LINKS SURVIVAL POWER AUX POWER VOLTAGE LIMITS LINE CHARGE MVAR LINE

Slides:



Advertisements
Similar presentations
Sistan & Balouchestan Electric Power Distribution Company
Advertisements

Company LOGO Cleco Planning Process. Models Cleco uses SPP’s annual series of models to determine the NERC reliability violations. Cleco uses SPP or VST.
System Voltage Planning Brian Moss PD / Transmission Planning Transmission Planning Overview October 30, 2007.
Inst. of Advanced Energy, Kyoto Univ. 1 Impact of Fusion Reactor on Electricity Grids Yasushi Yamamoto, Satoshi Konishi Institute of Advanced Energy, Kyoto.
Dynamic VAR’s [D-VAR] What are D-VAR Devices? Dynamic VARs… Fully integrated modular STATCOM with proprietary 3X overload Instantaneously injects precise.
Presentation to WECC TSS May 8, 2015
Borah Mitigators Remedial Action Scheme for the Borah West Path Sponsored by: IDAHO POWER Team Members: Kyle Jones Mark Magee Jason Rippee.
EE 369 POWER SYSTEM ANALYSIS
1 Voltage Collapse Animation (AC) Created by Peter W. Sauer Department of Electrical and Computer Engineering University of Illinois at Urbana-Champaign.
Disconnect Switches There are many purposes for disconnect switches in substations and power lines. They are used to isolate or deenergize equipment for.
Marek Kras. A combined cycle gas turbine power plant, frequently identified by CCGT shortcut, is essentially an electrical power plant in which a gas.
System Operator Conference Simulator Drill Orientation 2014 System Operator Conferences Charlotte NC & Franklin TN SERC/SOS Facilitator Team.
1 Green River Utah Area Transmission and Distribution System – January 16, 2009.
Xcel Energy Smaller Scale Transmission Projects Northern MAPP Subregional Planning Group April 3, 2007 Srinivas Vemuri, Jason Standing, and Daniel Kline.
Workshop on Crisis & Disaster Management of Power Sector
Electrical Power Distribution in America % Coal 20.4% Nuclear 20.3% Natural Gas 6% Hydro Electric 3.4% Other
Transmission System in India
1 GENERATION TECHNOLOGIES -- Bhanu Bhushan -- (April, 2011)
Power System 2002 Conference: Impact of Distributed Generation CLEMSON UNIVERSITY ELECTRIC POWER RESEARCH ASSOCIATION 1 Distribution Capacitor Placement.
By A.D.Thirumoorthy Tamil Nadu Electricity Board India.
Performance Equations and Parameters of Transmission Lines
Presenter: Peter Busch
AFREPREN/FWD Cogen Centre Training Workshop on Cogeneration in Africa
Review of the Project for the Consolidation and Upgrade of the CERN Electrical Distribution System October 24-26, 2012 THE HIGH-VOLTAGE NETWORK OF CERN.
Lecture 18 Markets, Fault Analysis Professor Tom Overbye Department of Electrical and Computer Engineering ECE 476 POWER SYSTEM ANALYSIS.
Lecture 32Electro Mechanical System1 Synchronous Reactance  The value of X S can be determined by measurements of the open-circuit and short-circuit tests.
Auxiliary Power Supply System By CGS Gunasekara. Content Why auxiliary supply is needed ? Equipments supplied through auxillary. Modes of operation. Demonstration.
Local Area Study Local Area Study Mitigation Plan Update and Uncertainty Scenarios
AN- NAJAH NATIONAL UNIVERSITY OPTIMUM DESIGN AND PERFORMANCE FOR NABLUS NETWORK Submitted To : Dr. Maher Khammash Prepared By : Haitham Sharaf Ahmad Odeh.
1 GENERATION TECHNOLOGIES -- Bhanu Bhushan -- (April, 2011)
Lecture 18 Fault Analysis Professor Tom Overbye Department of Electrical and Computer Engineering ECE 476 POWER SYSTEM ANALYSIS.
Managing a Power System with 40% Wind Dr Alan Rogers EirGrid.
Tariff in Incentive is calculated as per CERC order Methodology All elements are grouped into following catagories 1.AC Transmission lines =
ERCOT Wind Survey Leo Villanueva. Abilene Mc Camey Big Spring.
SRLDC BANGALORE 20 th March This Presentation Covers … … … Definitions Emphasis of Black Start Restoration in IEGC Causes of Blackouts Restoration.
NLDC1 Defence plan and System restoration. Introduction Inter-Connected operation - widespread propagation of disturbance Inter-Connected operation -
PRESENTATION ON REACTIVE POWER CONTROL S.K.SOONEEGM,SRLDCBANGALORE.
ANALYSIS OF THE OPERATING CONDITION OF Qalqilia ELECTRICAL NETWORK
EXAMPLE A pole mounted 100kVA distribution transformer has the following characteristics R 1 = 1.56  R 2 =  X 1 = 4.66  X 2 =  Volts Ratio.
ECE 476 Power System Analysis Lecture 17: OPF, Symmetrical Faults Prof. Tom Overbye Dept. of Electrical and Computer Engineering University of Illinois.
Jean-Paul BURNET, AB/PO ATC-ABOC days, 22 January 2007 PS Main Power System: What has been done from June 2006? What will be the situation in 2007? PS.
1 Entergy Gulf States, Inc. (Louisiana) Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 31, 2007.
Lecture 11 Power Flow Professor Tom Overbye Special Guest Appearance by Professor Sauer! Department of Electrical and Computer Engineering ECE 476 POWER.
STATE ESTIMATOR QUALITY TRACKING IN BC Hydro EMS IMPLEMENTATION Dr. DJORDJE ATANACKOVIC, P.Eng. Engineering Team Leader, Power system Applications, Grid.
SYSTEM OF SELF-SUFFICIENCY OF ELECTRICITY IN PEAK HOURS The generation system has a design capacity of 7.24 MW, to operate during peak hours and during.
Frankfurt (Germany), 6-9 June Astrid Petterteig, SINTEF Energy Research, Norway – Paper 0840 Presented by Dag Eirik Nordgård, SINTEF Energy Research.
ERCOT Wind Survey Leo Villanueva. Abilene McCamey Big Spring.
8 June AC Supply System
1 8. OPERATING, REACTIVE AND BLACK START RESERVES Asko Vuorinen.
1 Entergy Arkansas, Inc. Proposed Transmission Projects Entergy Transmission Planning Summit New Orleans, LA July 31, 2007.
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N 1 5/09/2011 West of Cascades – North (WOCN) Path BPA Studies Path Definition (for studies) 
Overall Main Components [Electric Power Path] : AC : DC
Presentation For PSAST May 14, Outline Most Limiting N-1-X Events Voltage Limitations For Loss of Three Terminal Monroe- Echo Lake 500kV and Chief.
E Control Devices have a wide range of Latching Relays. The range of latching includes Relays, 16 Amp Latching Relays, 30Amp Latching Relays, 80 Amp Latching.
A Presentation on THERMAL POWER PLANT Sunil Kumar M.E. (5TH)
SEMINAR ON ISLANDING BY PAWAN. What is islanding? Normally all Power generators are interconnected to form a network called ‘GRID’. Some times it so happens.
(c) IRD 2002 Power System Restoration (Black Start) Black Start Panel Session IEEE PES Summer Meeting Chicago, Illinois July 23, 2002 M. M. Adibi IRD Corp.,
بسم الله الرحمن الرحيم Design and analysis of an electric power system, with the design of a load flow program using MATLAB.
Components Motors and Generators.
Components Motors and Generators.
ECE 476 Power System Analysis
Management Of Tulkarm Electrical Network
CIGRE SC B5 COLLOQUIUM CALGARY
GUJARAT POWER OF ENGINEERING AND RESEARCH INSTITUTE (104)
Protective Relaying Conference
PV Solar Projects.
Exercise 8 Power systems.
Exercise 8 Power systems.
ECEN 460 Power System Operation and Control
Power System Analysis (EELE 4351)
Presentation transcript:

LINKS SURVIVAL POWER AUX POWER VOLTAGE LIMITS LINE CHARGE MVAR LINE CURRENTS AUX POWER

Permissible Voltage Limits Voltage Under Normal Condition Max permissible Voltage at the far end of lines normally kept energized from one end Nominal (kV) Max Min kV 132 148 145 120 245 220 245 200 420 400 420 360 735/765 800 700 800

Line Charging MVAR Voltage Conductor used Line Charging MVAR 800kv Class Four Bersimis 2.91MVAR/km 400kV Twin Moose 0.555MVAR/km 220kV Zebra 0.135MVAR/km

Approx. Fault Contribution at HV Bus of GT by:- Approximate Voltage rise at Recieving end per 100km of uncompensated line 0.75 kV for 132kV S/C panther 1.5 kV for 220kV S/C Zebra 3.0kV for 400kV Twin Moose Approx. Fault Contribution at HV Bus of GT by:- 60 MW ( Hydro) 280 MVA 120 MW (Thermal) 490 MVA 210 MW (Thermal) 735 MVA 500 MW (Thermal) 1800 MVA Approx. %Voltage rise/fall at a bus due to removal/addition of a reactor of cap. dQ MVAR = dQ*100 / Fault MVA of the Bus 300 MVAR INJECTION ON A 5000 MVA BUS WOULD CAUSE A 24 KV RISE!

Some Important and Useful Thumb Rules Approx. Line Charging MVAR 132kV Panther: 5 MVAR/100km/ckt 220kV Zebra : 14 MVAR/100km/ckt 400kV Twin Moose: 55 MVAR/100km/ckt Approx. Line Current 132kV: 4.4 A/MVA 220kV: 2.6 A/MVA 400kV: 1.4 A/MVA Approx. Voltage drop per 100kM per 100Amp flow at 0.9 p.f. Lag 5 kV for 132kv S/C Uncompensated Line 3 kV for 220kV S/C Uncompensated Line 1.5kV for 400kV S/C Uncompensated Line

SURVIVAL POWER REQUIREMENT The survival power requirement of 120 MW unit is of the order of 250-350 KW while the requirement of 210 MW unit is of the order of 350-500 KW and for 500 MW unit, it is in the order of 1250-1500 KW. As a general rule, the survival power requirement would be around 0.25- 0.30% of the unit capacity.

AUXILLARY REQUIREMENT The start up power is the power required for the auxiliaries while the generating unit is restored. The requirement of start up power by various units is as follows : Nuclear & Thermal: 7 to 8% of the unit capacity Hydro : 0.5 to 1% of the unit capacity Gas : 1.5 to 2%of the unit capacity The start up power requirement for starting the thermal units is considerably high as the major auxiliaries like BFP, ID Fan. FD fan, CW pumps etc. are of bigger size and the starting torque is considerable. In case of hydro units, the requirement of start-up power is not significant as there are very few auxiliaries.