation and removal will have to take place in an irradiated area – this will not be the case if the run takes place during the initial period ALARA strongly favours doing the run as scheduled.