Highway Maintenance & Rehabilitation

Slides:



Advertisements
Similar presentations
ACEC Conference March 5, 2012 Trudy Elsner P.E., Metro Maintenance, Engineering Services Sheila Johnson P.E., Metro Maintenance, Traffic Services.
Advertisements

Rigid Pavement Concrete. Transverse Cracking Rigid Pavement Transverse Cracking Causes:  Slab longer than 15’ Slab Curl Curing.
From… Maintenance Technical Advisory Guide (MTAG) Chapter 1 Introduction.
Winter Storm ” Snowfall 20 Days of Freezing Rain.
Earthwork Operations & Equipments
1 Preserving Municipality Roadways Federal = 3% State = 20% Local = 77% 94% of paved roads have an Asphalt surface FHWA Source: Stephen R. Mueller,
Highway Engineering Pavement Types
Pavements. Concrete –Rigid pavement Used where strength is an issue Runways, interstates and major roads –Continuous reinforcing Must have a good base.
1 Road maintenance and construction Hossein Naraghi CE 590 Special Topics Safety March 2003 Time spent: 6 hrs.
Pavement Preservation and Maintenance Private Roads Maintenance Workshop August 18, 2012.
TOPIC OF THE DAY Flexible Pavement Distresses/Failure Of Structure.
PUBLIC WORKS DEPARTMENT
Full-Depth Reclamation Using a Cement Slurry Spreader Attached to a Ready Mixed Concrete Truck W. Spencer Guthrie, Ph.D., Associate Professor Charles A.
City of Auburn Hills Road Asset Management Program February 21, 2014 SEMCOG University.
Pavement Management Program Overview February 10, 2015 Presented By: Christopher J. Ott, E.I.
Why Pavement Maintenance and Preservation? Sponsored by: Minnesota T 2 Center Presented by: Michael Marti, P.E. SRF Consulting Group, Inc. Dan Wegman,
CVE 506 HIGHWAY AND TRANSPORTATION ENGINEERING II DR O.S ABIOLA Dept. of Civil Engineering University of Agriculture,Abeokuta.
E20 TALLINN - NARVA RECONSTRUCTION MAARDU - VALGEJÕE.
PUBLIC WORKS OPERATIONS: TRANSPORTATION Steve Hansen, PE Director of Public Works – Liberty, MO APWA PW Institute April 8, 2014.
From… Maintenance Technical Advisory Guide (MTAG) Chapter 1 Introduction.
CE REPAIRS AND REHABILITATION OF STRUCTURES
Mississippi DOT Roadsides, Drainage & Vegetation Management Standards.
Pavement Maintenance II Part 1a: SurfaceTreatments Idaho Roads Scholar Program.
Surface Rehabilitation Treatments
Learning Outcomes Identify safety issues unique to local and rural areas. Identify common challenges to improving road safety. Explain why road agencies.
Preventive Maintenance
PAVEMENT CONDITION SURVEYS Lecture 4. Instructional Objectives n Need for condition surveys n Collection methodologies n Four basic types of condition.
Introduction Transportation System Objectives : Military; Knit together the inhabitants of a territory by providing mutual access and communication; Economic.
Safety Audit Components Safety assessment for risk Management.
Bridge Maintenance and Repair.
Pavement Maintenance II
Pavement Distresses Flexible Pavement
Pavement Preservation Protecting the Investment and the Environment R. Gary Hicks CP2 Center, Chico, CA Prepared for CEAC 2014 Conference March 26-28,
GDOT Maintenance Overview Eric C. Pitts, P.E. State Maintenance Engineer June 28, 2013.
Pavement Analysis and Design
Pavement Preservation Preventive Maintenance
Vegetation Control For Safety Russ Johnson – Maintenance Supervisor - WSDOT Don Petersen – Safety/Design Engineer - FHWA.
Surface Drainage Crown (flat A shape) c Dirt & Gravel: 1/2” - 3/4” per foot (4 - 6 inches in 10 feet)
Influence of Pavement Condition on Project Selection
PAVEMENT MAINTENANCE 1:
Condition Assessment & Funding Needs for North Carolina’s Highway System Report to the Joint Legislative Transportation Oversight Committee December 12,
Technical Services By Nathan Haaland.  Increase in Construction Costs  Asphalt  $350 to $735 per ton  Labor  3.6% increase  Inflation  13% increase.
Road Construction Technology
ODOT. Taking Care of What We Have. Asset Management, Life Cycle Analysis : A Three-Pronged Approach September 9th, 2015 Andrew Williams, Ohio DOT.
Pavement Types Dr. TALEB M. Al-ROUSAN.
BIM Bridge Inspection and Maintenance Technical Standards Branch Class B Bridge Inspection Course Grade Separation Inspection & Ratings Grade Separation.
MODULE 3-3 Patching With Bituminous Mixtures. Learning Objectives  Describe the conditions that require patching  Distinguish between hot-, cold-, and.
Multi-Layer Systems By Vadim Kravtsov Intermountain Slurry Seal, Inc 1.
The Highway Fund – Planning, Measuring, and Reporting Mike Holder, PE, Chief Engineer 2015 CAPA / DOT Workshop February 24, 2015.
ORDINANCE # Authorizing $372,760 for traffic signal interconnect at 47 th Street and Emanuel Cleaver II Boulevard Start of project End of project.
Chip Seal Best Practices by: Larry Galehouse, P.E., P.S., Director National Center for Pavement Preservation.
Region’s Core Services 202/17/2014 Integrity ∙ Excellence ∙ Respect Provide leadership, administrative support, procurement and budgetary and financial.
FLORIDA DEPARTMENT OF TRANSPORTATION MAINTENANCE RATING PROGRAM.
2013 Roads and Sidewalk Capital Programs Roads and Parks Maintenance Department Development & Infrastructure Division December 2, 2013.
Huston, Texas | June Jing Zhang, AICP, PTP, LCI, LEED AP ND AccommodatingCyclists in Accommodating Cyclists in Highway Maintenance Projects -- an.
Design Methods Flexible, Rigid & Composite CBR Method Asphalt Institute method National Crushed Stone Association Design Method California Method AASHTO.
CITY OF BELLEVILLE ROAD IMPROVEMENTS PROGRAM
Roadway Pavement Management Plan
Rating Grade Separations
City of Abilene Pavement Condition Survey 2017 Results and Discussion
Interdisciplinary teams Existing or new roadway
HIGHWAY MAINTENANCE Failures in flexible pavement.
VIGNESH POLYTECHNIC COLLEGE
Surface Preparation before laying Hot Mix
Pavement condition index calculation
20th National Trails Symposium
Introduction to Pavement Design
Pavement Preservation
Safety Audit Components
Presentation transcript:

Highway Maintenance & Rehabilitation Dr. TALEB M. AL-ROUSAN

Highway Maintenance Definitions Maintenance: Is the routine work performed to keep a pavement, under normal conditions of traffic and normal forces of nature, as nearly as possible in its as constructed condition. Maintenance: The function of preserving, repairing, and restoring a highway and keeping it in condition for safe, convenient, and economical use.

Highway Maintenance It includes both physical maintenance activities such as sealing, patching, filling joints, and so forth and traffic service activities including painting pavement markings, removing snow, ice, and litter. Rehabilitation: restoring or betterment of roadway such as resurfacing.

Highway Maintenance Programs Are designed to offset the effects of weather, vandalism, vegetation growth, and traffic wear and damage, as well as deterioration due to the effects of aging, material failures, and design and construction faults.

Why Maintenance is Necessary All Pavements require maintenance. Stresses producing minor effects are constantly working in all pavements. Stresses are: Change in temperature and moisture; Traffic; Small movements in underlying or adjacent earth. Distresses are visible evidence of pavement wear (i.e. they are the end result of the wear process which begins when construction ends). Water lines and other utilities are major area of pavement maintenance.

Pavement Condition Life Cycle

Importance & Challenge of Highway Maintenance Protect investments made in highways. Economic & safety of public road system. Challenges: increased roads (additional mileage of travel), vehicle sizes, and traffic. Traveling public expect higher level of maintenance. Size of maintenance budget.

Maintenance Management Purpose: to capture information about maintenance activities performed & resources expanded. Maintenance management systems do not manage programs, reduce cost or improve performance, rather they provide maintenance engineers with the information and analytical tools needed to allow them to do so.

Maintenance Management Cont. Elements of maintenance management programs: Development of an annual work program (defining activities, quantities, establish performance standards, road inventory & inspection, estimate size of the work program). Budgeting & allocating resources (labor, equipment, Materials). Work authorization & control (various administration levels). Scheduling (balance of workload throughout the year). Performance evaluation (work progress & productivity). Fiscal control (monitor status of expenditures yearly).

Maintenance Operations Road surfaces Shoulders & approaches. Roadsides Bridges, tunnels, & drainage structures. Traffic controls & safety devices. Control of snow & ice.

Maintenance of Road Surfaces Aggregate road surfaces Failures due to: improper drainage, poorly mixed materials, inadequate foundation. Repairs: Patching Blading Scarifying & resurfacing (when areas to be patched are numerous). Stabilization. Bituminous surface treatment

Maintenance of Road Surfaces Cont. Bituminous surfaces Failures due to: weathering, failure of base or subgrade due to material quality or compaction or improper drainage. Repairs: Patching Paint patching Scarifying Resealing. Non skid surface treatment

Maintenance of Road Surfaces Cont. PCC surfaces Repairs: Filling & sealing of joints & cracks Repairing spalled, scaled, & map cracked areas. Patching areas where failure has occurred. Repairing areas damaged by settlement & pumping. Treating buckled pavements.

Maintenance of Shoulders & Approaches Well graded gravel shoulder : blading to proper slope and filling ruts or worn out materials. Turf shoulders: filling holes & ruts, blading, seeding, mow & clean shoulders (weed control). Approaches: include public side roads, private driveways, ramps, speed change lanes, & turnouts. Approach maintenance is similar to shoulder maintenance + extra efforts to maintain potholes, ruts, and other types of deterioration.

Maintenance of Roadsides Roadside: include area between traveled surface & the limit of the right-of-way (medians, roadside parks, right-of-way fences, picnic tables, ..etc. Vegetation management & control (include mowing, weed eradication & control, seeding, planting vegetation, & care of trees & shrubs). Mowing is done to provide sight distance, improve drainage, reduce fire hazards, & improve appearance of the roadway. Seeding & planting vegetation are important for prevention of erosion. Maintenance of rest areas. Litter control.

Maintenance of Bridges, Tunnels, & Drainage Structures Bridges: Maintenance is needed to minimize deterioration or repair damage caused by accidents, floods, or other unforeseen events. Steel bridges: cleaned & painted to prevent erosion. Concrete bridge decks deterioration: Corrosion of reinforcement bars due to penetration of water & deicing salts or chemicals. Bridge decks with minor deterioration: patch with special concrete. Bridge decks with major deterioration: Overlay or remove & construct

Maintenance of Bridges, Tunnels, & Drainage Structures Special attention areas: Supports (check for decays). Tunnel walls & ceilings (check for leaks). Portals (free from loose rocks). Lighting (for visibility) Ventilation Drainage structures Should be kept in good working conditions. Surface drainage, ditches, & culverts.

Maintenance of Traffic Control & Safety Devices Guardrails, barriers, impact attenuators, pedestrian overpasses & underpasses, fence to restrict access of pedestrians & animals. Safety devices should be frequently & systematically inspected & repaired.

Control of Snow & Ice Measures taken for preparing for snow removal are: Necessary equipments (large trucks, snow plows, power graders. Stockpiling of ice-control chemicals. Placing of snow fences, snow guides. Organization arrangements

Pavement Rehabilitation Proper maintenance extend pavement life. However, best-maintained pavements will deteriorate with time and will need rehabilitation. Conventional rehabilitation: Reconstruct with all new material Patch & overlay with new wearing surface. Due to high construction cost, new methods of rehabilitation raised: Pavement Milling (See table 21.4) Pavement Recycling

Pavement Recycling Involves the following: Remove existing pavement fully or partially. Reduce reclaimed material to suitable size. Blending reclaimed materials with virgin aggregate & liquid asphalt. Relaying the material as base, binder, or surface course Advantages of Hot mix Recycling: Economy Conservation of national resources. Improvement of the structural strength of the pavement with little or no change in thickness. Correction of existing deficiencies in the pavement mix.